21-Jan-2009CSC - ESSC Jan'091 Report on CSC for ESSC Prepared for CSC by Fred Borcherding FNAL.

Similar presentations


Presentation on theme: "21-Jan-2009CSC - ESSC Jan'091 Report on CSC for ESSC Prepared for CSC by Fred Borcherding FNAL."— Presentation transcript:

1 21-Jan-2009CSC - ESSC Jan'091 Report on CSC for ESSC Prepared for CSC by Fred Borcherding FNAL

2 21-Jan-2009CSC - ESSC Jan'092 CSC Electronics Status Conducted a Work Shop at Rice U in Houston January 8 th through 11 th –Description: –What problems were encountered during running? Of those, what have been fixed What the plans to fix the remaining problems What resources, (people, material, time) are needed to resolve the problems –What improvements should we make (as distinct from fixing problems) What are the plans? What resources are needed to make the improvement? –Maintenance Estimate For each module, how many do we have? How many spares do we have? Where are the spares? What level of engineering effort is needed to maintain the element? –Indico Link > http://indico.cern.ch/conferenceDisplay.py?confId=48204

3 21-Jan-2009CSC - ESSC Jan'093 From CSC Q4’08 Report Short Term detailed Milestones and deliverables. Resolve issues with the operation and control of the Maraton power supplies Identify and fix outstanding Canbus issues Finalize optimal power-on and power-off sequences. Replace faulty resistors in HV system Investigate losses of communication between HV system and PVSS Reduce rate of CRC errors in DAQ system Develop a loopback test between the TMB and ALCT to allow the testing of the skew-clear cables between the chambers and peripheral crates. Further analyze the loss of programming of EPROMs Identify and correct problems with alignment system picomotor control

4 21-Jan-2009CSC - ESSC Jan'094 LV Resolve issues with the operation and control of the Maraton power supplies –OPFC Failure of ON/OFF switch –Quick disconnect in input power circuit fails –With CMS working with Wiener on a fix Failure upon power on – Soft Start Issues –Turning on too soon after power off greatly increases possibility of failure –Administrative controls have been put into place –Hardware change begun Lack of remote monitoring and control –With CMS working on modification to add remote Identify and fix outstanding CANBus issues –CANBus for Maraton system Expect new server from Wiener Work to analyze CANBus lines to find and fix any deficiencies Start now, intensify when LV back on, work until resolved –CANBus for PCMB system > remote ON/OFF at pcrates > uses ELMB’s Work to analyze CANBus lines to find and fix any deficiencies Work with ELMB experts to resolve further issues Start now and work until resolved

5 21-Jan-2009CSC - ESSC Jan'095 LV cont. Finalize optimal power-on and power-off sequences. –Observe several issues that have been reduced by a more complex power-on sequence –To proceed further we need to combine slow control of CANBus devices and VME devices –Work will start with availability of cooling and CMS LV in cavern –Work will take about 1 month –Can operate with present power-on procedure while working on enhancements

6 21-Jan-2009CSC - ESSC Jan'096 HV Replace faulty resistors in HV system –Work started at ISR –Work will take ~2 technicians ~2 months –Working serially > most of CSC can have HV ON during work Investigate losses of communication between HV system and PVSS –HV computers located in S1A10 …

7 21-Jan-2009CSC - ESSC Jan'097 FE Reduce rate of CRC errors in DAQ system –Rare but disruptive of Global DAQ Develop a loopback test between the TMB and ALCT to allow the testing of the skew-clear cables between the chambers and peripheral crates. –Present methods are not effective in timing in a small percentage of chamber electronics –Developing a more rigorous testing procedure to bring the lost communication rate down Further analyze the loss of programming of EPROMs in on-chamber electronics boards –Believed to be partially caused by power-on sequence > see previous slide –Have isolated problem boards for investigation on the bench –Have instituted work around to automatically identify problem situations and rapidly respond with operator intervention

8 21-Jan-2009CSC - ESSC Jan'098 CSC Electronics Inventory Following slides list status of electronics inventory for the CSC –For the record …

9 21-Jan-2009CSC - ESSC Jan'099 On-Chamber Boards CSC On-chamber Electronics Boards installed /total /spares CFE30520306050001xxxxxCFEB one type, 5(4) per chamber 2268 /2532 /137 ALC30520112030288xxxxxALCT288 ME1_1,ME1_3144 /?? /~10 ALC30520112030384xxxxxALCT384 ME1_2, ME234_2216/?? /11 ALC30520112030672xxxxxALCT672 ME2_1, ME3_1, ME4_1108 /130 /9 ALM30520112130001xxxxxALCT_MEZ one type, 1 per chamber468 / /20 LVD30521222040001xxxxxLVDB one type, 1 per chamber468 /?? /?? LVM30521222130001xxxxxLVMB one type, 1 per chamber468 /?? /?? AFE30520106050001xxxxxAFEB one type, many per chamber10,152 /11,616 /1054 NOTE: Have ~18 spare chambers, each with full complement of on-chamber boards

