Presentation is loading. Please wait.

Presentation is loading. Please wait.

Far side Near side -Z End +Z End 5m Wed Dec 7 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability.

Similar presentations


Presentation on theme: "Far side Near side -Z End +Z End 5m Wed Dec 7 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability."— Presentation transcript:

1 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch1 Wed Dec 7 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept Beam Stopped at 18:00

2 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch2 Thu Dec 8 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept Magnet ramp down initiated at 06:00 2. Open VAC shielding 8:00 Maf + 3 FSU 1h WP: 5. Prepare GIS 14:00Gerhard 8h WP: 4. EN-HE: Restart Crane Eric + 2Altead 1h WP: 0. Full RP sweep Heinz + 3RPEs 10:30am 2h WP: 3. Open PX56 Plug JP 20’ WP: 6. CV Switch ventilation to shutdown mode G Ducret WP: 8. Check HF jacks Hubert /Silverio2h WP: 7. Install collar switchboards Silverio 20’ WP: 7’. Lower 2 CPs + 1SL E Dugue 3h WP: 1. Take RP water/C6F14 samples Heinz + CV/DC 2h WP: Request to take data at 0B EE 1h Install SU brackets Antje 5h WP:

3 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch3 Fri Dec 9 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept 1. Inject Ne 8:00 Gerhard 8h WP: 2. Remove shims between collar and RS+Z Dmitry + 2 Russian Tecs 1h WP: 3. Open RS+Z Pascal /Sandro 30’ WP: 5. Remove 4 X-Stops and Open +Z Collar Dmitry/Alex/Maf 2h WP: 3’. RP sweep inside RS+Z Area Angelito 1h WP: 4. Remove CCTRXP & CCHFPP position sensors Joao + Alex 15’ WP: 6. Remove HF+Z X stop (with CP) Maf + 2 Russian tecs 1.5h WP: Disconnect –Z fibre optical sensors Salvatore 1h WP: Start of Water cooling maintenance: 08:00 Survey Cavern floor Antje 3h WP: A. Remove shims between collar and RS-Z Dmitry + 2 Russian Tecs 1h WP: B. Open RS-Z Pascal /Sandro 30’ WP: 014 C. Remove 4 X-Stops and Open Collar-Z Dmitry/Alex 2h WP: C’. RP sweep inside RS-Z Wolfram1h WP: D. Remove HF X stop (with CP) Maf + 2 Russian tecs 1.5h WP: 017

4 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch4 Mon Dec 12 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept AUG tests – CMS underground Facility OFF LIMITS

5 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch5 Tue Dec 13 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept Diesel Test 3. Open HF + flooring Maf/Sandro/Alex + 1VSC 1h WP: 5. Open T2 & BSC Dmitry /Alex 30’ WP: 6. Survey BP @ 15m Antje + 1VSC 3h WP: H. Remove HF X stop (with CP) Maf + 2 Russian tecs 1.5h WP: 4. RP sweep inside HF+ 2 RPE 20’ WP: 6’. Remove CTZPproximity sensors Joao 10’ WP: C. Open HF- + flooring Maf/Sandro/Alex + 1VSC1h WP: A. Move HF-Z away from IP Maf/Sandro + 1 VSC + 2 Rtecs 10’ WP: D. Release CASTOR services Dmitry 1h WP: 020 F. Open CASTOR Dmitry /Alx 30’ WP: 021 E. Remove CRP proximity sensors Joao 10’ WP: A5 G. Open T2 & BSC Nicola /Alex 30’ WP: 025 D’. RP sweep inside HF- 2 RPE 20’ WP: 001 1. Move HF+Z away from IP Maf/Sandro + 1 VSC + 2 Rtecs 10’ WP: 2. Disconnect T1 services Nicola 2h WP: B. Disconnect T1 services Nicola 2h WP:

