Atlas standard opening ATLAS Project Document N°: ATL-HT-OP-0014 EDMS id. 983012 Created : January 13 th, 2009 Modified : Main document Overall view of.

Slides:



Advertisements
Similar presentations
Parts of I.C engine Cylinder Piston Connecting rod
Advertisements

Horticulture CD Unit C 6-3: Nursery, Landscaping, and Gardening.
ITS /MFT installation concept CERN 27 September 2012 Corrado Gargiulo.
1 Installation of Delphi Frame  ITS Installation.
EA meeting, Wednesday 6 Dec 2006 TT installation, Jeroen van Tilburg 1 TT installation Installation of the TT station.
Automated HIC assembly A. Di Mauro ITS-MFT mini-week
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
OSHA Most Frequently Cited Serious Violations
SQXF Shell & Yoke Assembly Procedure
TGC Big wheel Sector assembly plan Tatsuo Kawamoto ATLAS workshop 2005.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
TIB-TID insertion test into the CMS Tracker cylinder ________________________________________________________ Tracker week july 04
SailRail Automated Systems engineered solutions for material handling January 2010.
Horticulture CD Unit C 6-3: Nursery, Landscaping, and Gardening.
Notes After TIG 17/7/08 HF+ Move out of garage: Aug 15* Platform+table+collars+racks+BP support (jack up for platform) = 3 days Controls for motors = 1.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
ATLAS Muon System WBS 3.5 DoE/NSF M&O Evaluation Group Review BNL 19-Jan-06 Frank Taylor MIT V1.3.
1 Safety and Database Subsection ADO - PO - SA Safety achievement and future activitiesSafety achievement and future activities Database (see K. Pommes.
Technical Support Activities in PH-ADO-PO
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
ATLAS + NA62 DIRK MERGELKUHL. Dirk MERGELKUHL| SU pendant LS1 day| | EDMS | page 2 Quoi (quelles activités prévues pendant le LS1) The.
Michel RAYMOND – April 14 th, 2011 Technical Support Activities in PH-ADO-PO Goals for 2011.
Safety in the Machine Shop Session 1. Shop Tools and Techniques2.
ATLAS 1 Beam Pipe Support Structure (BPSS) Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman LBNL.
OPTIONAL The second lifting guide rail is ready for the secondary lifting trolley(optional part).
G.Barber Mice Tracker Integration Harbin Jan Mice Tracker Integration Installation requirements & Procedure.
SLHC Engineering Upgrade FCAL Remove-Install step by step procedure. Mircea Cadabeschi-University of Toronto March 01,
ATLAS closing scenario  Where we are  What is still be done before closing (ADO-PO support)  Closing scenario / Procedure / Schedule Prepared by Michel.
Michel RAYMOND – July 1 st, 2013 Technical Support Activities in PH-ADO-PO Summary of 2013 activities.
17/03/01 PDR ATLAS Alignment, Olivier Cloué1 ATLAS ALIGNMENT (BARREL) : Installation at CERN (1) zEstimated dates : (Web planning) y11/2004 -> Start of.
ATLAS Pixel Detector July 2003 Insertion Device Costs A. Smith, LBNL 1 Insertion Device Costs Overview US Pixel Meeting July 9, 2003.
DCal Insertion Tooling 24/02/ DCal Insertion Tooling DCal Insertion System feature following main components 1. One rotator : cylindric welded structure.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
Project Office Activities R. Vuillermet 08/09/2015R. Vuillermet PH-ADO-PO1.
17 th November 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 – November 17 th 2006 Michele Battistin (TS/CV/DC) TS/CV Detector Cooling On call and.
Auto Mechanics Tools Piston Ring Compressor.
ICARUS Collaboration Meeting Dec A. Scaramelli.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
Status on closing operations End cap calorimeter side A Forthcoming operations ATLAS – April 17th, 2009 Prepared by Michel RAYMOND.
Michel RAYMOND – December 7 th, 2012 Technical Support Activities in PH-ADO-PO Statement of 2012 activities Schedule & Organization on LS1.
PMT installation meeting at CIEMAT Enrique Calvo Alamillo Chooz 3 March 2009.
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
Procedures.
Preparation for Running Outline Present Schedule Detector Preparation Requests for dedicated runs –Cosmics, Splashes, Alignment Muon Shifts Experts A.
Atlas status report. LHC Cooldown Status LHC is proceeding with the cooldown and the hardware commissioning L.Evans is asking the experiments to close.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
3 rd ESAC Review, 27 th February to 1 st March 2013, CEA Saclay Fresca2 Dipole Structure Assembly J.C Perez on behalf of Fresca2 collaboration team.
Kitakami Side AHCAL Assembly or anywhere in any detector.
22/09/2011 ADO-PO section meeting ADO : Atlas Detector Operation PO : Project Office R. Vuillermet.
Intro to Material Handling
Miscellaneous MEC Topics Mainz, CM September 2016, MEC Session J
Automotive Engines Theory and Servicing
Miscellaneous Topics MEC Session, CM March 2017 at GSI J. Lühning, GSI
Standard Work Instruction: MHE Pre-Trip
ADO-PO section meeting. ADO : Atlas Detector Operation
PANDA Yoke of the Magnet
Essem Engineers Beyond the limits…
CMS Area Working Group Meeting
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
Technical Support Activities in EP-ADO-PO
OSHA Most Frequently Cited Serious Violations
REAR SUSPENSION AND SERVICE
Initial BIS installation
Technical Support Activities in PH-ADO-PO
Installation plans from mid 2005
Adjusting Tilt and Turn Inswing Door or Window
Automotive Engines Theory and Servicing
SC1R Cold Box PDR Assembly Sequence
Presentation transcript:

