Endcap Module Status Agreed Responsibilities Overall Production UK Situation Global Schedule Issues General Production Issues.

Slides:



Advertisements
Similar presentations
18 Bit ADC Status Collaboration meeting May 18, 2007.
Advertisements

Endcap assembly update C Buttar UK-SCT-MB RAL 2 nd Sept 04.
23-Aug-2005 VELO Production UCD VELO Module Production at Liverpool T. Bowcock.
Status of Sensor and Hybrid Production LHCb Zurich Week T. Bowcock.
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Electrical and thermal testing at Glasgow and Liverpool.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Spine team meeting 23/01/2001H.-G. Moser MPI, Munich Agenda/Topics 1) IHEP pre-series 2) Bias Contact 3) Straight Split. 4) Design variations and improvements.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
Shulamit Moed Vertex 2004, Como, September 20041page EndCap Module Production of the ATLAS semiconductor tracker (SCT) ATLAS SCT layout and specifications.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
M. Gilchriese Status Report Sectors, Rings, Frame December 2002.
WP3 Meeting 21/05/ Liverpool Status: Thermo-Mechanical Hybrids Have now received a full complement of 240 Thermo-Mechanical Hybrids from Stevenage.
5 November 2001F Harris GridPP Edinburgh 1 WP8 status for validating Testbed1 and middleware F Harris(LHCb/Oxford)
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
CERN Rui de OliveiraTS-DEM TS-DEM Development of Electronic Modules Rui de Oliveira CERN CERN hybrid production experience (or how to stay out of trouble)
SCT Week -CERN- September 23, Defective ASIC’s A. Ciocio - LBNL.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
PMG, June 15, 2000 Slide 1 Schedule Started ! Done Late Done Done(today)
Abe Seiden December 2003 SCT Week S USA SCT Barrel Module Assembly SCT Week CERN December 2003 Presented by Abe Seiden U.C. Santa Cruz.
March OsC Report and Restructuring WP4. OsC Report 4.1 Tapes Bus tape designs have been completed for modules with 130nm ASICs which incorporate options.
ATLAS SCT End-Cap C Integration 1.Introduction: to the SCT within ATLAS 2.End-Cap C Reception at CERN 3.Final Assembly 4.Integration with the TRT 5.Combined.
SCT Week 2 Oct 2002N.P. Hessey NIKHEF1 Status ATLAS SCT 2002 NIKHEF Contributions to ATLAS: Magnets – discussed by Frank Trigger DCS Muon MDT and alignment.
Page 1 May 10, 2011 IT for the 12 GeV Era 2011 Review Review Closing Summary.
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
October 05, 2005D. Ferrère, RD05 Florence1 From the ATLAS SCT endcap module production to the commisionning D. Ferrère, University of Geneva in behalf.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Upgrade Project Wayne Salter HEPiX November.
Status of Glasgow module production Richard Bates The University of Glasgow K.Smith, R. Bates, A. Cheplakov, V. O’Shea W. Bell, J. Melone, F. Doherty,
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
Thermo-mechanical petal status Sergio Díez Cornell 23Jan 2015.
UK ATLAS SCT Module Quality Assurance Joe Foster, Manchester University 04 Jan 2005 All results compiled in time for Christmas…
Stave Hybrid/Module Status. Modules Stave Module Building 2 Mechanical Chip Gluings Mechanical Wirebonding Electrical Chip Gluings Electrical Wirebondings.
E.Guschin (INR,Moscow) 9 December 2008LED system meeting CERN Plans: PS/SPD LED monitoring system tuning Online histograms. Presenter for group of 16(64)
Neil Jackson University of Liverpool Hiroshima Symposium June THE ATLAS SEMICONDUCTOR TRACKER (SCT) A PRESENTATION ON BEHALF OF THE ATLAS.
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
EC Cu-LMTs -Status Report- Ulrich Parzefall Universität Freiburg.
15 January 2003N.P. Hessey, NIKHEF1 SCT Part Numbers and DB  Part numbers:  mnnnnnn  20: ATLAS  22: SCT  028: NIKHEF (033 for RAL)  m: =0:
ALICE SSD 20 May Yalta G-J Nooren ALICE SSD status.
M. TYNDEL 1 LHCC Interactions May 2003 ATLAS SCT SCT Production Status ‘Snap-shot’ of the status of the SCT production (May 2003) 1. Barrel Modules 2.
SCT week: 14th - 16th Dec 04 Spine progress R. Bates University of Glasgow.
Valencia Report 5 Pre-qualification (2 mechanical + 3 electrical) All inside mechanical specification in XY after assembled. However, Pre3-Pre5 bad planarity.
Status at Glasgow. Pre-qualification Last Thursday pre-qualified 2 modules M-O-040 and M-O-044 Time table to qualification –Visual Inspection and conformation.
Endcap assembly update C Buttar, R French UK-V Cluster RAL 8 th Sept 2004.
Module Assembly Jig Status Cambridge and DESY came to Liverpool Nov. 15 th -16 th for training on module assembly – A complete jig set was sent back with.
Assembly and Test of the Spectrometer (H.P. Apr. 16,1998) Status Module Assembly and Tests 1.) Status of completed hybrids and module 2.) Summary of the.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
MPI/ATLAS H.-G. Moser MPI, Munich Detector Status Delivered: 86% IV measured: 58% + Visual insp.: 39% fail : ~5%
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
Andy Blue WP3 - Glasgow Update Andy Blue. WP3 Meeting Update Module Building –2 nd Module (FZ1) wire bonded last week –Tested on Mon –Re-works yesterday/today.
Steinar Stapnes, LHCC June The ATLAS inner detector TRT endcap A+B TRT endcap C TRT barrel SCT barrel SCT endcap Pixels uWhole ID sits inside bore.
SVD QCG Report F.Forti. Outline Sep 09, 2015QCG Report, F.Forti2 view/Detector/SVD/SvdQCQAGrou p.
6 th Belle PAC, KEK, February 26 and PXD - EVO, 5/March/2012 Ladislav Andricek, MPI für Physik, HLL 1
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
Electrical Tests of Modules and Ladders Markus Friedl (HEPHY Vienna) 2 October 2014.
H.-G. Moser, 6 th PXD/SVD workshop, Pisa, Oct PXD Summary 1 DEPFET Sensors production yield inter-metal insulation EMCM electronic tests ASICs Schedule.
5 November 2002J.Pater - Systemtest Report1 Endcap Systemtest Current Grounding/Shielding status Recent Upgrades to sector Measurements with 6 Modules.
CMS Phase 2 Tracker R&D R. Lipton 2/27/2014
Update on the SVD construction
7th Belle II VXD Workshop, Prague
MODULE QUALIFICATION STATUS AT LIVERPOOL
R. Bates UK-V meeting Liverpool, 21/04/2004
PXD Summary Tests PXD9 Pilot Production ASICs Components Plans:
From the ATLAS SCT endcap module production to the commisionning
Quality Control – Assurance
Sensor probing (Summary)
US Module Testing Progress Report
Natura 2000 dataflow (1) QA/QCs for Natura 2000 dataflow is now up and running (completeness & consistency of the tabular data) Individual QA/QCs now uploaded.
US Module Testing Progress Report
Presentation transcript:

Endcap Module Status Agreed Responsibilities Overall Production UK Situation Global Schedule Issues General Production Issues

Agreed Module Distribution InnerMiddle Outer TotalInnerMiddleOuterTotal UK UK VLC VLC GVA520 GVA624 Melb104 ContingencyMelb125 MPI400 × 1.2MPI480 NIKHEF80 NIKHEF96 Freib.160 Freib.192 Total Total

Overall Production Proceeds smoothly –~816 module starts (35% of total) 70% tested of which –Yield: 88% (good), 92%(good+pass) Still OK but seems to be dropping slightly Components: –No stocks building up for spines or hybrids Very vulnerable to component delays

SummaryBuiltGoodPassHoldFailedNot testedYield (G)Yield (G+P) All %92.0% ClustersBuiltGoodPassHoldFailedNot testedYield (G)Yield (G+P) UK-V %88.8% CS %99.3% CE %82.4% TypesBuiltGoodPassHoldFailedNot testedYield (G)Yield (G+P) Outer %93.3% Inner % MidL %90.3% MidS %87.5% SitesBuiltGoodPassHoldFailedNot testedYield (G)Yield (G+P) Freiburg NaN Geneva %99.3% Manchester %88.3% Manchester-Inn000000NaN Manchester-Mid %93.1% Manchester-Out %87.3% Melbourne100001NaN MPI %87.5% Nikhef % Valencia %89.5% Valencia-Mid %89.5% Valencia-Out800008NaN

Glasgow % Liverpool % Manchester In Transit Other Totals % Site Starts Bonded Unbonded Good Tested Total Incomplete Failing Tested OK Fail Total Glasgow Liverpool % Manchester In Transit Other Totals % UK Outers in Database as of 31/8/04 UK Middles in Database as of 31/8/04 Thanks to Joe Foster for summary

Overall Schedule Still some delay –Foreseen to finish last module by end June 2005 –GVA and MPI have increased their production rates –Could be earlier (during May) if sites soon approaching their agreed number of modules, keep their production lines running. VLC helps MPI with middles NIKHEF helps Freiburg with Inners –Melbourne has to start very soon. Already pre-qualified. UK Modules

Production Issues Disk measurements showed redundancy link operation increases noise: –Trials have led to new (screened) links and requirement to change module 5.1kΩ resistor on redundancy line –All UK modules at Liverpool now have shorted out resistor with 0Ω resistor following procedure proposed by Freiburg 20% sample test show identical normal electrical performance after change –All new hybrids have 0Ω resistor –Disk results with these changes greatly improved, disc9C mounting to begin Repeat of contamination/erosion of tracks on fan-in after thermal cycling. Seen in one early Liverpool Module Now seen on two MPI modules in the same place as at Liverpool Chemical analysis soon at CERN Spine QA and delivery still critical Prague CTU and Melbourne still to qualify Most other sites producing at or above original envisaged rates and UK is nearing half-way