Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,

Slides:



Advertisements
Similar presentations
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Advertisements

Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status 27 May Sam Burke UCSB HEP Group.
Slide 1L3 Testing Meeting March 7, 2003UCSB Status-Anthony Affolder UCSB Testing Status Anthony Affolder (for the UCSB module testing group) Current testing.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 4 August 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 25 August 2003 Sam Burke UCSB HEP Group.
1 Beam test at DESY Date: 01/12 – 19/12 Place: DESY, Testbeam area 24 Time schedule and more information available:
Slide 1 Anthony Affolder US Module LT meeting June 17, 2004 UCSB Module LT Testing.
1 Long Term Module Testing-Anthony AffolderTPO, December 11, 2003 Current Module LT Testing Capability Only Vienna Boxes Available  10 slots at each site.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 3 November 2003 Sam Burke Lance Simms.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 30 June Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 13 October 2003 Sam Burke Lance Simms.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
Slide 1UCSB Rod Production presented by Jim LambDOE review, January 20, 2004 UCSB Rod Production UCSB Rod Production, Jan , presented by Jim Lamb.
Anthony AffolderUS CMS Meeting 12/3/2002Proposal of UCSB Short-term Testing Program Assumptions Electrical and optical hybrids not burnt-in prior to arrival.
CMS Tracker Week – Module Test Meeting – July 2003 – Patrick Gartung 1 Long term rod testing software Patrick Gartung University of California, Riverside.
Slide 1 Anthony Affolder US Silicon Meeting, March 9, 2004 Equipment Status ARCS equipment status à Single module and 4 hybrid DAQ equipment status à Vienna.
1 US Testing Status-Anthony AffolderModule Testing Meeting, Dec. 11, 2003 Update of US Testing Status Anthony Affolder On behalf of the US testing group.
Slide 1Rod Production presented by Jim Lamb (UCSB)April 9, 2004 Rod Production Rod Production, April , presented by Jim Lamb (UCSB)
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status 20 May Sam Burke UCSB HEP Group.
US CMS Silicon Electronics Testing – CMS Lehman Review - May 21, Affolder1 US CMS Silicon Electronics Testing US CMS Lehman Review BNL 5/21/03 A.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 7 July 2003 Sam Burke UCSB HEP Group.
CMS Tracker Week – Module Test Meeting – April 2003 – Patrick Gartung 1 Status of US long term module testing Patrick Gartung University of California,
Anthony AffolderUS CMS Meeting 12/3/02DAQ Based Systems LV/HV Needs DAQ Power Supply Needs HV à 600 V/~1mA range –0.1-1  A Current Sensing –Over Voltage/Current.
DCS planning for ITS/SDD Vojtech Petracek Jiri Kral CTU Prague DCS workshop CERN.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status Sam Burke UCSB HEP Group.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
21-Jan-2009CSC - ESSC Jan'091 Report on CSC for ESSC Prepared for CSC by Fred Borcherding FNAL.
DESY TestBeam preparation CERN ) Michele Bianco, Marcin Drozdwa Byszewski, Givi Sekhniaidze, Joerg Wotshack.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
Electronics Status New DCM daughter card works. –Three cards has been assembled. –One daughter card has been send to Jamie yesterday by FedEx overnight.
INSIDE in-beam PET system assembly and test at INFN Torino
LKr status R. Fantechi.
HF Test station at P5 A.Mestvirishvili.
Mini-drawers, FE-ASIC , Integrator
EMU Slice Test Run Plan a working document.
Electrical and electronic systems projects
ROD assembly and test in US
DAQ Equipment Status 2 fully equipped Vienna boxes at UCSB and FNAL
On behalf of the US TOB testing group
UCSB Testing Status Anthony Affolder
Update of US Testing Status
UCSB Testing Status Anthony Affolder
UCSB Short-term Testing Plan
Results from module testing
UCSB Testing Status Anthony Affolder
Hardware Needs (Near Term)
On behalf of the US TOB testing group
First Assembled Rod in US
US Testing Update Anthony Affolder (On behalf of the US testing group)
UCSB Short-term Testing Plan
Operations/Failure Analysis
Hybrid & Module Electrical Testing
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
Electrical Testing at UCSB: Hybrids & Modules
US Module Testing Progress Report
Current Module LT Testing Capability
Operations/Failure Analysis
Current Module LT Capability
Operations/Failure Analysis
US Module Testing Progress Report
Operations/Failure Analysis
US Rod Burn-in Readiness DAQ Hardware/Power Supplies
Equipment Status ARCS equipment status DAQ equipment status
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
Presentation transcript:

Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves, xml file generation, configuration files After M800 production, hybrid thermal cycler needed at UCSB (with the necessary ARCS components) External interlocks, PS, etc. very homebrew and will take significant effort of Sam Burke to complete Mechanical structure begun in machine shop FNAL will need full ARCS capabilities at similar time Components from Aachen 3 ARC clamshells in queue in machine shop

Hardware needs (DAQ) Assume for near term that FED-MUX software lacking, so maximum of 4 modules can be tested in Vienna box Due to FED-MUX software problems, rod assembly stands will initially need 2 FED each

Hardware needs (4 slot burn-in) Power LV distribution ready (both PS and crate) HV system just integrated LT software CAEN A1303  CAEN A128 HS  CAEN A332 Electrometers at both sites Needs to make LIMO-to-DI/O cable adapter PC boards 4 PCI + 1 ISA + ethernet +1 com port UCSB has computer, not sure about FNAL All DAQ PC boards in hand All stand-alone boards in hand except for hybrid-to-vutri version D 3 in-hand (also needed for ARCS); Expect delivery of ~10 in 2-3 weeks

Hardware needs (4 slot burn-in) cont Cold box infrastructure 2 Vienna cold boxes in hand Final modifications for leak tightness and interlock underway Only 1 of 2 Torino interlock boxes available Schedule for second set not clear Both sites have necessary external chillers Set of 10 cold box plates for both sites in UCSB machine shop See Patrick Gartung’s talk at tracker week for details

Hardware needs (Rod Assembly) Rod assembly hardware in less stable situation Many assembly jigs/tools in very preliminary stages Rod assembly rotation table, rod handling tool and all other tools should be shipped with a rod to UCSB soon Testing electronics for rods in similar situation Power LV power supplies from CERN late Expect in 2-3 months Need to order CAEN HV PC controllers (A1303) for both sites Need 2 Electrometers per site to measure HV current accurately VERY difficult to get

Hardware needs (Rod Assembly) PC boards Now need 5 PCI slot + 1 ISA slot +ethernet + COM port + LV DI/O card (if necessary) Neither site has such a computer 1 TSC 2 FED 2 OEC (SS4 rods only) 2 DI/O cards

Hardware needs (Rod Assembly) To get first site read-out rods need the following hardware 1 LV PS 1 A1303 CAEN controller 1 PC (5 PCI + 1 ISA + ethernet + 1 com + LV DI/O (maybe)) 2 Electrometers 1 DI/O card 1 OEC LV PS, A1303, PC, and electrometers all may be long lead time items.