21 Sept 2009 Markus Friedl Electronics 1 Electronics 2 Machine Shop HEPHY Scientific Advisory Board Meeting.

Slides:



Advertisements
Similar presentations
A Low Mass On-chip Readout Scheme for Double-sided Silicon Strip Detectors 13th February 2013 C. Irmler, T. Bergauer, A. Frankenberger, M. Friedl, I. Gfall,
Advertisements

Electrical QA Markus Friedl (HEPHY Vienna) IPMU, 19 March 2012.
The Silicon Vertex Detector of the Belle II Experiment
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Summary of the SVD session 19 March 2009 T. Tsuboyama (KEK)
The Belle II Silicon Vertex Detector Readout Chain Markus Friedl (HEPHY Vienna) TWEPP2012, 19 September 2012.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Using the EUDET pixel telescope for resolution studies on silicon strip sensors with fine pitch Thomas Bergauer for the SiLC R&D collaboration 21. May.
The Origami Chip-on-Sensor Concept for Low-Mass Readout of Double-Sided Silicon Detectors M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna.
The Belle SVD Trigger  Tom Ziegler  Vertex 2002  Kailua-Kona, Hawaii, 4-8 th nov The Belle SVD Trigger Tom Ziegler on behalf of the Belle SVD.
BTeV Trigger Architecture Vertex 2002, Nov. 4-8 Michael Wang, Fermilab (for the BTeV collaboration)
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Construction and Performance of a Double-Sided Silicon Detector Module using the Origami Concept C. Irmler, M. Friedl, M. Pernicka HEPHY Vienna.
Department of Semiconductor Detectors HEPHY Scientific Advisory Board 21 Oct Thomas Bergauer.
DC/DC Converter Update Markus Friedl (HEPHY Vienna) B2GM, 22 July 2012.
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna
19 November 2009 Christian Irmler (HEPHY Vienna) APV25 and Origami Scheme 4 th Open Meeting of the Belle II Collaboration.
Electrical Quality Assurance Markus Friedl HEPHY Site Qualification, 6 August 2015.
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
Global Trigger H. Bergauer, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J. Strauss,
7 th B2GM SVD Summary 19 November 2010 Markus Friedl (HEPHY Vienna)
APV25 for SuperBelle SVD M.Friedl HEPHY Vienna. 2Markus Friedl (HEPHY Vienna)11 Dec 2008 APV25 Developed for CMS by IC London and RAL (70k chips installed)
Status of the Beam Phase and Intensity Monitor for LHCb Richard Jacobsson Zbigniew Guzik Federico Alessio TFC Team: Motivation Aims Overview of the board.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
Leo Greiner IPHC DAQ Readout for the PIXEL detector for the Heavy Flavor Tracker upgrade at STAR.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
Status of SVD Readout Electronics Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
University of Nova GoricaBelle Collaboration S. Stanič, STD6, Sep , 2006 Status of the Belle Silicon Vertex Detector and its Development for Operation.
Construction and Test of the First Belle II SVD Ladder Implementing the Origami Chip-on-Sensor Design 29 Sept TWEPP 2015, C. Irmler (HEPHY Vienna)
Background Physicist in Particle Physics. Data Acquisition and Triggering systems. Specialising in Embedded and Real-Time Software. Since 2000 Project.
Super-Belle Vertexing Talk at Super B Factory Workshop Jan T. Tsuboyama (KEK) Super B factory Vertex group Please visit
1 Oct 2008 Markus Friedl Electronics 1 Electronics 2 Machine Shop HEPHY Scientific Advisory Board Meeting.
Swadhin Taneja Stony Brook University On behalf of Vertex detector team at PHENIX Collaboration 112/2/2015S. Taneja -- DNP Conference, Santa Fe Nov 1-6.
CALICE / Silicon PM activities Detector and readout electronics development Development of a system for mass production of AHCAL “HBU” scintillator/PCB.
The Compact Muon Solenoid. What does CMS do? The Compact Muon Solenoid is a general purpose particle detector installed at point 5 of the Large Hadron.
Trigger Meeting: Greg Iles5 March The APV Emulator (APVE) Task 1. –The APV25 has a 10 event buffer in de-convolution mode. –Readout of an event =
11 June 2015 Thomas Bergauer (HEPHY Vienna) Belle II SVD beam Test SPS 2015 SPS users meeting.
Barcelona 1 Development of new technologies for accelerators and detectors for the Future Colliders in Particle Physics URL.
12 September 2006Silicon Strip Detector Readout Module J. Hoffmann SIDEREM SIlicon Strip DEtector REadout Module.
Construction and Status of the Origami Module Prototype C. Irmler, M. Friedl HEPHY Vienna.
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
1 KU MRI What is the MRI? What is KU doing? Firmware/testboards Optical hybrids Sensors.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Terra-Pixel APS for CALICE Progress meeting 10 th Nov 2005 Jamie Crooks, Microelectronics/RAL.
ECFA Workshop, Warsaw, June G. Eckerlin Data Acquisition for the ILD G. Eckerlin ILD Meeting ILC ECFA Workshop, Warsaw, June 11 th 2008 DAQ Concept.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
Upgrade with Silicon Vertex Tracker Rachid Nouicer Brookhaven National Laboratory (BNL) For the PHENIX Collaboration Stripixel VTX Review October 1, 2008.
SVD DAQ Status Koji Hara (KEK) 2012/7/19 DAQ workshop1.
Status of the SVD DAQ Koji Hara (KEK) 2012/1/16 TRG/DAQ meeting1.
SVD Cables & Pipes Markus Friedl (HEPHY Vienna) B2GM, 24 July 2012.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
Draft of 3 year CMOS Strip Programme Need to advise WG3 on likely resource requirement Draft Outline provided at Valencia Discuss and improve basis for.
SVD FADC SVD-PXD Göttingen, 25 September 2012
SVD Electronics Constraints
SVD Introduction Wetzlar SVD-PXD Meeting, 4 February 2013
Electronics & Machine Shop
Detector building Notes of our discussion
 Silicon Vertex Detector Upgrade for the Belle II Experiment
Markus Friedl (HEPHY Vienna)
Technical Design for the Mu3e Detector
Example of DAQ Trigger issues for the SoLID experiment
BPAC, 17 October 2017 VXD GND/EMC Markus Friedl (HEPHY Vienna)
The CMS Tracking Readout and Front End Driver Testing
The LHCb Front-end Electronics System Status and Future Development
C. Irmler, M. Friedl, M. Pernicka HEPHY Vienna
Presentation transcript:

