Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.

Slides:



Advertisements
Similar presentations
Fairfax County Board of Supervisors Transportation Sub-Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert.
Advertisements

Capital Beltway HOT Lanes Project Project Update April 2009.
Jon Chiglo, PE Project Director 2014 Construction Plans.
Grade Separation (GS-16) Project. Project Location - Bensenville N.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
State Project No /195 Rehabilitation of Bridge Nos and I-84 over Marion Ave Southington, Connecticut Rehabilitation of Bridge Nos.
Titusville to Edgewater Bike Loop PD&E Study
Herndon Station - North Pavilion Construction Town of Herndon – Town Council August 6, 2014.
1 Loop 303 US 60 to Happy Valley Parkway Arizona Department of Transportation February 26, 2014.
Welcome Learn more about upcoming construction activities on Cedarvale Avenue and Oak Park Avenue View display boards and speak one-on-one with staff Building.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
6 th Street Water Main And Street Reconstruction 2013.
City of Bloomfield Hills 2015 Road Improvement Program.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
2014 Roadway Rehabilitation Project Neighborhood Pre-construction Meeting Monday, June 9, :00 p.m. Currell Boulevard Tamarack Road.
Riverside County Transportation Commission 91 Project Update California Transportation Commission December 10, 2014.
ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &
Crane Bridge Design STJ Engineering Matt Albert AJ Chandler Noah Fehrenbacher Jake Gennicks Jake Wilhoit Rose-Hulman Institute of Technology.
Montwood Street & Drainage Improvement Project Solicitation No November 26, 2012.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
PWC Quarterly Transportation Report DATA Roundtable June 17, 2015 Rick Canizales – Chief Department of Transportation.
Monroe County Transportation Projects 4 Local Agencies: Unincorporated Monroe County City of Key West City of Marathon Village of Islamorada District Six.
Nick Johnson, PE Senior Project Manager October 1, 2012.
Current Construction Projects Major Projects Pinellas County.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
MD 97 (Georgia Avenue) at Randolph Road Purpose Improve vehicular, bicyclists and pedestrian safety Improve Levels of Service Increase capacity Improve.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Project Update: Airport Freeway, I-820 and I-35W Townhall Meeting for State Representatives Stephanie Klick and Jonathan Stickland Monday, May 12.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
PUBLIC INPUT SESSION OCTOBER 27, 2015 City of Asbury Sun Valley Dr. and Sun Ridge Ct. Reconstruction Project.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
Campus Plan Roosevelt Island campus > Laboratory of innovation > Open and inviting to the public > Sustainable and energy-efficient.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project March 12, 2002 Contractor Outreach.
U.S. ROUTE 202 – SECTION 300 IMPROVEMENT PROJECT East Whiteland Township – Tredyffrin Township Chester County TMACC Information Session January 24, 2011.
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
Girvin Road Improvements (Atlantic Blvd. to Wonderwood Dr.) Public Information Meeting March 3, 2016.
I-75 Ramp Widening Project Scope of Project – Safety Project to Widen I-75 NB Exit Ramp (Ramp A) and I-75 SB Exit Ramp (Ramp C) at the I-75/US 25W Interchange.
PUBLIC IMPROVEMENT HEARING 2015 Street, Utility and Retaining Wall Improvements - Grandview Boulevard November 12, 2014 (continued to December 9, 2014)
I-225 Rail Line Chuck Culig, Project Manager Tuesday, April 2, 2013 RTD Board of Directors Update.
2009 Sales Tax Extension Project Status Update. 2 Background Sales Tax was extended via August 26, 2008 referendum. Sales Tax was extended for an additional.
Transportation Report
PORT OF TACOMA Lincoln Avenue Grade Separation Lincoln Avenue Improvements Project Update.
GEORGE WASHINGTON HIGHWAY WIDENING PROJECT E.V. WILLIAMS, INC.
Reconstruction of Beach Drive Reconstruction of Beach Drive National Park Service U.S. Department of the Interior Rock Creek Park National Park Service.
Construction Department Meeting CURRENT STATUS – SEPTEMBER 2016
Bond Oversight Committee
Four Winds Condominium Association August 2, 2017
Lynnhaven Parkway Widening Project Update
Sully District Council of Citizens Associations January 25, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation.
Interstate 15 North Phase 4 Cost Estimates 09/03/2015
Col. Pike Multimodal: About the Project
DICKINSON AVENUE RECONSTRUCTION
The Oakton Condominium Association September 12, 2017
I-66 Outside the Beltway Design Public Hearing Meetings November 13, 14 & Susan Shaw, P.E., Megaprojects Director Virginia Department of.
IA 122 RECONSTRUCTION PRE-BID MEETING
I-84 Waterbury Project Project Overview July 2017.
US26: Cornelius Pass Rd -185th Ave
Highway 169 Bridge Replacement & Pavement Resurfacing
SW Gage Blvd - Street Repair Project
Quarterly Transportation Report 4th Quarter 2011 October 11, 2011
Contract 60X10 Informational Meeting Weber I-55
West Hills Road Projects Update
Walker Street Reconstruction Project 25% Design Public Hearing
PROJECT 3004(18) NORTH CARPENTER ROAD MAJOR RECONSTRUCTION
Presentation transcript:

Route 50 Widening Design/Build Project

2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties The Project Team

3 Objectives  Provide an Overview of the Project  Discuss the Current Project Schedule and Upcoming Milestone Dates  Describe Current & Completed Construction Activities  Answer Your Questions

4 Major Design Features  Ultimate Six Lane Roadway  Signals at Tall Cedars Pkwy, Both Pleasant Valley Rds, Stonecroft Blvd, Avion Pkwy and Lee Rd  Paved 10’ Wide Shared Use Path on North and South Sides  New Bridges Over Cub Run  Complete Reconstruction of All Pavement

5 Construction Sequence Stages 1, 2 & 3 Construction Sequence Stages 1, 2 & 3 Stonecroft Blvd to Lee Road. Complete.

6 Construction Sequence Stages 4 & 5 Construction Sequence Stages 4 & 5 Poland Road to PV Road Fairfax. Stonecroft Blvd to PV Road Fairfax.