6 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch6 Wed Dec 14 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept 4. Remove access gangway to HF+Z Eric + 2Altead 1h WP: 026 5. EN-HE – Remove HF+ I beams Eric + 3 Altead 2h WP:027 3. Remove proximity sensors 30’ WP: # 7. Lower HF on 3 risers Marc/Herve + 2 Rtecs 4h WP: 029 6. Remove HF+Z towers reinforcement Marc /Herve + 2RTecs 3h WP: 028 A. Survey BP @ 15m Antje + 1VSC 3h WP:022 A’. Remove CTZPproximity sensors Joao 10’ WP: # 1. Release BP support @ 13.5m 2VSC + Sandro 2h WP: 2. Block BP support @ 13.5m in parking position 2VSC + Sandro 30’ WP: 8. EN-HE – lift up 1 riser Eric + 2Altead 2h WP:030 B. Perform CASTOR removal Dmitry 7h WP: C. Perform ½ CASTOR Installation-removal Exercise at BP level Dmitry 1h WP:

7 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch7 Thu Dec 15 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept G. Lower HF on 2 risers Marc/Herve + 2 Rtecs 4h WP: 029 F. Remove HF- towers reinforcement Marc /Herve + 2RTecs 3h WP: 028 1. EN-HE – lift up 1 riser Eric + 2Altead 2h WP:030 2. Install tooling for extension beam Sandro + 2Vac 5h WP: 031 3. Install extension beam on FIN 3VSC + Sandro + 2 Altead 3h WP:032 D. Remove access gangway to HF-Z Eric + 2Altead 1h WP: 026 E. EN-HE – Remove HF- I beams Eric + 3 Altead 2h WP:027 C. Remove proximity sensors 30’ WP: # A. Release BP support @ 13.5m 2VSC + Sandro 2h WP: B. Block BP support @ 13.5m in parking position 2VSC + Sandro 30’ WP: 0. Lower HF on 2 risers Marc/Herve + 2 Rtecs 4h WP: 029 H. EN-HE – lift up risers Eric + 2Altead 2h WP:030 Survey link Cavern-Su galleries Antje Andreas 8h WP:

8 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch8 Fri Dec 16 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept 1.Perform load transfer on Ext beam 3VSC + Sandro + 1Altead 5h WP: 1’. Survey BP Andre + 1VSC 5h WP: 2. Remove HF handrail on IP side Maf + 2FSU 1h WP: Remove green support beams C. Install tooling for extension beam Sandro + 2Vac 5h WP: 031 D. Install extension beam on FIN 3VSC + Sandro + 2 Altead 3h WP:032 B. Move collar table out by 60cm Dmitry+ 2FSU 2h WP: A. Install supports for COLLAR table Maf : 30’ WP: 0. Survey TAS + Fwd BP 4h

9 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch9 Mon Dec 19 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept b. Perform load transfer on Ext beam 3VSC + Sandro + 1Altead 5h WP:034 b’. Survey BP Andre + 1VSC 5h WP:035 c. Remove HF handrail on IP side Maf + 2FSU 1h WP: 216 d. Move collar table in by 60cm + remove supports Maf + 2FSU 2h WP: 216 Start of crane installation in CV room a Survey TAS + Fwd BP 4h 1. Lower HF+Z on floor Marc/Herve + 2 Rtecs 4h WP: 2. EN-HE – lift up risers Eric + 2Altead 2h WP: 3. Move HF+Z in garage Pascal + 2 Rtecs 4h WP:

10 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch10 Tue Dec 20 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept 1. Lower HF-Z on floor Marc/Herve + 2 Rtecs 4h WP: 2. EN-HE – lift up risers Eric + 2Altead 2h WP: 3. Move HF-Z in garage Pascal + 2 Rtecs 4h WP: Remove 1/2 BSC A Bell 4h WP:

11 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch11 Wed Dec 21 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept Remove 1/2 BSC + install new one A Bell 4h WP: Erect scaffolding for BP bake-out

12 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch12 Thu Dec 22 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept CERN Closed Erect scaffolding for BP bakeout

13 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch13 Fri Dec 23 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept CERN Closed

14 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch14 Mon Dec 26 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept CERN Closed

15 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch15 Tue Dec 27 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept CERN Closed

16 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch16 Wed Dec 28 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept CERN Closed

17 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch17 Thu Dec 29 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept CERN Closed

18 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch18 Fri Dec 30 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept CERN Closed

19 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch19 Mon Jan 2 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept CERN Closed

20 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch20 Tue Jan 3 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept CERN Closed

21 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch21 Wed Jan 4 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept CERN Closed

