RF Triangulator: Indoor/Outdoor Location Finding 18-525 Architecture Proposal Giovanni Fonseca David Fu Amir Ghiti Stephen Roos Design Manager: Myron Kwai.

Similar presentations


Presentation on theme: "RF Triangulator: Indoor/Outdoor Location Finding 18-525 Architecture Proposal Giovanni Fonseca David Fu Amir Ghiti Stephen Roos Design Manager: Myron Kwai."— Presentation transcript:

1 RF Triangulator: Indoor/Outdoor Location Finding 18-525 Architecture Proposal Giovanni Fonseca David Fu Amir Ghiti Stephen Roos Design Manager: Myron Kwai Overall Project Objective: Design a Radio-Frequency indoor/outdoor navigation system, utilizing the existing wireless infrastructure. Design Stage Objective: LVS of all functional blocks

2 Status Structural Verilog complete. Structural Verilog complete. Schematics completed. Schematics completed. Layout of basic components complete. Layout of basic components complete. Major Layouts: Major Layouts: Still ~80% done because Spice simulations are being conducted to verify every part works before connectingStill ~80% done because Spice simulations are being conducted to verify every part works before connecting Global routing still needs to be doneGlobal routing still needs to be done

3 Current Transistor counts Total: 27,150 transistors* Top Three: 6,500 trans. 3 x FPU Add/Sub Unit 1500 trans. Control Registers & Muxes: 2000 trans. Calc: 17,950 trans. 2 x FPU Add/Sub Unit: 1500 trans. 1 x FPU Mult/Div Unit: ~5000 trans. 1 x Logshifter: 200 trans. 1 x Comparator: 800 transistors. FSM Logic: 850 transistors 25 x 12-bit M-S En Reg: 6600 trans. total 8-1,6-1,4-1,2-1 Mux Sets: 3000 trans. total Lookup: 2,700 trans. Control Registers & Muxes: 2000 trans. Control Logic: 163 trans. SRAM: 12k trans * count not including SRAM, with SRAM: ~38k

4 OVERALL FLOORPLAN

5 Floorplan details Aspect Ratio ~1:1 Size ~550x600u 2

6 Calc simulations Control point prop delay = the propagation delay to the output of the control point logic (average case)

7 Counter sims Rise time counter = rise time on the output of the counter

8 cont. Fall time counter = fall time on the output of the counter

9 Prop delay propdelaycounter1 = propagation delay of the Q output of the counter propdelaycounter2 = propagation delay of the Q_bar output of the propdelaycounter1 propdelaycounter2

10 Control points1& 2 Control points 1- 5 = the outputs of the some of the control points

11 Control points 3 and 4

12 Control point 5

13 Lookup mostly LVS

14 Questions/Concerns  LVS or Simulations  LVS in general