WaitLess*: Presentation #9 Team M2: Jared Dubin Terry Garove Alex Runas Manager: Panchalam Ramanujan Overall Project Objective: Table/bar service interface.

Slides:



Advertisements
Similar presentations
M2: Team Paradigm :: Milestone 6 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
Advertisements

Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 7: March 1st Component Layout (Corrected) Overall Project Objective: Design.
WaitLess*: Presentation #5 Team M2: Jared Dubin Terry Garove Alex Runas Manager: Panchalam Ramanujan Overall Project Objective: Table/bar service interface.
Parking Pal Team M1: Anna Kochalko Chris Moody Hong Tuck Liew John Wu Project Manager: Kartik Murthy November 5, 2007 Your digital parking meter of the.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Nov. 05 Overall Project Objective : Dynamic Control.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Oct. 29 Overall Project Objective : Dynamic Control.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Nov. 19 Overall Project Objective : Dynamic Control.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 6: Feb. 25 th Simulation Overall Project Objective: Design an Air-Fuel Ratio.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
WaitLess*: Presentation #6 Team M2: Jared Dubin Terry Garove Alex Runas Manager: Panchalam Ramanujan Overall Project Objective: Table/bar service interface.
Sprinkler Buddy Presentation #5: “Transistor Level Schematics and Another Floor Plan” 2/21/2007 Team M3 Sasidhar Uppuluri Kalyan Kommineni Kartik Murthy.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
RF Triangulator: Indoor/Outdoor Location Finding Architecture Proposal Giovanni Fonseca David Fu Amir Ghiti (away) Stephen Roos (away) Design Manager:
WaitLess: Changing Restaurants Today for a Better Tomorrow Team Members: Jared Dubin, Terry Garove, Alex Runas Design Manager: Panchalam Ramanujan Where's.
M2: Team Paradigm :: Milestone 8 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
Noise Canceling in 1-D Data: Presentation #9 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 Mar 23 rd, 2005 Full chip.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Noise Canceling in 1-D Data: Presentation #13 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 April 20 th, 2005 Short.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
The Wait-er Hater WaitLoss Program utilizing WaitLess Technology: Presentation #3 Team M2: Jared Dubin Terry Garove Alex Runas Manager: Panchalam Ramanujan.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 3: Feb. 4 th Size Estimates/Floorplan Overall Project Objective: Design an.
Viterbi Decoder: Presentation #11 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 11: 12 th April 2004 Short Final Presentation.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 10: April 5th Chip Level Simulation Overall Project Objective: Design an.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 11: April 12th Short Final Presentation Overall Project Objective: Design.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
RF Triangulator: Indoor/Outdoor Location Finding Architecture Proposal Giovanni Fonseca David Fu Amir Ghiti Stephen Roos Design Manager: Myron Kwai.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage IX: March 30 th 2004.
RF Triangulator: Indoor/Outdoor Location Finding Architecture Proposal Giovanni Fonseca David Fu Amir Ghiti Stephen Roos Design Manager: Myron Kwai.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Oct. 27 Overall Project Objective : Dynamic Control.
1 Team M1 Enigma Machine Milestone March, 2006 Adithya Attawar (M11) Shilpi Chakrabarti (M12) Zavo Gabriel (M13) Mike Sokolsky (M14) Design Manager:
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 9: March 31st Chip Level Simulatio Overall Project Objective: Design an Air-Fuel.
RF Triangulator: Indoor/Outdoor Location Finding Architecture Proposal Giovanni Fonseca David Fu Amir Ghiti Stephen Roos Design Manager: Myron Kwai.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
RF Triangulator: Indoor/Outdoor Location Finding Architecture Proposal Giovanni Fonseca David Fu Amir Ghiti Stephen Roos Design Manager: Myron Kwai.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Encryption Transaction with 3DES Team W2 Yervant Dermenjian (W21) Taewan Kim (W22) Evan Mengstab(W23) Xiaochun Zhu(W24) Objective: To implement a secure.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 8: March 24th Chip Level Layout Overall Project Objective: Design an Air-Fuel.