21 Sept 2009 Markus Friedl Electronics 1 Electronics 2 Machine Shop HEPHY Scientific Advisory Board Meeting

Electronics 1 Electronics 2 Machine Shop 2Markus Friedl21 Sept 2009 Mission Statement Development & maintenance of high-tech electronics & precision mechanics for HEP experiments –Electronics: In-house circuit design, assembly, firmware development and testing –Mechanics: Precision machining of prototypes and small series Support for CMS-Trigger, CMS-Tracker, Belle, ILC and Outreach projects

Electronics 1 Electronics 2 Machine Shop 3Markus Friedl21 Sept 2009 List of Members Electronics 1 –Staff: 8 persons, 7.1 FTE –Head: A.Taurok –Members: B.Arnold, H.Bergauer, M.Eichberger, K.Kastner, B.Neuherz, M.Padrta, T.Schreiner Machine Shop –Staff: 2 persons, 2.0 FTE –Head: A.Taurok –Members: M.Oderits, R.Stark Electronics 2 –Staff: 7 persons, 4.85 FTE –Head: M.Friedl –Members: I.Gfall, C.Irmler, M.Pernicka, J.Pirker, S.Schmid, H.Steininger

Electronics 1 Electronics 2 Machine Shop 4Markus Friedl21 Sept 2009 Skills Schematics design, PCB layout Assembly FPGA programming & simulation Beam tests Testing Machining Software development

Electronics 1 Electronics 2 Machine Shop 5Markus Friedl21 Sept 2009 Equipment …and many others: Software for Schematics/PCB and FPGA programming Pattern generators, oscillators, scopes Plate cutting & bending machines, drills, saws, … Vapor phase soldering machine BGA soldering machine 8 GHz real time oscilloscope CNC milling machine

