Arturo Alarcon Undulator Controls Module Status 11/12/2008 SLAC National Accelerator Laboratory 1 Undulator Controls Module Status.

Slides:



Advertisements
Similar presentations
Jose Chan FAC- Undulator System Installation & Assembly 10/30/07 1 Undulator System Installation & Assembly Schedule Jose.
Advertisements

Heinz-Dieter Nuhn, SLAC / LCLS Undulator Checkout and Startup Plans November 12, Undulator Checkout and Startup Plans Heinz-Dieter.
Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
Stephen Norum LCLS FAC April 16, LCLS Machine Protection System Overview Interim MPS Full LCLS MPS Design Schedule.
Ernest Williams FAC November 2008 Control Systems Software Section 1 Controls System Installation Status Ernest Williams for Controls Department.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
Geoff Pile FAC Review - Undulator 12 November 2008 LCLS Undulator System Overview and Fabrication Geoff Pile.
Hal Tompkins FEE/FEL June 16, FEE/FEL Commissioning Overview By Hal Tompkins Photon Beam Systems Deputy.
FAC, 4/20/06 D. Schultz 1 e-Beams System Update Linac System Preparing for downtime installation. Injector System Installation has started. Undulator System.
Jose Chan and Kathleen Ratcliffe FAC Review- LTU/DUMP installation Status & 6/16/08 1 Linac Installation Status, Schedule.
John N. Galayda LCLS Facility Advisory November 11, LCLS Update November 11, 2008 Construction Status LCLS Instruments.
John Arthur X-ray November 11, 2008 SLAC National Accelerator Laboratory 1 X-ray Overview LCLS Directorate structure.
Tom Himel Linac Controls Upgrade Nov SLAC National Accelerator Laboratory 1 Linac Controls Upgrade Status Tom Himel.
1 Arturo Alarcon 1 Undulator Controls Status FAC Undulator Controls Status Arturo Alarcon June 9, 2009.
Geoff Pile FAC Review - Undulator 17 June 2008 LCLS Undulator System Status and Schedule Geoff Pile.
Richard M. Boyce FAC April 16, LCLS Installation & Planning Integration process – IMT 2007 Installation Planning BTH.
Undulator Control Module Facility Advisory Committee Review, October 30th 2007.
John Arthur X-ray June 17, X-ray Overview XTOD current status XES current status Schedule to first experiments.
Paul Emma LCLS Commissioning Status Nov. 11, 2008 SLAC National Accelerator Laboratory 1 LCLS Commissioning Status P. Emma for The.
FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.
John Arthur Photon October 29, Photon Systems Update FAC recommendations Current status New plan for Photon Systems.
Richard M. Boyce FAC October 29-31, Installation Planning Integration process – IMT update Installation Planning &
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
1 E. Carrone 1 FEE PPS Status FAC FEE PPS Status Enzo Carrone June 8, 2009.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Arturo Alarcon FAC, Undulator June 17, 2008 Undulator Control Module Facility Advisory Committee June 17, 2008 SLAC -
E. Michael Saleski PPS and April 20, 2006 LCLS Personnel Protection System and Beam Containment System E. Michael Saleski.
Hamid Shoaee LCLS FAC Review – October Control System Overview Hamid Shoaee Controls System Manager Injector control system commissioning & Support.
Geoff Pile LCLS Und. System Fabrication FAC 29 th, 30 th & 31 st October 2007 LCLS Undulator System Fabrication Schedule FAC.
Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Controls Department LCLS Maintenance.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
John Seeman LCLS December 2, Conduct of LCLS Accelerator Operations John Seeman Assistant Director LCLS Directorate.
SPEAR Insertion Device Controls Upgrade Status Arturo Alarcon January, 2014.
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Franz Peters, Georg Gassner WPM/HLS Status and June 17 th, WPM & HLS Status and Schedule Franz Peters, Georg Gassner.
David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 1 Undulator Complex Status LCLS Introduction.
Joshua Stein LCLS Undulator 20 Feb 06 LCLS Undulator Controls ANL LCLS All-Hands Meeting February 20, 2006 Josh Stein Argonne.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
John N. Galayda LCLS Accelerator Readiness December 2, LCLS Overview December 2, 2008 Project Construction Status.
Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg May 21-23, SLAC EPICS Projects Yesteryear, Today, and Tomorrow.
Hamid Shoaee Control LCLS ARR Oct 31, LCLS Accelerator Readiness Review Control System for Injector Commissioning.
Patrick’s Updates - 8/30/11 (one slide for each of the following) 1.XTCAV Project 2.ASTA Gun Test Facility Instrumentation & Controls 3.Fast wire scanner.
Josh Stein 29-Apr-08 Undulator Controls Undulator Controls Status Update Josh Stein LCLS Undulator Controls CAM/TL.
Current Status of QBPM Electronics and Magnet Movers D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Experimental Facilities Planning
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
LTU/Undulator Installation Status
e-Beams Systems Update
Electron Beam Systems ETC and Methodology
Undulator Controls Breakout
Undulator Tuning Status Heinz-Dieter Nuhn, SLAC / LCLS for Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko, Scott Jansson, Ralph Colon, Dave.
Project Status Review May 13-15, 2008.
LCLS Undulator System Status and Schedule
FEE Diagnostics and Commissioning
Conventional Facilities Status
Shutdown Planning & Installation Schedule
E-Beams Systems Manager
LTU/Undulator Installation Status
LCLS Undulator System Status and Schedule
LCLS Operation in 2009 Roger A. Erickson
Linac Coherent Light Source Transition to Operations 11 July 2007
Installation Status & Operational Readiness Process
LCLS e- Beams System Overview
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
LCLS Undulator Controls Status
LINAC System Engineering / Design Status C.E. Rago
LCLS Control System Personnel Linac & BC2 Controls progress
Control System Overview Hamid Shoaee LCLS Control System Manager
Presentation transcript:

