CMS Tracker Week – Module Test Meeting – April 2003 – Patrick Gartung 1 Status of US long term module testing Patrick Gartung University of California,

Slides:



Advertisements
Similar presentations
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status 27 May Sam Burke UCSB HEP Group.
Advertisements

1/8/04Lance Simms Thermal Testing of TOB/TEC Hybrids at UCSB.
Slide 1L3 Testing Meeting March 7, 2003UCSB Status-Anthony Affolder UCSB Testing Status Anthony Affolder (for the UCSB module testing group) Current testing.
Thermal Testing of TEC/TOB Hybrids at UCSB 1/20/04 Slide 1 Thermal Testing of TOB/TEC Hybrids at UCSB.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 4 August 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 25 August 2003 Sam Burke UCSB HEP Group.
Status of UCSB LT Testing All 10 slots are equipped with UTRI, PAACB and adapter boards. All 10 UTRI connected to multiplexer. All 10 slots have HV connections.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 11 August 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 3 November 2003 Sam Burke Lance Simms.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 30 June Sam Burke UCSB HEP Group.
Juan Valls 1 TOB System Test Status Report  DS ROD System Test Setup  DAQ Software  DS ROD Characterization PLL, FED Timing Scans OPTO Scans  Noise.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 13 October 2003 Sam Burke Lance Simms.
US Module Production Status Joe Incandela University of California Santa Barbara for the US CMS Silicon Tracker Group CERN Tracker Week July 2004.
Slide 1UCSB Rod Production presented by Jim LambDOE review, January 20, 2004 UCSB Rod Production UCSB Rod Production, Jan , presented by Jim Lamb.
Slide 1 Control Software for the CMS Pixel Readout 28 April 2004 R.Stone, Rutgers (J.Doroshenko, DW.Kim, U.Joshi, L.Perera, J.C. Yun, et al) CMS Pixel.
Anthony AffolderUS CMS Meeting 12/3/2002Proposal of UCSB Short-term Testing Program Assumptions Electrical and optical hybrids not burnt-in prior to arrival.
CMS Tracker Week – Module Test Meeting – July 2003 – Patrick Gartung 1 Long term rod testing software Patrick Gartung University of California, Riverside.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 23 June Sam Burke UCSB HEP Group.
Slide 1 Anthony Affolder US Silicon Meeting, March 9, 2004 Equipment Status ARCS equipment status à Single module and 4 hybrid DAQ equipment status à Vienna.
Slide 1Rod Production presented by Jim Lamb (UCSB)April 9, 2004 Rod Production Rod Production, April , presented by Jim Lamb (UCSB)
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status 20 May Sam Burke UCSB HEP Group.
US CMS Silicon Electronics Testing – CMS Lehman Review - May 21, Affolder1 US CMS Silicon Electronics Testing US CMS Lehman Review BNL 5/21/03 A.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 10 June Sam Burke UCSB HEP Group.
1 FEE Installation & Commissioning TPC Meeting, 21 April 2006 L. Musa.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 7 July 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 17 June Sam Burke UCSB HEP Group.
CMS Tracker Week – L3 Meeting – April 2003 – Patrick Gartung 1 UC Riverside Testing Facilities Patrick Gartung University of California, Riverside.
Anthony AffolderUS CMS Meeting 12/3/02DAQ Based Systems LV/HV Needs DAQ Power Supply Needs HV à 600 V/~1mA range –0.1-1  A Current Sensing –Over Voltage/Current.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 21 July 2003 Sam Burke UCSB HEP Group.
DAQ Status. F.S. Cafagna, Coll. Meeting 16 March Hardware  In 555, one equipped crate for VME readout  top crate  9U crate  Power Supply 
SBS/A1n DAQ status Alexandre Camsonne August 28 th 2012.
Status of the PCI Test Stand Hardware status: Three known working PTS’s: 2 at FNAL, 1 at UIUC. Korean group working on one, LBL has one running yet? Adapter.
RPC STATUS AT PANJAB UNIVERSITY Panjab University, Chandigarh India-CMS Meeting, 28 th July, 2011.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status Sam Burke UCSB HEP Group.
D0 Workshop Bagby, Foglesong John Foglesong Run 2B SMT Low Voltage Power The present location of the SMT DC power supply units creates a problem.
Mobile DAQ Testbench ‘Mobi DAQ’ Paulo Vitor da Silva, Gerolf Schlager.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
Juan Valls - LECC03 Amsterdam 1 Recent System Test Results from the CMS TOB Detector  Introduction  ROD System Test Setup  ROD Electrical and Optical.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
V.Duk, INFN Perugia1 CHOD/NHOD status Viacheslav Duk, INFN Perugia Ferrara,
FPix DCS Subgroup Report
TOF Low Voltage and High Voltage Systems Vahe Ghazikhanian UCLA Department of Physics and Astronomy V. Ghazikhanian July 21, 2005.
EMU Slice Test Run Plan a working document.
System Tests at Lyon From Aachen: ICB for front petal side A, disks 4-6, rings 4 and 6 From CERN: CCU25 Tests (M. Ageron): FEC ring and I2C addressing.
ROD assembly and test in US
DAQ Equipment Status 2 fully equipped Vienna boxes at UCSB and FNAL
UCSB Testing Status Anthony Affolder
UCSB Testing Status Anthony Affolder
UCSB Short-term Testing Plan
Results from module testing
UCSB Testing Status Anthony Affolder
Hardware Needs (Near Term)
On behalf of the US TOB testing group
First Assembled Rod in US
US Testing Update Anthony Affolder (On behalf of the US testing group)
UCSB Short-term Testing Plan
Operations/Failure Analysis
US Module Testing Progress Report
Operations/Failure Analysis
Operations/Failure Analysis
Hybrid & Module Testing Status
US Module Testing Progress Report
Operations/Failure Analysis
US Rod Burn-in Readiness DAQ Hardware/Power Supplies
Equipment Status ARCS equipment status DAQ equipment status
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
Presentation transcript:

CMS Tracker Week – Module Test Meeting – April 2003 – Patrick Gartung 1 Status of US long term module testing Patrick Gartung University of California, Riverside DAQ Hardware Requirements Current setup Needs DAQ Software Status Results Conclusions

CMS Tracker Week – Module Test Meeting – April 2003 – Patrick Gartung 2 Hardware requirements for fully loaded cold box – 10 modules 1 PC with 4 PCI slots 1 TSC 1 FED 1 FEC 1 A1303 CAEN controller 1 ISA slot 1 DI/O card 1 PCI or ISA slot for ethernet 1 COM port for TRHX control 1 Vienna cold box 1 Vienna cold box PS 1 Torino interlock box 1 Chiller (1.5 6° C) 1 TRHX control box 1 NIM crate 3 electrometers (12 channels) Standalone boards 1 TPO 2 CCU 10 PAACB 10 VUTRI 10 hybrid-to-vutri (version d) 1 Fed-mux crate 3 Fed-mux cards 2 PAACB-to-TPO interface (backplane pulsing) 1 LIMO to DI/O cable adapter Power Supplies 1 SYS 127 CAEN crate 1 A128HS CAENET interface 3 A332 CAEN modules (12 high voltage channels) low voltage supplies for TPO, VUTRI’s, CCU’s, FED-mux crate

CMS Tracker Week – Module Test Meeting – April 2003 – Patrick Gartung 3 Hardware requirements for 4 modules per test cycle 1 PC with 4 PCI slots 1 TSC 1 FED 1 FEC 1 A1303 CAEN controller 1 ISA slot 1 DI/O card 1 PCI or ISA slot for ethernet 1 COM port for TRHX control 1 Vienna cold box 1 Vienna cold box PS 1 Torino interlock box 1 Chiller (1.5 6° C) 1 TRHX control box 1 NIM crate 1 electrometers (4 channels) Standalone boards 1 TPO 1 CCU 4 PAACB 4 VUTRI 4 hybrid-to-vutri (version d) 1 LIMO-to-DI/O cable adapter Power Supplies 1 SYS 127 CAEN crate 1 A128 HS CAENET controller 1 A332 CAEN module (4 high voltage channels) low voltage supplies for TPO, VUTRI’s, CCU’s, FED-mux crate

CMS Tracker Week – Module Test Meeting – April 2003 – Patrick Gartung 4 Hardware setup

CMS Tracker Week – Module Test Meeting – April 2003 – Patrick Gartung 5 Hardware needs with what we have on hand now *does not include ARC stand needs

CMS Tracker Week – Module Test Meeting – April 2003 – Patrick Gartung 6 Hardware needs with all hardware in route *does not include ARC stand needs

CMS Tracker Week – Module Test Meeting – April 2003 – Patrick Gartung 7 Software status UCSB LT PC Debian 3.0 Linux distribution installed ( kernel) DAQ drivers compiled and verified to work Long term test software compiled and verified to work with the hardware we have now Measured noise and pedestals using mainMonitor program Monitored temperature and humidity sensors using ClientTools/test/bin programs Cycled temperature of cold box using mainMonitor program Compiled CAEN A1303 device driver and integrating into LT test software (/dev/a303  /dev/a1303) Xrod software compiled and verified to work Measured noise and pedestals Measured gain scan FNAL LT PC RedHat 7.3 Linux distribution installed Compiling DAQ drivers (problems with 2.4.x kernel) Will try Debian 3.0 distribution ( kernel) FNAL DAQ PC Debian 2.0 Linux distribution installed Older DAQ drivers compiled and functionality verified Older DAQ version not compatible with current LT test software

CMS Tracker Week – Module Test Meeting – April 2003 – Patrick Gartung 8 Software results Pedestal and noise measured on a bare hybrid mounted on cold box plate and inserted into cold box slot. Measurements made using long term test software.

CMS Tracker Week – Module Test Meeting – April 2003 – Patrick Gartung 9 Software results Same hybrid as before. Gain scan and noise measured using Xrod.

CMS Tracker Week – Module Test Meeting – April 2003 – Patrick Gartung 10 Thermal Cycling

CMS Tracker Week – Module Test Meeting – April 2003 – Patrick Gartung 11 Conclusions Need a few more parts to begin testing modules and working out bugs at UCSB Software compiled and ready to be verified for real hardware on UCSB machine Stopping at Fermilab next week to get LT software running on LT machine With delivery of additional parts Fermilab can begin testing modules and working out bugs

CMS Tracker Week – Module Test Meeting – April 2003 – Patrick Gartung 12 Hardware requirements for 8 modules per test cycle 1 PC with 4 PCI slots 1 TSC 1 FED 1 FEC 1 A1303 CAEN controller 1 ISA slot 1 DI/O card 1 PCI or ISA slot for ethernet 1 COM port for TRHX control 1 Vienna cold box 1 Vienna cold box PS 1 Torino interlock box 1 Chiller (1.5 6° C) 1 TRHX control box 1 NIM crate 2 electrometers (8 channels) Standalone boards 1 TPO 2 CCU 8 PAACB 8 VUTRI 8 hybrid-to-vutri (version d) 1 Fed-mux crate 2 Fed-mux cards 1 PAACB-to-TPO interface 1 LIMO-to-DI/O cable adapter Power Supplies 1 SYS 127 CAEN crate 1 A128 HS CAENET controller 2 A332 CAEN modules (8 high voltage channels) low voltage supplies for TPO, VUTRI’s, CCU’s, FED-mux crate