Notes After TIG 17/7/08 HF+ Move out of garage: Aug 15* Platform+table+collars+racks+BP support (jack up for platform) = 3 days Controls for motors = 1.

Slides:



Advertisements
Similar presentations
T1 status and plans INFN Genova November 2014 Collaboration Meeting.
Advertisements

M.Oriunno/ D.Druzhkin Situation du projet collier pour préparation du 'Work Package' en Iran prepared by : M. Oriunno &
Far side Near side -Z End +Z End 5m Wed Dec 7 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability.
Atlas standard opening ATLAS Project Document N°: ATL-HT-OP-0014 EDMS id Created : January 13 th, 2009 Modified : Main document Overall view of.
Assembly Hall in Hybrid-A’ and ILD 2014/9/6 Yasuhiro Sugimoto 1.
MICE Hall – South Mezzanine Jason Tarrant - STFC l Contents »Device checks with current South Mezzanine »South Mezzanine change summary »Conclusion.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
1 Installation of Delphi Frame  ITS Installation.
EA meeting, Wednesday 6 Dec 2006 TT installation, Jeroen van Tilburg 1 TT installation Installation of the TT station.
Saverio MINUTOLITIG meeting, 10 February Report on T1 installation activities and achievements made during this shutdown.
08/24/07Shutdown’07 Week 3 F.G. Garcia1 MTA beam line installation Weekly Report August 24, 2007 Period covered: August 17 th to August 24 th (Week 3)
Warm magnets and the remote handling system in the J-PARCν beam line E. Hirose, K. H. Tanaka, Beam Channel Group.
Appendices Subpart R Steel Erection
DH in Hybrid-A and ILD 2014/9/5 Yasuhiro Sugimoto 1.
EATM12-08 Contribution NA62 Francois Butin, Lau Gatignon / EN-MEF 4 September 2012.
Construction and Installation of the CLIC Experimental Area
ZDC Crane Status 9 Feb 2012, Michael Murray. Test at SX5 Last week the ZDC was taken out via a forklift. Tunnel access closes at 5pm on the 21 st Before.
TGC Big wheel Sector assembly plan Tatsuo Kawamoto ATLAS workshop 2005.
Experimental hall in Japanese mountain site Y. Sugimoto 1.
EBD existing crane details and future bridge crane upgrade Alev Ibrahimov June
Undulator Orientation & Electron Beam Spacing Should the undulator frames be toward the central aisle or the tunnel walls? What is the optimum spacing.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
ALICE 5 o’clock meeting Wk 50. INDICO You’ll find this meeting here: – The full shutdown planning.
LS2 Other LHC Experiments Mike Lamont Thanks to: Michael Rijssenbeek (AFP) Joachim Baechler (TOTEM) Karl-Heinz Hiller (ALFA)
UPDATE at SBU (Feb 24, 2009) 1 st Water Target SuperP0Dule (DaveF, Kevin, Scott) last week spent setting up hoses, pipes, water tank. Problem with unfiltered.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
LHCb Experimental Area Meeting V. Bobillier1 Earth network in UX85 experimental cavern.
Transport of the CLIC Modules and Elements CLIC Workshop October 2007 Two Beam Hardware and Integration Working Group Keith Kershaw (CERN)
19 January 2006VELO installationEddy Jans 0 VELO-installation meeting CERN, January 17, 2006 preparation IP8-area SX8 moving SX8 -> IP8.
TAS at IP5 Present situation and plans François BUTIN TS/LEA.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
LS1 planning meeting /4/13 ALICE TBStatus of LS1 activities - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
PHENIX WEEKLY PLANNING 9/14/06 Don Lynch. 9/14/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown '065/1/200612/8/2006.
18 June 20031Integration Review B. Schmidt Outline: Overview of the support structures Requirements –Some details on electronics, cabling and piping Constraints.
TC meeting LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS extraction, remove RB24 beampipe and PMD10 Remove.
Michel RAYMOND – July 1 st, 2013 Technical Support Activities in PH-ADO-PO Summary of 2013 activities.
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
LS1 planning meeting /7/13LS1 planning meeting - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
Mike Andrews May 10, Week 54 NuMI Activities Initial test controls on the MI65 RAW exchange skid Complete hydrostatic test of the MI65 exchange.
(1/17) 14/11/13 – RadWG meeting PS East Area Update Outline Layout updates of the facility Conveyer Rail system Mock-up Other news.
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
/ 11 Updates of PANDA 3D Model CM June 2016 at GSI, MEC Session J. Lühning, GSI Updates for: Panda Hall Target Spectrometer Latest version.
01 June 2011F. Raffaelli1 Super B Mechanical integration. List of reference persons and institutions for the mechanic of the sub detectors. Review of the.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
Kitakami Side AHCAL Assembly or anywhere in any detector.
22/09/2011 ADO-PO section meeting ADO : Atlas Detector Operation PO : Project Office R. Vuillermet.
Neutrino Platform Proximity Cryogenics 72th EHN1 Cryogenics Integration TE-CRG
Miscellaneous Topics MEC Session, CM March 2017 at GSI J. Lühning, GSI
Technical Coordination Parallel Session November 2011, FNAL
EHN1 Extension planning
LS1 planning meeting
Plan for the installation of the TAMU screen
VELO-installation meeting CERN, January 17, 2006
BA6 – crab cavity activities in EYETS
Introduction Status before the 2009 run Results from the 2009 run
CMS Area Working Group Meeting
Helium spill in LHC tunnel
Update of experimental hall in Japanese mountain site
Design Concept Update – Platform Moved on Hillman Rollers
Installation plans from mid 2005
Question & Suggestions March 17th
OT Survey & Adjustment Outline: Survey technique at present
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 20/02/2019.
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

