NSQP X-1 ASSEMBLY Lessons learned Sébastien MICHAL January 30 rd 2012.

Slides:



Advertisements
Similar presentations
Build Your Own Future RC2 Serviceability. Build Your Own Future Safety and Ground Rules Before servicing, always remove A/C power from the unit and disconnect.
Advertisements

ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
Jump to first page Armada Rubber Mfg. Co. Expert System.
M. Gilchriese SQP Clearance June 8, M. Gilchriese 2 Overview A1-2 inners have been mounted on backbone An A1-2 outer has been mounted on the backbone.
Observations and next works from the recent tests of the insertion tools of Mini-Drawers at CERN Roméo Bonnefoy and François Vazeille Tilecal Operation.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Stave core assembly Stephanie Yang WP4 face to face meeting, Lancaster University 20 Feb 2014.
EA meeting, Wednesday 6 Dec 2006 TT installation, Jeroen van Tilburg 1 TT installation Installation of the TT station.
DESIGN AND FABRICATION OF TURNING FIXTURE FOR ELBOW
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
MECHANICAL DESIGN OF TCSP COLLIMATORS Secondary Collimators Embedding BPMs L. GENTINI, A. Dallocchio, A. Bertarelli, F. Carra, M. Garlasche.
NSQP MEETING Valery AKHNAZAROV January 20th 2011 ISP PP0 Board Bonding Procedure Type 1 Type 3 Type 4peek Type 4 Assembly Name: ISP ASM Parts.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
RICH WG M.Lenti. Outlook Mirror Support Vidyo meeting on June 12, 20, 27 and on July 4 and 11 RICH WG meeting on august 27  Vessel status (see Ferdi’s.
ATLAS Pixel Detector March 2004 Video Conference E. Anderssen LBNL PP1 Opto Connector and Fiber Routing Updated with notes from 23-March Meeting E. Anderssen,
Activities Status and Plan for the week D. Giugni / INFN Milano D. Giugni Monday Meeting
ILC / ILD TPC Requirements of the support mechanics Volker Prahl ILD Workshop 2013 Cracow
M.Oriunno, SLAC Stave cable and module options. M.Oriunno, SLAC Background - module The IBL electrical unit for data output is a single chip The use of.
Product features. Obsolescence What does quality mean?
Partial Disassembly of the alignment devices on each ME11transfer plate, ME1/1 chamber and ME1/2 chamber. (6 on +Z and 6 on –Z side of the CMS)
994 2½ ”- 10”. Modification Overview  Production for the 994 began in 1999 and is current.
Shown is the current construction Play between pin and holes in tube is causing the tictac sound. Current Part TicTac Noise (CF#64)
PS500B/800B Battery Replacement Procedure. 1.Remove the two screws at the bottom of the front panel. 2.Push down then remove the front panel.
Physics requirement Radial envelope: 1265 mm to 1473 mm 12 wedges over 2  20 tungsten layers of 2.5 mm 10 tungsten layers of 5 mm Instrumented gap 1.25.
PREPARATIONS TOOLS : 1 、 wire stripper 2 、 coating stripper 3 、 fiber length measurement 4 、 cutter QUICK ASSEMBLY CONNECTOR 1.
SVD Mechanics Markus Friedl (HEPHY Vienna) BPAC, 26 October 2015.
SCT Barrel 6 Support Bearing A full-scale model of the barrel 6 support bearing has been machined at UCL (drawing G.Barbier ) It was tried out on both.
1 Manufacturing Projects Flexible Manufacturing Copyright © Texas Education Agency, All rights reserved.
ATLAS 1 Beam Pipe Support Structure (BPSS) Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman LBNL.
The HCAL barrel absorber structure
ATLAS 1 Beam Pipe Support Structure (BPSS) Services Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman, A Smith, LBNL S. Coelli,
SLHC Engineering Upgrade FCAL Remove-Install step by step procedure. Mircea Cadabeschi-University of Toronto March 01,
Cold Magnetic Shield Assembly Nik Templeton 25/08/2015.
Coordinate Detector: prototype design General idea about the Coordinate Detector (CDET) so far: Three independent vertical planes with 15 cm plastic shield.
Dan Cheng, Helene Felice 4/8/2015 MQXFS-D Build-up LBNL “Lessons Learned”
Roy Hannaford October 23-24, 2002 RFP Review DFBX Feedbox LEAD SPLICE SPECIFICATION  BY: ROY HANNAFORD.
1. Take HV harnesses with label (IHV2) and transfer on the Stacking table. 1.1 Inspect HV harnesses visually. 2.1 Insulate HV Flex with 3M™ VHB™ Tape.
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
PROTOTYPE January, 27 th 2016 Valery AKHNAZAROV Diego ALVAREZ Christophe BAULT Andrea CATINACCIO Daniel DOBOS Heinz PERNEGGER Danilo GIUGNI Eric VIGEOLAS.
NSQP MEETING Valery AKHNAZAROV January 20th 2011 Corrugated Panel Bonding Procedure Assembly Name: ISP Corrugated Panel ASM Parts.
Meeting at Chooz PMTs Mechanical support on the Buffer. Updates. Enrique Calvo Alamillo
1 David Santoyo sLHC OXFORD 17/06/2010 EC Structure Review ? ? ? ? ? ? IFIC-Valencia.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
Dan Cheng 8/27/2015 MQXFS1 Observations and Feedback from the Assembly Processes, Part II.
K.Gadow - DESY 1 The HCAL barrel absorber structure Design Status
Completed Front and Rear Standard 10 ½” 1 ½” 3 ¼” 4 ½” 1” ¾” 1 ½” 6” ¾” Channel Length: 5 ¼”, ¾” from end.
EC: 7 DISK concept Preliminary considerations
Florian Buchsteiner (HEPHY Vienna)
Installation Walkthrough Image Guide
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
Service channels between Tracker and PP1
Easy-Cliner Manual Cable Version Assembly Instruction
New field cage LP2 Ole Bach, Bernd Beyer, Volker Prahl
Endcap shielding senarios:
Activities Status and Plan for the week
Activities Status and Plan for the week
HB RM prototypes Ianos Schmidt Aug 17, 2017.
Integration issues at IHEP
HB RM prototype component status
Flexible lines assembly
Requirements of the support mechanics
The 11T cryo-assembly: summary of design and integration aspects
EC Assembling with Assembly Stand of THU
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
Assembly instructions for M-K all bolt together hoppercone kit.
Horizontal Installation Overview
CL4NX +Cutter (KITTING MANUAL)
Cryomodule Assembly Plan
Inner DET. Integration Inner detector envelope Radial clearances.
Presentation transcript:

nSQP X-1 ASSEMBLY Lessons learned Sébastien MICHAL January 30 rd 2012

Sébastien MICHAL January 30rd 2012Slide 2 of 6 nSQP X-1 Backbone assembly on support tool Load cooling pipes at specific locations Prepare OSP assembly Load and route ER bundles on OSP bottom panel Load E-boards on OSP bottom panel Diameter of the fixation holes of the E-boards not compliant with specification (Ø2 mm)

Sébastien MICHAL January 30rd 2012Slide 3 of 6 nSQP X-1 Put OSP assembly on the side tool Route bottom ER bundles trough the cooling pipes with remaining cooling pipes Load OSP assembly on backbone Fix PP1 end flange on end plate: pocket dimensions too small, should increase gap between flange and end plate Load and route ER bundles on OSP top panel Load E-boards on OSP top panel Prepare ER bundle rolls for the flipping step

Sébastien MICHAL January 30rd 2012Slide 4 of 6 Flip the nSQP assembly Fliping tool too short, should increase the lenght and the number of clips Put nSQP assembly on reverse support tool Install the front and back sealing plate on PP1 end plate

Sébastien MICHAL January 30rd 2012Slide 5 of 6 nSQP X-1 Route the OSP ER bundles on PP1 cable organizer and stack the inserts on PP1 end plate Prepare ISP assembly Load and route ER bundles on ISP top panel Load E-boards on ISP top panel Bond ISP card stabilizer before loading Load ISP assembly on nSQP Fix ISP assembly on nSQP: some of the CF bridgeplates are to short and deformed the SLA end piece when screwing → long flavour Route and stack ISP inserts on PP1 end plate Fixation of ER bundles lugs for shielding difficult at PP1

Sébastien MICHAL January 30rd 2012Slide 6 of 6 nSQP X-1 CONCLUSION C4 side of nSQP X-1 completed Need to load OSP and ISP C3 Support for ER bundles rolls need to be designed Should test the complete nSQP assembly (damaged during loading operation, bending radius of PP1 CO) Minimum bending radius = 6 mm