Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 9: March 31st Chip Level Simulatio Overall Project Objective: Design an Air-Fuel.

Slides:



Advertisements
Similar presentations
Status Specification definition (done) Architecture
Advertisements

M3: ProDiver 525 Kavita Arora (M3-1) *Lisa Gentry (M3-2) Steven Wasik (M3-3) Karolina Werner (M3-4) Stage : 4 Feb 04 Size Estimates/ Floor Plan Overall.
M2: Team Paradigm :: Milestone 6 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 7: March 1st Component Layout (Corrected) Overall Project Objective: Design.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Oct. 29 Overall Project Objective : Dynamic Control.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 6: Feb. 25 th Simulation Overall Project Objective: Design an Air-Fuel Ratio.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Overall Project Objective: To design a chip for a SCUBA diver that does real-time calculations to warn the diver of safety concerns including decompressions.
M2: Team Paradigm :: Milestone 8 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
Encryption Transaction with 3DES Team W2 Yervant Dermenjian (W21) Taewan Kim (W22) Evan Mengstab(W23) Xiaochun Zhu(W24) Objective: To implement a secure.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Noise Canceling in 1-D Data: Presentation #12 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 April 11 th, 2005 Final.
Noise Canceling in 1-D Data: Presentation #13 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 April 20 th, 2005 Short.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage VI: February 25 h 2004.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 3: Feb. 4 th Size Estimates/Floorplan Overall Project Objective: Design an.
Viterbi Decoder: Presentation #11 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 11: 12 th April 2004 Short Final Presentation.
Huffman Encoder Project. Howd - Zur Hung Eric Lai Wei Jie Lee Yu - Chiang Lee Design Manager: Jonathan P. Lee Huffman Encoder Project Final Presentation.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 10: April 5th Chip Level Simulation Overall Project Objective: Design an.
Noise Canceling in 1-D Data: Presentation #10 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 Mar 28 rd, 2005 Chip Level.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 11: April 12th Short Final Presentation Overall Project Objective: Design.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage IX: March 30 th 2004.
RF Triangulator: Indoor/Outdoor Location Finding Architecture Proposal Giovanni Fonseca David Fu Amir Ghiti Stephen Roos Design Manager: Myron Kwai.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Oct. 27 Overall Project Objective : Dynamic Control.
Design Goal Design an Analog-to-Digital Conversion chip to meet demands of high quality voice applications such as: Digital Telephony, Digital Hearing.
Group M3 Nick Marwaha Craig LeVan Jacob Thomas Darren Shultz Project Manager: Zachary Menegakis April 4, 2005 MILESTONE 11 LVS & Simulation DSP 'Swiss.
M3: ProDiver 525 *Kavita Arora (M3-1) Lisa Gentry (M3-2) Steven Wasik (M3-3) Karolina Werner (M3-4) Stage : 2 Feb 04 Size Estimates/ Floor Plan Overall.
1 Team M1 Enigma Machine Milestone March, 2006 Adithya Attawar (M11) Shilpi Chakrabarti (M12) Zavo Gabriel (M13) Mike Sokolsky (M14) Design Manager:
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
RF Triangulator: Indoor/Outdoor Location Finding Architecture Proposal Giovanni Fonseca David Fu Amir Ghiti Stephen Roos Design Manager: Myron Kwai.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
M3: ProDiver 525 *Kavita Arora (M3-1) Lisa Gentry (M3-2) Steven Wasik (M3-3) Karolina Werner (M3-4) Stage : 9 Mar 29 Chip Level Simulation Overall Project.
RF Triangulator: Indoor/Outdoor Location Finding Architecture Proposal Giovanni Fonseca David Fu Amir Ghiti Stephen Roos Design Manager: Myron Kwai.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage VIII: March 24 th 2004.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Encryption Transaction with 3DES Team W2 Yervant Dermenjian (W21) Taewan Kim (W22) Evan Mengstab(W23) Xiaochun Zhu(W24) Objective: To implement a secure.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 8: March 24th Chip Level Layout Overall Project Objective: Design an Air-Fuel.
Sprinkler Buddy Presentation #8: “Testing/Finalization of all Modules and Global Placement” 3/26/2007 Team M3 Kartik Murthy Panchalam Ramanujan Sasidhar.
Sprinkler Buddy Presentation #7: “Redesign of Adder Parts And Layout of Other Major Blocks” 3/07/2007 Team M3 Kalyan Kommineni Kartik Murthy Panchalam.
Noise Canceling in 1-D Data: Presentation #5 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 Feb 21 st, 2005 Component.
Group M3 Nick Marwaha Craig LeVan Jacob Thomas Darren Shultz Project Manager: Zachary Menegakis March 23, 2005 MILESTONE 9 Chip level LVS DSP 'Swiss Army.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
1 Farhan Mohamed Ali (W2-1) Jigar Vora (W2-2) Sonali Kapoor (W2-3) Avni Jhunjhunwala (W2-4) Presentation 8 MAD MAC nd March, 2006 Functional Block.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 5: Feb. 18 th Component Layout Overall Project Objective: Design an Air-Fuel.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 4: Feb. 11 th Gate Level Design Overall Project Objective: Design an Air-Fuel.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Oct. 20 Overall Project Objective : Dynamic Control.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage II: February 4 th 2004.
Group M3 Nick Marwaha Craig LeVan Jacob Thomas Darren Shultz Project Manager: Zachary Menegakis February 28, 2005 MILESTONE 7 Component Layout DSP 'Swiss.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage II: 26 th January 2004.
M2: Team Paradigm :: Milestone 5 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Sprinkler Buddy Presentation #6: “Optimized Schematics and Component Layout” 2/28/2007 Team M3 Devesh Nema Kalyan Kommineni Kartik Murthy Panchalam Ramanujan.
M2: Team Paradigm :: Milestone 7 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
Sprinkler Buddy Presentation #10: “LVS” 4/11/2007 Team M3 Sasidhar Uppuluri Devesh Nema Kalyan Kommineni Kartik Murthy Panchalam Ramanujan Design Manager:
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Noise Canceling in 1-D Data: Presentation #4 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 Feb 14 th, 2005 Gate Level.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Mon. Nov. 24 Overall Project Objective : Dynamic Control.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage IV: February 18 h 2004.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Oct. 15 Overall Project Objective : Dynamic Control.
RF Triangulator: Indoor/Outdoor Location Finding Architecture Proposal Giovanni Fonseca David Fu Amir Ghiti Stephen Roos Design Manager: Myron Kwai.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Nov. 11 Overall Project Objective : Dynamic Control.
1 Design Goal Design an Analog-to-Digital Conversion chip to meet demands of high quality voice applications such as: Digital Telephony, Digital Hearing.
Team W3: Anthony Marchetta Derek R. Ritchea David M. Roderick Adam Stoler Milestone 1: Jan 21 st Project Proposal Overall Project Objective: Design an.
ADPCM Adaptive Differential Pulse Code Modulation
Alpha Blending and Smoothing
Presentation transcript:

Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 9: March 31st Chip Level Simulatio Overall Project Objective: Design an Air-Fuel Ratio Controller for a small gasoline engine with low emissions and low cost Design Manager: Steven Beigelmacher

Status Design Proposal (done) Architecture (done) High Level C Simulation Behavioral Verilog & Test Bench Floorplan & Structural Verilog Gate Level Design (done) Top Level Schematic Verification Component Layout (done) Analog simulation of SRAM and ROM Layout of all components Component Simulation (done) Smaller Multiplier completed Chip-Level Layout(95%) Top-level LVS errors Still to be done Top level simulation

12bit Input Reg 8X10 SRAM Value Look-up 12bit Input Reg Engine Speed Manifold Pressure 12bit Input Reg Throttle Position Fixed Point Array Multiplier 2:1Mu x 12bit Output Register Control ROM 12bit Input Reg %Oxygen 7X4 SRAM Comparator Look-up 4:1Mux = R0 12bit Register Win Sin[0:1] 2:1Mu x Rcomp Sin[0:1] Index[0:4] Write R1 R2 RowComp[0]RowComp[1] Srow1 Srow2 RowComp[2] 3bit Reg Wcol Index[0:6] Write Rtable 2:1Mu x Scol ColTable[0:3] 2:1Mu x Scol Valid Wmult1 Wmult2 Smult 5bit State Reg Next[0:4] Wout PulseOut[0:11]

Design Decisions Redid top-level layout –Divided into three big blocks –Each individual block passes LVS –Top Level should be relatively simple to get working

Simulation Plan Cannot run full simulation –Requires ~120 cycles to load SRAM and generate first correct outputs Simulate one iteration of comparisons and index generation for lookup table –Only requires ~10 cycles –Verifies any timing and control issues –Multiplier and SRAM lookup table have already been verified –Still simulate whole chip for accurate loading (many transistors will be inactive)

Mask – Poly & Active

Mask – Metal 1

Mask – Metal 2

Mask – Metal 3

Mask – Metal 4

Top Level Layout 383x273(µm)

Layout 383 x 273 (µm) 104,559 (µm2 ) Aspect Ratio: 1.4 Trans. Density:.167 Tran/ µm 2 Transistor Count = 17,465 Clock Speed 1MHz – speed is not our goal

Questions????