Arturo Alarcon Undulator Controls Module Status 11/12/2008 SLAC National Accelerator Laboratory 1 Undulator Controls Module Status FAC – November 2008 Schedules Scope of Undulator Controls Module Installation Status Mechanical interface Controls hardware Software infrastructure Utilities UCM EPICS Module Checkout Status

Arturo Alarcon Undulator Controls Module Status 11/12/2008 SLAC National Accelerator Laboratory 2 Re-establish e  to SL2 LTU/UndComm. First Light in FEE First Light in FEH NEH Ops & Commissioning JJFFMMAAMMJJJJAASSDDJJFFMMAAMMJJJJAASSOONNDDJJFFMMAAMMJJJJ ON A A Down PPS Linac/BC2 Commissioning FEL/FEECommissioning Nov. 3, 2008 Install Undulators M M D D LCLS Installation and Commissioning Time-Line LTU/Und Install PEP-II run ends FEE/NEH Install PPS Cert. LTU/Dump CD-4 (7/31/2010) X-Rays in NEH now D D Down? FEH Hutch BO

Arturo Alarcon Undulator Controls Module Status 11/12/2008 SLAC National Accelerator Laboratory 3 Schedule Stuart Metcalfe’s Schedule Undulator Controls module must be ready for the commissioning of the LTU-UND complex, ~December 15, 2008

Arturo Alarcon Undulator Controls Module Status 11/12/2008 SLAC National Accelerator Laboratory 4 Undulator Controls Module Scope Beam Finder Wire actuation Girder motion, five cams Undulator motion, two translation stages Temperature monitoring, twelve RTDs.

Arturo Alarcon Undulator Controls Module Status 11/12/2008 SLAC National Accelerator Laboratory 5 Mechanical Status All 33 girders in place Translation stages fiducialized at CMM lab Translation stages tested for proper motion Undulator roll-in test performed at CMM lab Girder linear pots installation almost complete Linear pot brackets, modification, installation Linear pot girder interface plates, fabrication, installation Linear pot range adjustments Linear pot cap installation

Arturo Alarcon Undulator Controls Module Status 11/12/2008 SLAC National Accelerator Laboratory 6 Controls Hardware Status All controls hardware has been delivered by Argonne, and has been installed at SLAC Mini rack VME crate and modules Undulator Controls Module Interface Undulator Module Power and Interlock Interconnect cables Electronics Interface Assembly

Arturo Alarcon Undulator Controls Module Status 11/12/2008 SLAC National Accelerator Laboratory 7 Software Infrastructure Status RTEMS RTEMS 4.9 running on the MVME3100 for the last couple of months RTEMS 4.9 running on production EPICS built again RTEMS 4.9, and running in production All necessary EPICS modules built and running in production

Arturo Alarcon Undulator Controls Module Status 11/12/2008 SLAC National Accelerator Laboratory 8 Utilities Status Power 120V AC online Network All IOC’s online Compressed air Installation in progress

Arturo Alarcon Undulator Controls Module Status 11/12/2008 SLAC National Accelerator Laboratory 9 UCM App Status Version 1.0 delivered by Argonne in July Running in production Displays integrated into lclshome Argonne currently working on some upgrades

Arturo Alarcon Undulator Controls Module Status 11/12/2008 SLAC National Accelerator Laboratory 10 Checkout Status Preliminary checkout complete Purpose is to discover basic problems quickly Detailed checkout in progress Procedure Calibration in progress Procedure Physicists checkout plan Physicists checkout plan