10 21-Jan-2009CSC - ESSC Jan'0910 LV & PCRATE CSC LV Power Supplies > Wiener Maraton System, Air Cooled installed /total /spares PFCB LVPS 72500xxxx OPFC Bin (Crate) 6 /8 /2 PFCM LVPS 71960xxxx OPFC Module 36 /40 /4 MARS LVPS 72920xxxx Maraton Supply 36 /40 /4 MARC LVPS 72960xxxx Maraton Crate 36 /38 /2 Peripheral Crate, pcrate, Components installed /total /spares EMUPC PC 305216030320050xxxx pcrate crate75 /60 /15 CBP PC 305203021620050xxxx pcrate back plane 70 /60 /10 CRB PC 305203180220050xxxx pcrate regulator brd88 /60 /28 PCM PC 305216031320060xxxx PCMB 79 /60 /19 ELM PC 305205121320050xxxx ELMB on PCMB 79 /60 /19 Pcrate boards installed /total /spares VCC PC 305222030320050xxxx Crate Controller 73 /60 /15 CCB PC 305203030220050xxxx Clock and Control84 /60 /24 DMB PC 305204130220040xxxx DAQ Mother Brd. 550 /468 /82 MPC TriggerPC 305213160320050xxxx Muon Port Card70 /60 /10 TMB TriggerPC 305220130220050xxxx Trig Mother Brd. 570 /468 /102 RAT TriggerPC 305218012020050xxxx RPC ALCT Trns. 690 /468 /222

11 21-Jan-2009CSC - ESSC Jan'0911 CSC HV HV ME1/1> CAEN System installed /total /spares CcHV13052##Crate2 /2 /0 CcHV13052##Board16 /18 /2 HV> UF Custom System installed /total /spares HVUF Custom Systeminstalled /total /spares HDS30520804192005xxxxxDistribution-36126 /157 /31 HDL30520804122005xxxxxDistribution-30144 /179 /36 HDC30520804032005xxxxxDistrib Crate30 /34 /4 HDP30520804162005xxxxxDistrib Patch8 /9 /1 HMB30520813022005xxxxxMaster board40 /50 /10 HMC30520813032005xxxxxMaster Crate8 /10 /2 HPS30520816192005xxxxxPrimary HV src8 /10 /2 HCC30520803032005xxxxxControl comp2 /3 /1 HLV30520812222005xxxxxLV power supply2 /3 /1 HMP30520813162005xxxxxMaster Patch2 /5 /3 HLP30520812162005xxxxxLV patch panel2 /4 /2 HCP30520803162005xxxxxControl patch2 /4 /2 HPC30520816032005xxxxxPrimary HVPS ctr8 /8 /2 (spare parts)

12 21-Jan-2009CSC - ESSC Jan'0912 CSC Track Finder CSC TF installed /total /spares CCCTrigger TF 3052000000200500000 9U CAEN VME 1 /3 /1 0Trigger TF 3052200603200500000 wiener crate ( trigger) 1 /2 /1 0Trigger TF 3052200602200500000 TF backplane 1 /3 /2 DDUTrigger TF 3052 200500000 DDU 1 /2 /1 DDETrigger TF 3052040405200500000 DDU extender 1 /3 /1 TSPTrigger TF 3052201916200500016 SP 12/17 /2 CCBTrigger TF 3052030302200500025 CCB 1 /3 /1 0 Trigger TF 3052000000200500005 muon sorter 1 /5 /3 0TriggerTF 3052202002200500006 CSC-DT transition board12/ 18/ 5 NOTE: Covered under Trigger as well

13 21-Jan-2009CSC - ESSC Jan'0913 CSC FED FED Crates> Wiener 9U VME installed /total /spares FED FED 3052060504200510000 FED Crate 4 /4 /0 (1 sp PS) FED Boards> OSU Custom Brds installed /total /spares CVC FED 3052032203200510000 CAEN 6U CC 4 /5 /1 –One sent to CAEN for repair, good spare is loan from pool DCC FED 3052040303200510006 Clock and Control 4 /6 /2 –2 more to be shipped to CERN DDU FED 3052040421200510032 Data Board 36 /?? /?? Pcrate Network > GBit installed /total /spares GNS GIG 3052071419200510001 GBit Ethernet switch 8 /10 /2 (1 sp installed)