22 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch22 Thu Jan 5 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept Install PLT Martin d1/4 WP: CSC Posts Remove 1/2 BSC A Bell 4h WP: 1. Open FIN Doors 1h 2. Remove FIN plug 1h b. Remove FIN plug 1h 3. Prepare for radioscopy 6h c. Prepare for radioscopy 6h a. Open FIN Doors 1h

23 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch23 Fri Jan 6 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept Install PLT Martin d2/4 WP: CSC Posts Install BLM Dmitry 1d WP: Carry out radioscopy 8h Carry out radioscopy 8h

24 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch24 Mon Jan 9 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept 1.Install PLT Martin d3/4 WP: CSC Posts Prepare for bake-out 8h Prepare for bake-out 8h CSC Posts

25 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch25 Tue Jan 10 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept 1.Install PLT Martin d4/4 WP: CSC Posts Prepare for bake-out 8h Prepare for bake-out 8h CSC Posts

26 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch26 Wed Jan 11 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept Prepare for bake-out 8h Prepare for bake-out 8h CSC Posts

27 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch27 Thu Jan 12 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept Bake-out -Z 8h

28 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch28 Fri Jan 13 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept Bake-out -Z 8h

29 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch29 Mon Jan 16 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept Bake-out -Z 8h

30 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch30 Tue Jan 17 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept Bake-out +Z 8h

31 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch31 Wed Jan 18 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept f Close Collar 1h WP: Bake-out +Z 8h

32 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch32 Thu Jan 19 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept Bake-out +Z 8h Prepare GIS 8h

33 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch33 Fri Jan 20 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept Inject Ne in BP 8h

34 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch34 Mon Jan 23 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept 2. Install FIN plug + close FIN doors Patrick + HE 2h WP: 3. Remove scaffolding 1. Install FIN plug + close FIN doors Patrick + HE 2h WP:

35 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch35 Tue Jan 24 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept Restart Cryo Remove scaffolding

36 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch36 Wed Jan 25 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept C. Move HF-Z on 2 risers Marc/Herve + 2 Rtecs 4h WP: B. Move HF-Z out of garage Maf + 2 Rtecs 4h WP: A. EN-HE – bring down risers Eric + 2Altead 2h WP: D’. Move HF+Z out of garage Maf + 2 Rtecs 4h WP: C’. EN-HE – bring down risers Eric + 2Altead 2h WP:

37 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch37 Thu Jan 26 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept a. Install torsion prevention support 3VSC + Sandro + 1Altead 2h WP:034 a’. Survey BP Andre + 1VSC 5h WP:035 b. Remove HF handrail on IP side Maf + 2FSU 1h WP: 216 c. Move collar table in by 60cm + remove supports Maf + 2FSU 2h WP: 216 1. Move HF+Z on 2 risers Marc/Herve + 2 Rtecs 4h WP:

38 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch38 Fri Jan 27 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept a. Install torsion prevention support 3VSC + Sandro + 1Altead 2h WP:034 a’. Survey BP Andre + 1VSC 5h WP:035 b. Remove HF handrail on IP side Maf + 2FSU 1h WP: 216 c. Move collar table in by 60cm + remove supports Maf + 2FSU 2h WP: 216 A. Survey and align BP Patrick + SU2h WP: B. Install tooling for removal of ext beam 2h WP: C. Perform load transfer 4h WP: C’. Support for load transfer 4h WP: D. Survey TAS and Fwd pipe Antje 4h WP:

39 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch39 Mon Jan 30 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept 2. Open HF & T2 30’ WP: Check position of 13.7 BP support: P Lepeule 0. EN-HE – lower 2 risers through PX56 2h WP: 3. Move HF-Z on 4 risers 4h WP: 1. Remove extension beam 2h WP: A. Survey and align BP Patrick + SU2h WP: B. Install tooling for removal of ext beam 2h WP: C. Perform load transfer 4h WP: C’. Support for load transfer 4h WP: D. Survey TAS and Fwd pipe Antje 4h WP:

40 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch40 Tue Jan 31 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept 1. Install HF- access gangway 2h WP: 1’. Install HF- tower reinforcement 3h WP: 3. Engage and survey 13.7m support 2h WP: 2. Move HF- towards IP Pascal 15’ WP: 2. Open HF & T2 30’ WP: Check position of 13.7 BP support: P Lepeule 0. EN-HE – lower 2 risers through PX56 2h WP: 3. Move HF on 4 risers 4h WP: 1. Remove extension beam 2h WP:

