Installation status Control Room PC farm room DetectorsEB Infrastructure 918 ECN3.

Slides:



Advertisements
Similar presentations
LKr for the dry run (and not only…) R. Fantechi 23/5/2012.
Advertisements

LKr readout: present and future R. Fantechi 30/8/2012.
MSS, ALICE week, 21/9/041 A part of ALICE-DAQ for the Forward Detectors University of Athens Physics Department Annie BELOGIANNI, Paraskevi GANOTI, Filimon.
+ discussion in Software WG: Monte Carlo production on the Grid + discussion in TDAQ WG: Dedicated server for online services + experts meeting (Thusday.
Challenges and Overview From Technical Coordination 27/08/2013 -FH1.
Readout electronics for the MUV detectors R. Fantechi 28/3/2012.
R. Fantechi. DAQ tools My feelings Not dealing with readout stuff No TEL62, no CREAMS, etc But the auxiliary software needed to run the experiment After.
Status of Data Exchange Implementation in ALICE David Evans LEADE 26 th March 2007.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
SPSC Questions to the 2014 NA62 Status Report 1 Beam: which is the beam structure expected in October? Which is the intensity you can reasonably expect?
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
DAQ & ECS for TPC commissioning A few statements about what has been done and what is still in front of us F.Carena.
“Status of TDAQ for the 2012 runs” Gianluca Lamanna (CERN)
Local Trigger Unit (LTU) status T. Blažek, V. Černý, M. Kovaľ, R. Lietava Comenius University, Bratislava M. Krivda University of Birmingham 30/08/2012.
“TDAQ for 2012 runs” Gianluca Lamanna (CERN) Annual review meeting
Proposal for optical and cable network of NA62 trigger system Marián Krivda 1), Cristina Lazzeroni 1), Vlado Černý 2), Tomáš Blažek 2), Roman Lietava 1)2)
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
Progress report Collaboration meeting 23-SEP-2009
TALK, LKr readout and the rest… R. Fantechi, G. Lamanna 15/12/2010.
Status of NA62 straw electronics Webs Covers Services Readout.
Overview, remarks, lamentations, hope and despair M. Sozzi TDAQ WG meeting CERN - 4 June 2013 Introduction, news and appetizer.
NA62 TDAQ WG Meeting News and usual stuff M. Sozzi CERN – 29/5/2009.
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
DØ Online Workshop3-June-1999S. Fuess Online Computing Overview DØ Online Workshop 3-June-1999 Stu Fuess.
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
“Planning for Dry Run: material for discussion” Gianluca Lamanna (CERN) TDAQ meeting
R. Fantechi. TDAQ commissioning Coordination activity started on January Several items to be attacked already in January Regular meetings: 15/1, 29/1,
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
Talk board status R. Fantechi, D. Gigi, G.Lamanna TDAQ meeting, Mainz
Status of the NA62 network R. Fantechi 23/5/2012.
“L1/L2 farm: some thought ” G.Lamanna, R.Fantechi & D. Di Filippo (CERN) Computing WG –
TDAQ news and miscellaneous reports M. Sozzi NA62 TDAQ WG meeting CERN – 13/7/2011.
22/03/11FV 1 NA62 DCS CAN bus lines. Short reminder General properties of CAN bus o Up to 64 nodes on one bus o Different devices need different buses.
TDAQ Working group meeting Mainz – 8/9/2011 Where do we stand? Where do we go?
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
TDC/TEL62 update M. Sozzi NA62 TDAQ WG meeting Bruxelles – 9/9/2010.
10/09/10FV 1 News and observations from Brussels' meeting.
The NA62RunControl: Status update Nicolas Lurkin School of Physics and Astronomy, University of Birmingham NA62 TDAQ Meeting – CERN, 10/06/2015.
Status of LAV electronics commissioning Mauro Raggi, Francesco Gonnella Laboratori Nazionali di Frascati 1 Mauro Raggi - Laboratori Nazionali di Frascati4.
R. Fantechi 2/09/2014. Milestone table (7/2014) Week 23/6: L0TP/Torino test at least 2 primitive sources, writing to LTU, choke/error test Week.
1 DCS Meeting, CERN (vydio), Jun 25th 2013, A. Cotta Ramusino for INFN and Dip. Fisica FE Preliminary DCS technical specifications (v1.0) for the Gigatracker.
Software and TDAQ Peter Lichard, Vito Palladino NA62 Collaboration Meeting, Sept Ferrara.
LAV electronics status report Mauro Raggi and Francesco Gonnella TDAQ meeting NA62 Collboration Meeting 1-5 September 2014 Ferrara.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
“The Dry Run” Gianluca Lamanna (CERN) TDAQ - NA62 Siena Meeting
V.Duk, INFN Perugia1 CHOD/NHOD status Viacheslav Duk, INFN Perugia Ferrara,
“CHEF board” Gianluca Lamanna & Riccardo Fantechi (CERN) TDAQ meeting
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
“Technical run experience” Gianluca Lamanna (CERN) TDAQ meeting
RICH Readout Plans F. Bucci, M. Piccini on behalf of the RICH WG.
THIS MORNING (Start an) informal discussion to -Clearly identify all open issues, categorize them and build an action plan -Possibly identify (new) contributing.
01/09/ KTAG 5/8 sectors equipped DCS system in pogress DAQ commissioning in progress Test pressure scan this week (t.b.c) 01/09/20142.
Gu Minhao, DAQ group Experimental Center of IHEP February 2011
Status of NA62 straw electronics and services
Status of NA62 straw readout
LKr status R. Fantechi.
LAV front-end and readout status
Francois and Lau EATM 17 July 2012
Enrico Gamberini for the GTK WG TDAQ WG Meeting June 01, 2016
DCS WG report 9/09/11 FV.
ALICE Trigger Upgrade CTP and LTU PRR
M. Sozzi NA62 TDAQ WG meeting CERN – 20/10/2010
DCS WG report 9/09/11 FV.
Presentation transcript:

