I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project.

Similar presentations


Presentation on theme: "I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project."— Presentation transcript:

1 I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project

2 I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project Jeff Lerud, Project Manager APWA

3

4 Construction Schedule

5 Concept 1 Pavement reconstruction from Keystone Ave. to 4 th St. Keystone Ave. 4 th St.

6 Existing Pavement Conditions

7

8 Concept 2 and 3 Concept 2: Install transportation technology ~ Intelligent Transportation System (ITS) project-wide. Concept 3: Update and replace highway signs and striping project-wide.

9 Existing Sign Conditions

10 Concept 4 and 5 Concept 4 Restripe I-80 EB to I- 580 SB on-ramp. Concept 5 Widen Virginia St. WB off-ramp (to two lanes).

11 Widen E. McCarran Blvd. EB off-ramp Concept 6

12 Storm Drain System Improvements at Robb Drive EB on-ramp to I-80 Concept 7

13 Concept 8 Sparks Blvd. NB to WB I-80 Loop Ramp EB to NB triple lefts

14 Concept 8 C&G

15

16 Concept 9 Auxiliary lanes from E. McCarran Blvd to Vista Blvd.

17 Concept 10 Widen Rock Blvd. EB off-ramp

18 Concept 11 Widen Robb Dr. WB off-ramp

19 keeprenosparksmoving.com  Traffic alerts  Customize your Commute  Live cameras  Alternate routes  Construction info  Photos  Events

20 ITS Devices  Closed-caption televisions (CCTV)  Speed detectors  Dynamic Message Signs (DMS)  Travel Time Signs  Expanded Highway Advisory Radio (HAR). Intelligent Transportation System (ITS) Benefits  Improved trip reliability  Quicker incident response times to incidents  Real-time traffic updates

21 Project Challenges  Ramp metering  Traffic switch  Fast timeline for paving  Sub grade  Equipment  Weather  Sewer  Ramp closures  Coordination

22 All design will be complete by December this year. Concept 1: Pavement reconstruction from Keystone Ave. to Fourth St. Construction of I-80 WB will be complete this year Concept 2: Workzone ITS is complete Concept 3: Signing and Striping: WB will be installed this year Concept 4: Re-stripe I-80 EB to I-580 SB ramp. Will be constructed in 2012. Concept 5: Widen Virginia St WB off-ramp. Will be constructed in 2012. Concept 6: Widen E. McCarran Blvd. EB off-ramp. Will be constructed in 2012. Project Status

23 Concept 7: Storm Drain at Robb Dr. Will be complete this year. Concept 8: Sparks Blvd. loop ramp improvements. Sewer improvements and fill will be complete this year. Concept 9: Auxiliary lanes from E. McCarran to Vista Blvd. Construction will be complete this year. Open Grade? Concept 10: Widen Rock Blvd. EB off-ramp. Concept 11: Widen Robb Dr. WB off-ramp. Construction will be complete this year Landscape and Aesthetics: Will be partially complete this year. Project Status

24 July 2011

25 August 2011

26 September 2011

27

28

29 Night Time Paving

30

31 September 2011

32 EB Overview from Ralston

33 Balloon Races

34 Complete I-80 westbound concrete and open to traffic this construction season Open long-term ramp closures: WB Wells Ave. and 4 th St. Concept 7: Robb Dr. drainage improvements Sparks Blvd. loop ramp preparation Construction of auxiliary lanes East McCarran Blvd. to Vista Blvd. I-80 EB paving in 2012 Upcoming

35 Questions? Thank you! Jeff Lerud, Project Manager 775-888-7569 jlerud@dot.state.nv.us