1 UCSB Module Assembly Week of 5/16-5/20. 2 UCSB Parts Inventory 5/23/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu8511702084070247 L12pd0002084070247.

Slides:



Advertisements
Similar presentations
Status of Sensor and Hybrid Production LHCb Zurich Week T. Bowcock.
Advertisements

Clean Room Plans Monday, August 23, Hybrids--- Frames--- SensorsModules.
ATLAS Module building at Glasgow
Tracker Week – UCSB Gantry Status – April 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara Dean White.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
TOB Status Joe Incandela University of California, Santa Barbara For the TOB Group Tracker General Meeting Sep. 21, 2001 at CERN Slides courtesy of: A.
DOE REVIEW 1/20/04 – Dean White 1 Gantry Module Assembly TOB & TEC Dean White University of California, Santa Barbara.
1 Hybrid & Module Testing Status Week of 4/25-4/29.
Tracker Week – UCSB Gantry Status – Febuary 10, 2004 – Dean White 1 Gantry Status University of California Santa Barbara UCSB Gantry Team: Andrea Allen.
CMS Week – UCSB Gantry Status – March 15, 2005 – Dean White 1 Weekly Status Report Production: 84 hybrids bonded last week, all tested fine. 45 modules.
1 UCSB Module Assembly Week of 5/23-5/27. 2 FNAL & UCSB Inventory HybridsSensorsFrames FNALUCSBFNALUCSBFNALUCSB STHPKITSTHPKITSTHPKITSTHPKIT L12pu /
Status of the Tracker Outer Barrel J. Incandela University of California Santa Barbara for the illustrious TOB Group Tracker General Meeting October 26,
1 UCSB Module Assembly Week of 4/11 – 4/15. 2 UCSB Parts Inventory 4/4/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu ST193 L12pd ST193.
1 CMS week 15/03/05, Module Production Meeting, Dean White - UCSB Status of Sensor Bias Connection Dean White For the US CMS Group.
1 Hybrid & Module Testing Status Week of 6/6-6/10.
1 UCSB Module Assembly Week of 5/9-5/13. 2 UCSB Parts Inventory 5/9/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd L12su
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
CMS Week – UCSB Gantry Status – June 8, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave Staszak.
Slide 1Susanne KyreDOE review, January 20, 2004 Wirebonding for TOB and TEC Susanne Kyre University of California, Santa Barbara.
Slide 1-OGP status & module reinforcementDOE review, January 20, 2004 Status of OGP & Module reinforcement Andrea Allen Development Technician DOE Review.
US Module Production June 2, 2005 J. Incandela For the US CMS Tracker Group.
1 UCSB Module Assembly Week of 5/2-5/6. 2 UCSB Parts Inventory 5/9/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd L12su
1 UCSB Module Assembly Week of 4/25 – 4/29. 2 UCSB Parts Inventory 5/2/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu ST193 L12pd ST193.
Status Brussels GANTRY Ê Overview of the pilot run (second week of October) 4 aims and achievements 4 accuracy on position and angles 4 residual features.
Status Brussels GANTRY Ê Recovered from the Gantry PC crash during Pilot Run R6 4 same situation as before the Pilot Run is achieved for R6 Ë Comparison.
Slide 1Susanne KyreTracker week, October 2005 TEC/TOB bias bonds Susanne Kyre University of California, Santa Barbara.
Brussels Module Production Ê We have producted 57 R6 modules and 26 R5N modules 4 of which 67 grade A and 9 grade B and 7 outside specifications Ë We have.
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
Lyon Gantry Status CERN 15 Sept D. Contardo Calibration Plates and Tools Readiness for production.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
Phase 2 Outer Tracker Module analysis
Status Brussels GANTRY
Hybrid & Module Testing Status
US Module Production Status
UCSB Testing Status Anthony Affolder
Vienna Module Production
FNAL Module Testing Status
UCSB Module Assembly Week of 11/28 – 12/2/05 Week of 11/28 – 12/2/2005.
FNAL Module Testing Status
UCSB Qualification Module Grading
Module Production in Brussels
OGP Surveying & DB Entry
Hybrid & Module Testing Status
FNAL LT Testing Status Modules – were tested during Aug 2 – Aug 9.
L.Fiore Gantry Meeting during the CMS TK week
Module Production in Brussels
Module Testing Status Week of 6/14-6/20.
UCSB Module Assembly Week of 12/5 – 12/9/05 Week of 12/5 – 12/9/2005.
Hybrid & Module Testing Status
Operations/Failure Analysis
FNAL Hybrid Testing Status
TOB Module Production Overview and Plan
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Wirebonding UCSB FNAL Machines
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Module Testing Status Week of 3/14-3/18.
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
FNAL Hybrid Testing Status
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
FNAL Hybrid Testing Status
FNAL Hybrid Testing Status
Presentation transcript:

1 UCSB Module Assembly Week of 5/16-5/20

2 UCSB Parts Inventory 5/23/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd L12su L12sd L34pu /60~1002 L56p ~1002 R5N103222pr248 pr080 R5S65022pr248 pr080 R pr0255 R pr0198

3 US Module Assembly Weekly Cumulative ABFABF% A or B L12pu % L12pd % L12su % L12sd % L34p % L56p % R5N % R5S % R % R % Total %

4 UCSB Module Assembly Problems Past Week –Minor problem with one glue dispenser. Will test and switch to back-up. Can then modify current one. –200 storage plates assembled. 200 more plates machined, but are waiting to see need before assembling. –Replaced one of out 2 curing pumps with a larger one. Will enable us to cure up to 10 plates at a time.

5 Wirebonding This Week –A few TOB modules require up to rebonds on the PA. Problem seems to come and go. –Bonding has kept up with module assembly.