Electronics 1 Electronics 2 Machine Shop 6Markus Friedl21 Sept 2009 Completed Projects DELPHI –FCA & VFT subdetectors –LTD electronics boards NA48 –Clock distribution –Calorimeter trigger –960 MHz-ADC system Outreach –LHC2008 exhibition CMS –Drift Tube Trigger –Global Muon Trigger –Global Trigger –Central Trigger Control –Analog Optohybrid –Pixel-FED Belle –FADCs for Silicon Tracker (SVD2)

Electronics 1 Electronics 2 Machine Shop 7Markus Friedl21 Sept 2009 Present Activities CMS –Trigger & Pixel: fine-tuning, adaptations, maintenance –R&D for CMS upgrade Belle II –Silicon Tracker for Belle II: R&D for Detector Module, Repeater, Data Acquisition, Control ILC Experiment –Mixed SiLC/CMS upgrade/Belle II beam test Outreach –Animated LHC wall poster

Electronics 1 Electronics 2 Machine Shop 8Markus Friedl21 Sept 2009 Present Activities – CMS Trigger Global Trigger upgrade Trigger definition using MATLAB Simulink Xilinx SystemGenerator makes VHDL code DSP inside CONDITION CHIP ALGO + FinOR (FDL) FPGA CTRL FPGA 4 4 CTRL FPGA Gbps Optical Links Mentor/ISE software implements chip design PSB_opt (Pipelined Synchronising Buffer) 3.2Gb/s optical links instead of cable Central Trigger Control Advanced version

Electronics 1 Electronics 2 Machine Shop 9Markus Friedl21 Sept 2009 Present Activities – CMS Tracker Pixel-FED upgrade Digital optical link instead of analog Partly re-using existing components Firmware development for heavy ion mode

Electronics 1 Electronics 2 Machine Shop 10Markus Friedl21 Sept 2009 Present Activities – Belle II R&D Origami Chip-on-Sensor Concept Thinned readout chips (APV25) on sensor Strips of bottom side are connected by flex fanouts wrapped around the edge All readout chips are aligned  single cooling pipe Shortest possible connections  high signal-to-noise ratio side view ~60cm Ladder configuration top view

Electronics 1 Electronics 2 Machine Shop 11Markus Friedl21 Sept 2009 Present Activities – Belle II R&D Full readout chain to DAQ To be designed and built by HEPHY Prototypes exist for all stages Origami module Repeater box FADC+PROC VME Data processing and hit time finding (~3ns RMS) in FPGA firmware

Electronics 1 Electronics 2 Machine Shop 12Markus Friedl21 Sept 2009 Present Activities – Outreach Animated LHC model + light queue = animated LHC wall poster Will be ready for the “Lange Nacht der Forschung” (Long night of research) outreach event, 7 November =

Electronics 1 Electronics 2 Machine Shop 13Markus Friedl21 Sept 2009 Timeline of Papers, Talks and Posters

Electronics 1 Electronics 2 Machine Shop 14Markus Friedl21 Sept 2009 Future Plans Belle II –Production of full silicon tracker (together with semiconductor group) and its complete readout chain CMS –Trigger: Development of Global Trigger for CMS upgrade –Tracker: Upgrade of Pixel-FED, stacked modules for L1 track trigger Outreach –New, improved spark chamber for our exhibitions Generic (motivated by Belle II and CMS) –Fast serial links –FPGA design & simulation, embedded programming

Electronics 1 Electronics 2 Machine Shop 15Markus Friedl21 Sept 2009 Some Objects Made by Us CMS – Analog Optohybrid CMS – Pixel-FED Belle II – Origami Module Outreach – Spark Chamber CMS – Global Trigger Belle II – Repeater

Electronics 1 Electronics 2 Machine Shop 16Markus Friedl21 Sept 2009 Backup Slides

Electronics 1 Electronics 2 Machine Shop 17Markus Friedl21 Sept 2009 Completed Projects – LHC2008 Exhibition LED- animated 3D-LHC model GRID globe (live data) CMS Optohybrid mobile Light queue (data transfer from CMS to GRID)

Electronics 1 Electronics 2 Machine Shop 18Markus Friedl21 Sept 2009 Present Activities – Belle II R&D Origami chip-on-sensor module