41 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch41 Wed Feb 1 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept b. Close T2, BSC, HF- & check VSC cables at 13.7 meter 1h WP: d. Engage HF X stops 1h WP: e. shim Collar 1h WP: c. Install brackets between CASTOR table and Plug 1h WP: a. Check position sensors 2h WP: a’. Survey BP 13.7m 3h WP: 1. Install HF+ access gangway 2h WP: 1’. Install HF+ tower reinforcement 3h WP: 3. Engage and survey 13.7m support 2h WP: 2. Move HF+ towards IP Pascal 15’ WP: c’. Survey HF- 2h WP:

42 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch42 Thu Feb 2 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept a. Close RS+Z (cheese wedges) Pascal 3h WP: b. Install wooden shims Dmitry 1h WP: a. Check position sensors 2h WP: a’. Survey BP 13.7m 3h WP: 052

43 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch43 Fri Feb 3 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept Install PLT temporary cables Martin d1/2 WP:

44 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch44 Mon Feb 6 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept Install PLT temporary cables Martin d2/2 WP:

45 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch45 Tue Feb 7 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept Commission PLT at beam level 8h WP: Survey and Align PLT 4h WP:

46 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch46 Wed Feb 8 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept Commission PLT at beam level 8h WP:

47 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch47 Thu Feb 9 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept Commission PLT at beam level 8h WP:

48 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch48 Fri Feb 10 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept a. Close T2, BSC, HF+ & check VSC cables at 13.7 meter 1h WP: c. Engage HF X stops 1h WP: d. shim Collar 1h WP: b. Install brackets between CASTOR table and Plug 1h WP: e Close Collar 1h WP: b’. Survey HF- 2h WP:

49 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch49 Mon Feb 13 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept c. Start Pump down BP: Gerhard 1d WP: a. Close RS+Z (cheese wedges) Pascal 3h WP: b. Install wooden shims Dmitry 1h WP:

50 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch50 Tue Feb 14 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept Pump down BP: Gerhard 1d WP:

51 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch51 Wed Feb 15 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept Pump down BP: Gerhard 1d WP:

52 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch52 Thu Feb 16 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept Pump down BP: Gerhard 1d WP:

53 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch53 Fri Feb 17 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept Pump down BP: Gerhard 1d WP:

54 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch54 Mon Feb 20 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept Pump down BP: Gerhard 1d WP:

55 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch55 Tue Feb 21 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept Pump down BP: Gerhard 1d WP:

56 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch56 Wed Feb 22 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept Pump down BP: Gerhard 1d WP: Remove SU brackets Antje 5h WP:

57 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch57 Thu Feb 23 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept Magnet ON Pump down BP: Gerhard 1d WP:

58 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch58 Fri Feb 24 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept Complete Pump down BP: Gerhard 1d WP: Contingency for magnet restart

59 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch59 Mon Feb 27 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept Contingency for magnet restart

60 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch60 Tue Feb 28 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept Contingency for magnet restart

61 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch61 Wed Feb 29 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept Contingency for magnet restart

62 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch62 Thu Mar 1 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept Contingency for magnet restart

63 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch63 Fri Mar 2 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept Contingency for magnet restart

64 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch64 Mon Mar 5 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept Contingency for magnet restart

65 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch65 Tue Mar 6 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept Contingency for magnet restart

66 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch66 Wed Mar 7 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept Ready For Beam

67 Far side Near side -Z End +Z End 5m 04/11/11martin.gastal@cern.ch67 Thu Mar 8 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability of Services: Crane after 17:30N PlugClose TX54 CryogenicsEL powerWater cool.Database ITMagnetC6F14Gas GS Dept Beam ON


Download ppt "Far side Near side -Z End +Z End 5m Wed Dec 7 ECAL CMXZEC CSC REDT+ RBTK FPIXSurvey HCAL TE-VSCEN Dept SL CP Availability."

Similar presentations


Ads by Google