Notes After TIG 17/7/08 HF+ Move out of garage: Aug 15* Platform+table+collars+racks+BP support (jack up for platform) = 3 days Controls for motors = 1 day (overlap with above) Test closing while on the floor = 1 day Paint exposed surfaces of HF absorber = 1 day Install BCM2 = 1 day Remove HF lead doors = same day as BCM2 Move HF onto 2 raisers: *+6days HF- Move out of garage on ~Aug 25** (could be sooner) Install CASTOR < 1 day (dedicated crane), connect+test < 1 day (T2 will be installed in garage) Controls for motors (in the garage) Test closing while on the floor = 1 day Remove HF lead doors = 1 day Put HF onto 2 raisers AS SOON AS POSSIBLE: **+2days Magnet tests at night Low current > Aug 15 1T Aug 26  3.8T Aug 29 1

17/7/2008W. Klempt2 Work on HF platform –z end Installation work ongoing in garage position We need some 3-4 days of notice to stop and prepare to move out of garage Foreseen date of move out of garage: –either 1/8 if no end cap e-cal installation on –z end –or 18/8 with cap e-cal installation on –z end Work in “floor position” Work in height of 2 risers Work in beam height

17/7/2008W. Klempt3 Garage position

17/7/2008W. Klempt4 Garage position We will continue to work up to HF is moved out of the garage Castor: –1. test of installation tools on 15/7. Some (small) mods on feet's needed. Next test on Monday 28/7 –Cabling will finish by 25/7 –Installation of cable chain to be finished by 25/7/2008 –1 Marathon crate to be installed BCM –T2 rails need shimming (geometry of table pretty bad) by 21/7 –Cabling finished by 25/7

17/7/2008W. Klempt5 Garage position (cont’d) TOTEM T1 –Install rack’s (if possible in garage) –Equip rack’s with marathons Totem T2 –Install marathon 17/7 –Cabling and piping by 25/7 –Modify 5 vertical pipes (collision with rotative shielding) 25/7 –Install detector (if possible) 2 days Services –Connect cooling to racks (latest in week 28/7) –Install Lauda on HF and connect to Castor, T1 and T2 cooling (31/7) –Equip all detectors with position detectors

17/7/2008W. Klempt6 HF close to End cap on the Floor

17/7/2008W. Klempt7 HF close to End cap on the Floor We need HF open for the ease of access. Day 1 : Install T2 (if not yet done) mechanics Day 2 : Install Castor mechanics (crane close to beam pipe ) Day 3 : Cabling of Castor and T2 (in parallel) BCM needs > 1 day of access (in parallel) Test of closure procedure?? Install cables and pipes on YE4 for T1 (5 days)

HF lifted up 2 risers 17/7/2008W. Klempt8

17/7/2008W. Klempt9 HF lifted up 2 risers Table in maintenance position Collar open Access to both sides (difficult to cross from near to far side) Install PT100 temp probes on beam pipe T1 installation –Close HF –Finalize cable and piping on YE4 (if needed) –Install truss (1 day) –Install detector (1 day) –Connect, test and de-connect(1day) –Open HF BCM, Castor and T2 need access

HF in Beam Height 17/7/2008W. Klempt10

17/7/2008W. Klempt11 HF in Beam Height Final connection of T1 (1/2 day) All detectors will need access (install bridge?) Closing of detector and shielding…3 days??