Atlas standard opening ATLAS Project Document N°: ATL-HT-OP-0014 EDMS id Created : January 13 th, 2009 Modified : Main document Overall view of the opening sequence List of procedures to be applied at each step Prepared by : Michel RAYMOND Checked by :Approved by :

ATL-HT-OP-0014EDMS id : Atlas standard opening : Main documentPage / 10 Side ASide CSide ASide C Run configuration In run, the components dedicated to the movement of the detectors are stored at surface. The first operation, as soon as shaft C is opened, is to lower these equipments and to connect them. The heavy trucks are compressed and used to support JFS shielding. The light trucks are at surface, ready to be lowered and used as support structure for the Toroid end caps. 2

ATL-HT-OP-0014EDMS id : Atlas standard opening : Main documentPage / 10 Side ASide CSide ASide C Step 1 : shielding removing Day 1 Lifting of Top JFS – side A Lifting of Top JFS – side C Connection of Movement system Side A Day 2 Day 3 X-movement of JFS - A Lifting of JFS - AConnection of Movement system Side C Day 4 Lifting of JF table - A Lifting of compressed truck - A 3

ATL-HT-OP-0014EDMS id : Atlas standard opening : Main documentPage / 10 Side ASide CSide ASide C Step 1 : shielding removing (2) Day 5 BW-A opening & tilting Rails re-arrangement Trench A Rotation of traction cylinders Mounting of JF table (A) Day 6 Lowering of compressed truck – AX-movement of JFS - C Lowering of JF table - ALifting of JFS - C Day 7 Truck A connectionLifting of JF table - C X-movement of truck ALifting of compressed truck - C 4

ATL-HT-OP-0014EDMS id : Atlas standard opening : Main documentPage / 10 Side ASide C Side A Step 1 : shielding removing (3) Day 8 JFC2 & JFC3 to surface (A)BW-C opening & tilting Rails in trench C Rotation of traction cylinders JFC1 platform installation (A) Mounting of JF table (C) Day 9 X-movement of truck & JFC1 (A) Lowering of compressed truck (C) Lowering of JF table - C Day 10 Lifting of JFC1 (A)Truck C connection Lifting of JF table (A)X-movement of truck C 5

ATL-HT-OP-0014EDMS id : Atlas standard opening : Main documentPage / 10 Side ASide C Side A Step 1 : shielding removing (4) Day 11 JFC2 & JFC3 to surface (C) JFC1 platform installation (C)Lifting of compressed truck (A) Day 12 X-movement of truck & JFC1 (C) Removing of A-frame (A) Light truck lowering (A) Day 13 Lifting of JFC1 (C)Light truck positioning (A) Lifting of JF table + truck (C) Movement system connection (A) Day 14 Removing of A-frame (C)Lowering of folding bridges Light truck lowering (C)ECT-A opening 6

ATL-HT-OP-0014EDMS id : Atlas standard opening : Main documentPage / 10 Side ASide C Step 2 : Barrel opening - A side Day 15 Light truck positioning (C)Release of JD locking devices (A) Lowering of Round scaffolding (A) JD-A connection Day 16 JD-A opening Day 17 EB-A connection Movement system connection EB-A opening Day 18 Installation of folding bridges ECT-C openingRound scaffolding installation Side C Side A 7

ATL-HT-OP-0014EDMS id : Atlas standard opening : Main documentPage / 10 Side ASide C Step 3 : Barrel opening - C side Day 19 Release of JD locking devices (C) Round scaffolding installation (A) Lowering of folding bridges JD-C connection Lowering of Round scaffolding (C) Day 20 JD-C opening Day 21 EB-C connection EB-C opening Installation of EB-A or JD-A access Day 22 Installation of folding bridges (C) Round scaffolding installation (C) Side C Side A 8

ATL-HT-OP-0014EDMS id : Atlas standard opening : Main documentPage / 10 Step 4 : Access completion Day 23 Round scaffolding installation (C) Day 24 Installation of EB-C or JD-C access Day 25 Side ASide C Side A 9

ATL-HT-OP-0014EDMS id : Atlas standard opening : Main documentPage / 10 List of procedures List of tooling for shielding removingATL-HT-OP-0010, EDMS Id JFS3 Removing using compressed truckATL-HT-OP-0009, EDMS Id BW movementATL-HT-OP-0012, EDMS Id JFC2 & JFC3 removingATL-HT-OP-0009, EDMS Id JFC1 removing using compressed truckATL-HT-OP-0009, EDMS Id Truck lowering and connectionATL-HT-OP-0011, EDMS Id TE movementATL-HT-OP-0011, EDMS Id JD/SW movementATL-HT-OP-0011, EDMS Id AE movementATL-HT-OP-0011, EDMS Id PPSPS for ATLAS opening operationATL-HT-EY-0003, EDMS Id PPSPS for Shielding removingATC-TY-EY-0116, EDMS Id PPSPS for Big Wheels movementATC-TY-EY-0115, EDMS Id