7 May 2011Kick-Off to Design/Build Fall 2011Complete Design, Obtain Permits September 2011Begin Construction Dec End 2012Right-of-way Acquisitions Summer PresentUtility Relocations November 2015Construction Complete Project Schedule

8 June 2014Complete WB (2 Lanes) from Stonecroft Blvd to PV Road Fairfax July 2014Complete EB (2 Lanes) at Tall Cedars Parkway August 2014 Complete EB (3 rd Lane) from Poland Road to Stonecroft Blvd September 2014Complete EB (2 Lanes) from Lee Road to Stonecroft Blvd December 2014Complete WB (3 rd Lane) from Stonecroft Blvd to Poland Road December 2014Complete Permanent Signals at Poland Road, Tall Cedars Parkway, PV Road Loudoun & Fairfax Upcoming Milestones

9 December 2014Complete & Open WB (2 Lanes) from Lee Road to Stonecroft Blvd December 2014Complete & Open Spur Ramp to Lee Road from Route 28 South May 2015Complete & Open WB (3 rd Lane) from Lee Road to Stonecroft Blvd (Three Lanes Open in Both Directions Throughout Project) June 2015Complete Permanent Signals at Stonecroft Blvd, Avion Parkway and Lee Road October 2015Complete Trails, Surface Paving, Permanent Signage, Permanent Striping & Permanent Seeding) November 2015Complete Punchlist Upcoming Milestones

10  Right-of-way Acquisitions (75 Properties)  Utility Relocations (Electric)  Dominion Virginia Power  Overhead – 12,800 feet & 78 poles  Underground – 3,700 feet Completed Project Activities

11  Utility Relocations (Communications)  Verizon Northern Virginia  Overhead –9,200 feet Fiber  Cox Communications  Overhead – 17,000 feet Fiber  Comcast Communications  Overhead – 500 feet Fiber  MCI / Zayo Communications  Underground – 9,600 feet Fiber  Verizon South  Underground - 7,800 feet Fiber & Copper  Overhead – 8,700 feet Fiber Completed Project Activities

12  Utility Relocations (Gas)  Washington Gas  1,500 feet 12” Steel  2,000 feet 6” Plastic  Columbia Gas  400 feet 6” Plastic Completed Project Activities

13  Utility Relocations (Self Performed)  Loudoun Water  5,800 feet 36” Watermain  Fairfax Water  2,200 feet 12” Watermain  900 feet 36” Watermain  8,400 feet 24” Watermain Completed Project Activities

14  Utility Relocations (Self Performed)  Fairfax Sanitary Sewer  200 feet 36” Sewer Main  900 feet 6” Lateral Relocation Completed Project Activities

15  Demolition  120,000 SY Asphalt Demolished (4,000 Truck Loads)  11,000 feet Curb & Gutter Demolished  5,000 feet Guardrail Removed Completed Project Activities

16  Roadway Barrier  120,000 feet Set & Relocated (22 Miles, 1200 Truck Loads) Completed Project Activities

17  Temporary Pavement  70,000 SY Roadway Grading  30,000 Tons Roadway Stone Placed (1500 Truck Loads)  39,000 Tons Asphalt Placed (1950 Truck Loads) Completed Project Activities

18  Earthwork  200,000 Cubic Yards of Dirt Moved (25,000 Truck Loads)  4 Stormwater Management Ponds Installed Completed Project Activities

19  Storm Drainage  23,000 feet Storm Pipe Installed (4 miles)  220 Storm Structures Installed Completed Project Activities

20  Permanent Roadway  32,000 Tons Roadway Stone Placed (1600 Truck Loads)  15,500 feet Underdrain Installed  15,000 feet Curb & Gutter Installed  75,000 Tons Asphalt Placed (3750 Truck Loads) Completed Project Activities

21  Box Culverts  485 feet Reinforced Double Barrel Box Culvert  1,000 CY Concrete Placed (100 Truck Loads)  175,000 LBs Rebar Installed Completed Project Activities

22  Retaining Walls  640 feet Concrete Retaining Wall  400 CY Concrete Placed (40 Truck Loads) Completed Project Activities

23  Cub Run Bridge (Eastbound & Westbound)  1,200 feet Piling Installed (112 Piles)  600 CY Concrete Placed (Substructures)  14 Concrete Girders Installed  960 CY Concrete Placed (Deck Superstructures)  400 feet Parapets, Railing & Fence Installed Completed Project Activities

Public Communication of Upcoming Traffic Changes 24  VDOT to Send Public Notifications for Major Shifts  Notices will be provided to Supervisors / Delegates  Notices will be distributed to distribution list  Fire, Rescue, and schools notified  Variable Message Boards will be placed one week in advance

25 _widening.asp (this webpage will be updated throughout the project development) Or Google: “Route 50 Widening” Questions and Answers For More Information About Route 50 Widening Project: