Copar Corporation CTC Wrap Arm Calibration Procedure Office: 708-496-1859 Fax: 708-496-0079.

Slides:



Advertisements
Similar presentations
University of Alaska Anchorage, Project Management Department
Advertisements

How to use the NEC projector Its easy! Really!. How to use the NEC projector IMPORTANT-make sure you have reserved the equipment (projector and/or laptop).
Copar Corporation 5744 W. 77 th St. Burbank Il Wet-End Training Glue Gap Calibration Procedure Meter Roll Gap.
STUDENT INFORMATION SYSTEM (SIS) Course Approval Procedure.
 Replace the text in all the text boxes and enter your own information.  To do this, triple- click on the existing text and simply start typing.  Do.
Microsoft Excel. Click on “Start,” then “Microsoft Office Excel.”
( 1 ) PROCEDURE FOR FLAT HEAT PRESS OPERATION PROCEDURE FOR MULTI FUNCTION HEAT PRESS MACHINE.
Enter your personal details select the Prepaid customer radio button and click on the submit button.
Haptic Signals for Communication under Workload In a primarily visual task, haptic signals can be more resistant to large cognitive workloads than visual.
Control Panel Overview Key pad: A Qwerty Keypad, used to enter an address. Programmable Features: The programmable features allow you to program.
Creating a UAA VPN Connection For Your Computer To Facilitate Polycom PVX – For Windows XP Last Modified On 10/25/2010 University of Alaska Anchorage,
2. Run. Hours button 1. Run. Hours screen Running hours.
CAREERSOURCE GC BOARD AND CENTER SETUP FOR USE WITH IPHONE, IPAD, AND SELECT IPODS.
The Energy Conservatory
6 th Annual Focus Users’ Conference 6 th Annual Focus Users’ Conference Elementary Scheduling Presented by: Sara Sayasane Presented by: Sara Sayasane.
New Offline Password After initial login to the system, the offline version in located by clicking on the red Emergency button.
New Features Jan 2014.
Instructions on how to access your voice mail messages with Microsoft Outlook Express 6 Primary advantage: You will have a permanent.wav file on your PC.
PLEASE DO NOT TOUCH THE MICROSCOPES AT YOUR DESKS!!!
HCare access on an iPad hCare access is the remote access to PGH. The steps for installing vary from the Mac somewhat. This will guide you. Installation.
Information guide.
2012 Creating and Submitting a Crash Report using ReportBeam.
STEP 1: Determining the exact image width STEP 1: Determining the exact image width Position of X-ray Filter Position of X-ray Filter STEP 5: Crop Extra.
You will find applications that are installed on the computer. Go to Start – Programs (depending on view Start – All Programs). All applications installed.
New Log In Procedures for Students Using City Schools Computers.
Advising Notes in DegreeWorks A Guide for Faculty Advisers.
CAD3D Project. SketchUp - Project Create a new SketchUp project called InitialsXX where the XX are your first and last initial. Use the Rectangle tool.
Open the Goodyear Homepage Click on Teacher Tools.
New Log In Procedures for Students Using City Schools Computers.
How to use the scanner This process will teach you how to use the scanner Press yellow button to turn power on In the top left corner tap “start”
1 Idaho Secretary of State Election Night Reporting.
Excel 2007 Instructor: Jan Fisher. Can you Answer these Questions about Excel 1.What is a workbook/worksheet? 2.What is a basic unit of the worksheet?
Annual Census of Students Who are Legally Blind Selecting Your Designee.
1.Access the following website: Click the above link and you will taken directly to the scheduling webpag.
Graphing Calculator Steps Steps to follow to find the vertex of a parabola & to find the zeros of a parabola. Make sure you view this in presentation mode.
Mimio Notebook How to use a mimio Notebook in the classroom.
 Boxplot  TI-83/84 Calculator  5 number summary  Do you have an outlier  Modified Boxplot.
Quadcopter Setup. 1. Fully charge batteries on Quadcopter, Remote Control and WiFi extender.
Skype For Business Quick Setup Guide. From your classroom computer locate the Skype application… Start Button  All Programs  Microsoft Office 2013 
DS200 PROCEDURES SPEAKER TOUCH SCREEN DISPLAY
Using Basic Formulas and Functions Lesson 8A. Formulas tab.
VPN Instructions INFORMATION TECHNOLOGY DIVISION CHICAGO STATE UNIVERSITY 9501 S. KING DR. ADM 101 CHICAGO, IL (773)
This is an introduction to configuring Microsoft Outlook for Office 2010: Forwarding FAMIS work order opening and closing s to other users or alternate.
AutoDidge Digitizing scanned well log images. Autodidge AUTODIDGE is a program that allows you to digitize scanned well log images to capture curve data.
3E Online General User Training Guide
Student iPad Configurations
Enter the term here. To do this, triple-click on this existing text and simply start typing. Do not press the delete key! Enter the term here. To do this,
Open a BLANK WORD document
How to setup Mozilla Thunderbird
CallSprout Communicator Guide
RB Controls Clocking in and out follow ups inner office messages
Uninstalling Google App Sync
QA: Siemens Sentinelle
Warm Up Convert to degrees a) 3
Start at our website at In the upper right hand corner is a link for “Office 365”
Adjusting Tilt and Turn Inswing Door or Window
Start at our website at In the upper right hand corner is a link for “Office 365”
Assignment 1 Creating a Heart.
Press login Icon to log into Qualcomm unit.
Skype For Business Quick Setup Guide.
Figure A Figure B 12/07/2006 Rev B
Otasuke GP-EX! Chapter 2 Run State Screen.
Page Counter Printing Instructions for printing the monthly counter readings from your Ricoh device. Click your mouse or press your “Down Arrow” key (if.
Duke FlexBake5™ Proof & Bake Oven
PowerPoint Now, I will explain about power point.
KEYPAD INSTRUCTIONS.
Lesson 6: Epic DAR Creating a Private Report
Point of Rental Training
Presentation transcript:

Copar Corporation CTC Wrap Arm Calibration Procedure Office: Fax:

To enter the Setup Configuration Screen press the Wrench within the RED box.

Enter the password of the day, or maintenance password, press Enter.

Go to the screens upper left, Press Setup, then select “Wrap Arm Controls”

This is the calibration Screen, This procedure is for the “Multi-Stack Preheaters” I will delete the Single-facer information to simplify this procedure.

Please note DB0 is the bottom preheater (DF Liner), DB1 is the preheater just above and so on. DB3 is required for triple wall plants. DB0 2 nd is the additional preheater or secondary preheater for the DF Liner paper.

Please center the wrap arm and the potentiometer. Caution the potentiometer is a 10 turn device, rotating the device beyond these limits will cause damage. Reversing the pulleys will allow additional rotations of the adjusting shaft.

Calibrating the DF Liner wrap arm position in CTC system. Preheater in RED. Move the wrap arm (Over wrapped) to it’s most minimum wrap position. Look at the Actual Count value, enter this value in the lower limit for DB0 but add 100 counts. Actual = = 268.

Next, move the wrap arm (Over wrapped) to it’s most maximum wrap position. Look at the Actual Count value, enter this value in the Upper limit for DB0 but subtract 100 counts. Actual = = Caution, the upper limit counts MUST be greater then the lower counts. If not the + - MOVE buttons will turn BLACK on the operator’s screens.

Last, Press Send Config. Follow same procedure for all DB1, 2, 3 and DB0 2 nd. Always press Send Config when finished. Never press Close.

Copar Corporation Please Call with any questions ask for the service department. PH FAX