Slide 1US silicon group meeting 5/6/2003 Hybrid Testing Status 10 new hybrids brought by Lenny all tested à 9 tested with no flaws à 1 had 1 chip + 1 wirebond.

Slides:



Advertisements
Similar presentations
Status of Pixel Test Niigata University/RIKEN Kohei Fujiwara.
Advertisements

1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 Faulty Channel Sources (TOB) Fault Sources (excluding cable breaks and CMN)  Hybrid-0.004%
Slide 1L3 Testing Meeting March 7, 2003UCSB Status-Anthony Affolder UCSB Testing Status Anthony Affolder (for the UCSB module testing group) Current testing.
Slide 1X-Calibration Common Testing Issues-Anthony AffolderModule Testing Meeting, June 3, 2003 X-Calibration Common Testing Issues: Grounding, Environmental.
1 Hybrid & Module Testing Status Week of 4/25-4/29.
May 13, FNAL Hybrid Thermal Test Status  Hybrid Thermal Test Procedure  Test Results Eva Medel FNAL CMS Group June 22, 2004.
Recent TOB Developments First LT failure and Stereo Module Status J. Incandela With slides provided by E. Chabalina, A. Affolder, Dean White.
1 Hybrid & Module Testing Status Week of 6/6-6/10.
Finding ST Sensors that cause CMN: A Follow up to TSC Meeting N. 215 Prof. J. Incandela UC Santa Barbara US CMS Tracker Project Leader Tracker Steering.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
Anthony AffolderUS CMS Meeting 12/3/02Previous Burn-in Experience CDF Burn-in Experience Hybrid Burn-in à 4 days with extensive tests at start/end à ~9.
1 US Testing Status-Anthony AffolderModule Testing Meeting, Dec. 11, 2003 Update of US Testing Status Anthony Affolder On behalf of the US testing group.
UCSB Encapsulation Studies UC Santa Barbara Based upon a 6 week study by F. Garberson in collaboration with A. Affolder, J. Incandela, S. Kyre and many.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
Ladder QA Status. Ladder QA Summary Ladder Remarks 1XXXXXXXXOOOOOXOO left : short (via-GND) right chip3 : cannot mask 2OOOOOOOOOOOOOOO.
CMS Tracker Week, CERN, Apr Apr 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Module Production ___________ Report on.
Tracker Week, CERN, Oct Oct 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 21 Oct.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
CMS Week, CERN, June June 2004CMS Week - TPOSalvatore Costa - Catania Repair Centers, from a Bonder’s point of view Reported by: Salvatore.
A New Inner-Layer Silicon Micro- Strip Detector for D0 Alice Bean for the D0 Collaboration University of Kansas CIPANP Puerto Rico.
APVDAQ Status Markus Friedl 22 January M.Friedl: APVDAQ Status2 Introduction What APVDAQ Can Do What APVDAQ Cannot Yet Do What APVDAQ Cannot Do.
Electrical Tests of Modules and Ladders Markus Friedl (HEPHY Vienna) 2 October 2014.
Bonding study of wrapping part of PA1/2
UCSB Hybrid Bonding & Testing
FNAL Production Experience
APV Lectures APV FE Basic Building Blocks How Our Testing Works
On behalf of the US TOB testing group
Hybrid & Module Testing Status
Update of US Testing Status
APV Lectures APV FE Basic Building Blocks How Our Testing Works
Executive summary from Bonding WG Meeting 21 Oct 2003
UCSB Short-term Testing Plan
UCSB Testing 3 Stereo Modules Tested 1 SS6 Module Tested
A. Kaminskiy, CMS Tracker week , Apr 2004
Recent TOB Developments
Vienna Module Production
FNAL Module Testing Status
On behalf of the US TOB testing group
The measurement set-up
Noise in TOB modules and sensor quality
Hybrid Testing Status 10 new hybrids brought by Lenny all tested
UCSB Qualification Module Grading
Hybrid & Module Electrical Testing
Sensor probing (Summary)
First UCSB TEC Module (Pictures)
Hybrid & Module Testing Status
FNAL Hybrid Testing Status
Module Testing Status Week of 6/14-6/20.
Noise in TOB modules and sensor quality
Production Status 39 modules produced
Hybrid & Module Testing Status
Is Increased Bias Current and CMN Correlated?
TOB Module Production Overview and Plan
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Module Failures on Rods
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
FNAL Hybrid Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
FNAL Bonding Since our last report we have built and bonded an additional 10 TOB 4-chip modules 3 RMT pitch adapters 7 Planar pitch adapters By adjusting.
FNAL Hybrid Testing Status
FNAL Hybrid Testing Status
FNAL Hybrid Testing Status
Presentation transcript:

Slide 1US silicon group meeting 5/6/2003 Hybrid Testing Status 10 new hybrids brought by Lenny all tested à 9 tested with no flaws à 1 had 1 chip + 1 wirebond smashed –Looks like smashed by a finger –Probably occurred during taping down for shipping 10 new hybrids just arrived from FNAL à Visually inspected –One foot lift between hybrid-APV (long bond) à Test to keep up with production

Slide 2US silicon group meeting 5/6/2003 Ladder Testing Status 8 modules bonded so far à 1 st module had 3 opens between PA-sensor (unbondable) and 2 opens added between sensor-sensor for testing –Removed all bonds from problems found in sensor probing –Two channels found to have high noise which increase with voltage (3.5  5.0 ADC) Damage found on sensor à 2 nd -4 th module had bias return bonds missing –Damage to bulk unrepairable Draw ~80  A, ~600  A, ~800  A –2 opens between APV-PA found in one module, otherwise no other bonding problems –Will turn into x-calibration pieces with shorts and pinholes added on purpose à 5 th and 6 th modules perfect –Three channels have high noise which increases with voltage (1.5  1.9 ADC) and (1.7  9.0 ADC) Damage found on sensor à 7 th module had wirebond damage on ~40 channels between APV and PA –Not clear how or when à 8 th module had no bonding problems –Channels found bad in sensor probing pulled –2 channels has increasing noise vs. voltage (1.5  3.0 ADC) Neighbors of pinhole found in probing

Slide 3US silicon group meeting 5/6/2003 High noise channels

Slide 4US silicon group meeting 5/6/2003 Ladder Testing Summary LadderBias CurrentSensor Bad Channels Bonding Bad Channels Testing Bad Channels Total % Bad Channels GradeComments nA %B 2 channels with high noise not in sensor probing 0018-P1 613  A 1.5 Bulk damage %F Missing bias bonds, turn into x- calibration piece 0019-P1 758  A 1.5 Bulk damage %F Missing bias bonds, turn into x- calibration piece 0024-P1 89  A 4.5 Bulk damage %F Missing bias bonds, turn into x- calibration piece; 2 opens during APV- PA bonding nA0 (1??)000.0%A One channel has increasing noise with voltage; sensor damage seen nA0 (2??)000.0%A Two channels have increasing noise with voltage; sensor damage seen 879 ~ 40 smashed wirebonds APV- PA, reconverable nA2(+2??)000.3%A Neighbors of pinhole 550 V

Slide 5US silicon group meeting 5/6/2003 Summary 4 of 8 bonded modules good à 3 had bias return bonds missing à 1 has ~40 APV-PA bonds smashed –Can be repaired Of 4 good modules à All have channels with increasing noise vs. voltage –2 channels on 1 ladder due to inherit pinhole –5 channels total on 3 ladders due to lithographic errors in sensor production Not seen in wafer probing