Installation status Control Room PC farm room DetectorsEB Infrastructure 918 ECN3

A lot of activity! It’s a fake!

PC farm room Jura Saleve Old System Router

PC farm room The first two PC (Mainz PC) are installed  problem for remote configuration in the old NA48 network The 4 additional PCs have been ordered three days ago, due to a burocratic problem Jonas will arrive the 2/7 Mainz PCs

PC farm room In the twiki you can find a proposal for IP numbering for each switch and sub-net The network is working! The configuration will be completed soon (before the end of the week)

PC Farm Room: Questions What is the status of the Merger PC HW? When it will be installed? What is the status of the CDR (HW and SW)? What about the “light version” of the Jonas program? It’s easy to do or it’s better to resume the old TELL1 DAQ software? …

Control Room

DCS User Interface PC ready 11 monitors ordered 3 PC for DAQ ordered (delivery foreseen next week) The furniture will be installed next week HVAC, power, etc. will be finish for the beginning of the Dry Run: no activity foreseen at the moment in the 918 during the dry run.

Control Room A CAD PC will be installed in the CR. Some doubt about the possibility to access to the licenses server Workaround: use the CAD software on centralized Virtual Machine Instructions on twiki

Control Room July 10 th we will do a first test for the run Control The run control will run on a PC in the CCR: some issue about the interaction of the TN with our config network will be fixed in the next days. Online Monitor: Antonio is working, but still we need the Merger PC to run the Online Monitor.

Control Room: Questions Proposal for ELOG? …

Infrastructure Optical splitters Choke/error panel Patch panels DSS Switch STRAW-02 CEDAR-01

Infrastructure LAV-03LAV-01

Infrastructure The path cords, patch cables and remaining parts will arrive this week (and will be installed next week) Small issue with the power in the racks RICH-01 IRC-01

Infrastructure Not all the optical splitters have been installed The switches have been installed and will be tested in the next days

Infrastructure EB36 StarPoint

Infrastructure L0TP primitive cables: almost done Choke/error cables: almost done TTC fibers: almost done Network fibers: almost done

Infrastructure: Questions What is the status of the CHEF board? Choke/error adaptor? When the Can Bus will be available?

Electronics Barrack

Marian already prepared a crate with all the LTU we need Next Friday Andrea will install the LKR/L0 TEL62 crate The TALK board will be installed in the week of July 9. We had a HW problem with the TIMING PC. We have a new PC ready to be tested (Riccardo)

Electronics Barrack: Questions When and where the CCPC server will be installed? Which kind of preliminary test are you planning before the dry run with the TALK board? Is the clock already installed? …

Detectors

Detectors TEL62 & TDCB documentation already available on twiki Information about the hardware status are available on twiki (for instance the cables)

Detectors The TEL62 cables support prototype will be build by Tonio in the next days

Detectors: Questions TEL62: – Which is the status of the TEL62 HW? – Which is the status of the TEL62 FW? TDCB: – Which is the status of the TDCB HW? – Which is the status of the TDCB FW?

Detectors: Questions CEDAR: – Which is the status of the test for the NINO boards? CHANTI: – Which is the status of the Chanti board? – When are you planning to install the detector? LAV: – Are you planning to help the other detectors for the board installation?

Detectors: Questions CHOD: – When are you planning to install the FE electronics? LKr: – Which is the status of the SLM readout? – Which is the status of the trigger distribution system? MUV2 & MUV3 – Which is the status of the TRAM board? – When the CFD will be installed? – How the cabling of the MUV2/3 will influence the dry run?

Detectors: Questions STRAW: – The VME readout will be installed during the dry run? – When? SAC – When the SAC cabling will be done? – Since the SAC electronics is in “common” with the MUV electronics, how the resources sharing will be “managed” during the dry run?

Next meetings 4 July: no meeting 11 July: Summary Useful numbers: Gianluca: Riccardo: