1 I-84 Waterbury Project Project Overview July 2017

2 I-84 Waterbury Project Team
Lochner AECOM AI Engineers, Inc. Comprehensive Environmental, Inc. Louis Berger I-84 Constructors, J. V.

3 Project Overview 8 Highway Bridges One Pedestrian Bridge 7 Culverts
(4 Over Watercourses) One Pedestrian Bridge (Over the Mad River) 7 Culverts 20 Retaining Walls Replacing/Upgrading Traffic Signals New Highway Illumination, Signs and Pavement Markings Replacing/Relocating Sanitary Sewer, Potable Water and Other Utilities

4 Project Description 2.7 Miles of Highway Reconstruction to Provide a Continuous Third Lane from Washington Street to Pierpont Road Washington Street Pierpont Road Hamilton Ave. Interchange East Main St. Harpers Ferry Rd. Plank Rd. Click – realignment of highway in the vicinity of Harpers Ferry Road to remove existing sharp ‘S’ curve Click – interchange ramp configuration Click – State and local road reconstruction Click – relocation of Mad River and Beaver Pond Brook Plank Rd. East Scott Rd. Hamilton Ave. Scott Rd. Interchange Realignment of I-84 Harpers Ferry Rd. Interchange Reidville Dr.

5 Project Description 2.7 Miles of Highway Reconstruction to Provide a Continuous Third Lane Including Realignment of I-84 to Remove Existing “S” Curve Washington Street Pierpont Road Hamilton Ave. Interchange Click – realignment of highway in the vicinity of Harpers Ferry Road to remove existing sharp ‘S’ curve Click – interchange ramp configuration Click – State and local road reconstruction Click – relocation of Mad River and Beaver Pond Brook Original Alignment of I-84 Realignment of I-84 Scott Rd. Interchange Harpers Ferry Rd. Interchange

6 Project Description Relocation of Mad River and Beaver Pond Brook
Washington Street Pierpont Road Hamilton Ave. Interchange East Main St. Click – realignment of highway in the vicinity of Harpers Ferry Road to remove existing sharp ‘S’ curve Click – interchange ramp configuration Click – State and local road reconstruction Click – relocation of Mad River and Beaver Pond Brook Beaver Pond Brook Hamilton Ave. Scott Rd. Interchange Mad River Harpers Ferry Rd. Interchange Reidville Dr.

7 Project Description Interchange Ramp Configuration Washington Street
Pierpont Road Hamilton Ave. Interchange Harpers Ferry Rd. Click – realignment of highway in the vicinity of Harpers Ferry Road to remove existing sharp ‘S’ curve Click – interchange ramp configuration Click – State and local road reconstruction Click – relocation of Mad River and Beaver Pond Brook Scott Rd. Hamilton Ave. Scott Rd. Interchange Harpers Ferry Rd. Interchange

8 Project Description State and Local Road Reconstruction
Washington Street Pierpont Road East Main St. Harpers Ferry Rd. Plank Rd. Click – realignment of highway in the vicinity of Harpers Ferry Road to remove existing sharp ‘S’ curve Click – interchange ramp configuration Click – State and local road reconstruction Click – relocation of Mad River and Beaver Pond Brook Plank Road East Hamilton Ave. Scott Rd. Reidville Dr.

9 Realigning I-84 Existing “S” Curve Future EB 25 Off Ramp
Bridges – Blue boxes are links to each bridge To return to this slide after viewing a bridge click on the Bridges box below the H button in the top right Future I-84 Alignment

10 8 New Highway Bridges Bridge 1228 Scott Road over I-84 Bridge 6591
New EB 25 On Ramp Bridge 5774 Future I-84 over Mad River eastern crossing Bridge 1226 Harpers Ferry Rd. over I-84 Bridge 6284 EB 25 Off Ramp over Mad River Bridge 1224 I-84 over Mad River western crossing Bridges – Blue boxes are links to each bridge To return to this slide after viewing a bridge click on the Bridges box below the H button in the top right Bridge 6590 New WB 25 On Ramp Bridge 04321 Hamilton Ave. over I-84

11 1 New Pedestrian Bridge Bridge 1228 Scott Road over I-84 Bridge 6591
New EB 25 On Ramp Bridge 5774 Future I-84 over Mad River eastern crossing Bridge 1226 Harpers Ferry Rd. over I-84 Bridge 6284 EB 25 Off Ramp over Mad River Bridge 1224 I-84 over Mad River western crossing Pedestrian Bridge Over Mad River Bridges – Blue boxes are links to each bridge To return to this slide after viewing a bridge click on the Bridges box below the H button in the top right Bridge 6590 New WB 25 On Ramp Bridge 04321 Hamilton Ave. over I-84