Sprinkler Buddy Presentation #8: “Testing/Finalization of all Modules and Global Placement” 3/26/2007 Team M3 Kartik Murthy Panchalam Ramanujan Sasidhar.
Group M3 Nick Marwaha Craig LeVan Jacob Thomas Darren Shultz Project Manager: Zachary Menegakis February 23, 2005 MILESTONE 6 Component Layout DSP 'Swiss.
Sprinkler Buddy Presentation #7: “Redesign of Adder Parts And Layout of Other Major Blocks” 3/07/2007 Team M3 Kalyan Kommineni Kartik Murthy Panchalam.
Group M3 Nick Marwaha Craig LeVan Jacob Thomas Darren Shultz Project Manager: Zachary Menegakis March 23, 2005 MILESTONE 9 Chip level LVS DSP 'Swiss Army.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Viterbi Decoder: Presentation #6 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 5: 23 rd Feb Component Simulation Design.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 5: Feb. 18 th Component Layout Overall Project Objective: Design an Air-Fuel.
Viterbi Decoder: Presentation #5 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 5: 18 th Feb Component layout Design Manager:
WaitLess*: Presentation #11 Team M2: Jared Dubin Terry Garove Alex Runas Manager: Panchalam Ramanujan Overall Project Objective: Table/bar service interface.
Viterbi Decoder: Presentation #7 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 7: 1st Mar Component layout (corrected)
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 4: Feb. 11 th Gate Level Design Overall Project Objective: Design an Air-Fuel.
Sprinkler Buddy Presentation #12: “Final Presentation Outline” 4/25/2007 Team M3 Kalyan Kommineni Kartik Murthy Panchalam Ramanujan Sasidhar Uppuluri Devesh.
The “we found out ‘waitless’ is a service that Sprint mobile offers, guess we can’t use that name” Project: Presentation #4 Team M2: Jared Dubin Terry.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage II: February 4 th 2004.
Group M3 Nick Marwaha Craig LeVan Jacob Thomas Darren Shultz Project Manager: Zachary Menegakis February 28, 2005 MILESTONE 7 Component Layout DSP 'Swiss.
M2: Team Paradigm :: Milestone 5 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Sprinkler Buddy Presentation #6: “Optimized Schematics and Component Layout” 2/28/2007 Team M3 Devesh Nema Kalyan Kommineni Kartik Murthy Panchalam Ramanujan.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
M2: Team Paradigm :: Milestone 7 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
Sprinkler Buddy Presentation #10: “LVS” 4/11/2007 Team M3 Sasidhar Uppuluri Devesh Nema Kalyan Kommineni Kartik Murthy Panchalam Ramanujan Design Manager:
1 Random Number Generator Dmitriy Solmonov W1-1 David Levitt W1-2 Jesse Guss W1-3 Sirisha Pillalamarri W1-4 Matt Russo W1-5 Design Manager – Thiago Hersan.
WaitLess: Changing Restaurants Today for a Better Tomorrow Probably put a picture here of like a restaurant or something also maybe a better subtitle?
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Sprinkler Buddy Presentation #9: “Layout and a New Feature” 4/4/2007 Team M3 Panchalam Ramanujan Sasidhar Uppuluri Devesh Nema Kalyan Kommineni Kartik.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Mon. Nov. 24 Overall Project Objective : Dynamic Control.
RF Triangulator: Indoor/Outdoor Location Finding Architecture Proposal Giovanni Fonseca David Fu Amir Ghiti Stephen Roos Design Manager: Myron Kwai.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Nov. 11 Overall Project Objective : Dynamic Control.
1 Design Goal Design an Analog-to-Digital Conversion chip to meet demands of high quality voice applications such as: Digital Telephony, Digital Hearing.
Presentation transcript:

WaitLess*: Presentation #9 Team M2: Jared Dubin Terry Garove Alex Runas Manager: Panchalam Ramanujan Overall Project Objective: Table/bar service interface controller chip 11/05/2007 Full Layout

Project Status Design proposal – complete Architecture - complete Name – still provisional, still debated Size estimates/basic floorplan – complete RTL / Behavioral - complete Structural – complete Schematic – complete Component layout – complete Functional block layout – complete-ish Functional block LVS - incomplete

New Floorplan

Decoder - One line of it

Full Decoder

SRAM with Decoder.434 density! <- ignore this hole

Flipflop

Some Old Friends…

FSM Output Logic

Top Level Layout

Issues/Concerns:  Making stuff fit  Still being able to route stuff  We’re doing our best to adhere to our new floorplan -- hopefully the remaining items will fit as planned