Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status 20 May Sam Burke UCSB HEP Group.

Similar presentations


Presentation on theme: "Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status 20 May Sam Burke UCSB HEP Group."— Presentation transcript:

1 Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status 20 May Sam Burke UCSB HEP Group

2 Slide 2UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Progress Claim filed with Fed-Exp for $480 to cover cost of Coolie Box rebuild Work on Temp/Humidity Probes 6ft Rack acquired for 18 months à ARC Power Supplies in rack Thermoelectric Element ordered ($400) Reverse Engineering Coolie Relay board

3 Slide 3UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Progress Testing of damaged Coolie Box à power-up looks normal à no RS232 response on power up High Current Connectors Here

4 Slide 4UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Equipment Rack NIM Crate ARC P/S ARC Controllers Collie Controller ARC P/S Peltier P/S Relay Interface N2/Water Manafold

5 Slide 5UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Current Needs NIM Crate (pulse gen, nim-ttl-nim, or) Water manafold design (1L/m) à closed loop with chilled water (400w) Nitrogen manifold design (.02L/m & 0.2L/m) à dry air or Nitrogen? If N then bottles or gen?

6 Slide 6UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Current Needs Dedicated PC setup with; bar code reader, serial port, 2 PCI slots for Aachen modules New Coolie Box back panel à damaged panel à new connectors Plumbing (air+water) design à ASC Rep contacted to visit UCSB re valves

7 Slide 7UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Future Plans Complete Tests on Coolie Box and order a 2nd if required à Install new power transformer if unit is ok Communicate with Digital Temperature Sensors Design Temp Sensor PC Card Install LabView on PC and test CERN code Design Solenoid valve Interface


Download ppt "Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status 20 May Sam Burke UCSB HEP Group."