Presentation is loading. Please wait.

Presentation is loading. Please wait.

Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status Sam Burke UCSB HEP Group.

Similar presentations


Presentation on theme: "Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status Sam Burke UCSB HEP Group."— Presentation transcript:

1 Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status Sam Burke UCSB HEP Group

2 Slide 2UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Progress Thermoelectric (TE) Power Supply Tested in Constant Current Mode Temperature and Humidity Sensors in hand 6ft Rack Located in basement New Transformer for Coolie Box on order New TE power connectors ordered

3 Slide 3UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Equipment Rack

4 Slide 4UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Current Needs NIM Crate NIM Pulse Generator NIM-TTL-NIM Converter NIM OR Logic Module

5 Slide 5UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Current Needs Dedicated PC setup with; bar code reader, serial port, 2 PCI slots for Aachen modules Table to hold Test Chamber and PC (next to rack) New Coolie Box back panel Plumbing (air+water) design

6 Slide 6UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Future Plans Test Coolie Box Communicate with Digital Temperature Sensors Install equipment in rack Order Thermoelectric Element Design Temp Sensor PC Card


Download ppt "Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status Sam Burke UCSB HEP Group."

Similar presentations


Ads by Google