SR 1 BLUFFTON Public Hearing September 25, 2012. INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.

Similar presentations


Presentation on theme: "SR 1 BLUFFTON Public Hearing September 25, 2012. INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing."— Presentation transcript:

1 SR 1 BLUFFTON Public Hearing September 25, 2012

2 INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing safety, mobility and economic growth INDOT Values: Respect Teamwork Accountability Excellence INDOT

3 6 district offices 3,722 employees $396 million/annual operating budget $1 billion/annual capital expenditures 28,410 total lane miles 5,098 lane miles of interstate 16,519 lane miles of two-lane roads 5,320 INDOT-owned bridges INDOT Profile

4 Hearing Agenda  Welcome  Presentations  Public Statement for the Record  Adjourn

5 Comments For The Record  Verbally as a Public Statement  Comment Form  Mail or Fax  Email Please feel free to use any and all methods. Comment period ending October 10, 2012.

6 Project History Environmental Document released for public involvement on December 6, 2011 Scope of Environmental Study:  Evaluate impacts to natural and human environments  Social and economic factors  Waterways, wetlands, and endangered species  Historical properties

7 Project History continued  Legal Notice of Public Hearing  The News Banner  September 10 th & 17 th, 2012  Community Input  One of the final steps of the Environmental process

8 Real Estate Acquisition Process http://www.fhwa.dot.gov/realestate /realprop/index.html http://www.fhwa.dot.gov/realestate /rights/index.html

9 Real Estate Acquisition Process  “Uniform Act” of 1970  All federal, state, and local governments must comply – just compensation  Acquisition Process  Appraisals  Review appraisals  Amount of compensation cannot be less than fair market value  Offer will be made in writing  No agreement  Mediation  Condemnation

10 Project Need Numerous commercial property access points and high traffic volumes Lack of access control and turning lanes impedes traffic operations Poor surface drainage patterns

11 SR 1 classified as a principal arterial roadway SR 116 classified as a minor arterial roadway One travel lane in each direction, limited turn lanes and passing blisters Speed limit: 40 mph, decreases to 30 at the south edge of the Wells County 4-H Park Existing SR 1 south of Spring St.

12 Asphalt travel lanes 12 ft wide Paved shoulders 3 ft to 6 ft wide Last resurfaced in 2003 Land use is commercial and light industrial with agricultural at the south end

13 Existing SR 1 Conditions Currently in fair condition Ruts and cracks beginning to show in the wheel paths Tight turn radii at SR 116 and other intersections Few access points south of 4-H Park North of 4-H Park almost completely paved with few defined driveways

14 Existing SR 1 Conditions (cont’d) Poorly defined drainage system Roadside ditches show signs of standing water Existing discharge points have inadequate capacity for new runoff

15  Incidental Construction (Blue)  Widening and Resurface (Green)  Cul-de-sac for Scott Street (Red) N SR 1 Construction AreasN State St. SR 116 (Harrison Plaza) Harvest Rd. 4-H Park Rd. Harvest Rd. Spring St. Scott St. Delong Ditch

16 12’-0” 2’-7” 14’-0” 12’-0” 2’-7” SR 1 Proposed Typical Section One 12’-wide Lane Each Direction 14’-wide Continuous Two-Way Left-Turn Lane New Concrete Curb and Gutter Widening with Overlay of Existing Pavement Proposed SR 1

17 Permanent Right-of-Way (Orange) Typical Width – 80’ (40’ each side) Maximum Width – 113’ 5.88 Acres Temporary Right-of-Way (Green) 0.52 Acre SR 1 Proposed Right-of-WayN South Half State St. Harvest Rd. SR 116

18 Permanent Right-of-Way (Orange) One commercial relocation (Pink) Temporary Right-of-Way (Green) SR 1 Proposed Right-of-WayN North Half 4-H Park Rd. Spring St. Scott St. 4-H Park Rd. Spring St. Scott St.

19  Phase 1  One travel lane in each direction  Lanes shifted to west and narrowed to 10’  Widening and storm sewers constructed on east half  Access will be maintained to all properties  Construction zone speed limit 30 mph Maintenance of Traffic (MOT)

20  Phase 2  One 11’ travel lane in each direction  Lanes shifted east to new widening  Widening and storm sewers constructed on west half  Access will be maintained to all properties  Construction zone speed limit 30 mph Maintenance of Traffic (MOT)

21 Public Comments  Indiana Department of Transportation Public Hearings Office, Room N642 100 North Senate Avenue Indianapolis, IN 46204  E-mail: mwright@indot.in.govmwright@indot.in.gov  INDOT respectfully requests comments postmarked by October 10, 2012 All comments will be reviewed and evaluated and given full consideration during the decision-making process


Download ppt "SR 1 BLUFFTON Public Hearing September 25, 2012. INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing."