Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 Beam test at DESY Date: 01/12 – 19/12 Place: DESY, Testbeam area 24 Time schedule and more information available:

Similar presentations


Presentation on theme: "1 Beam test at DESY Date: 01/12 – 19/12 Place: DESY, Testbeam area 24 Time schedule and more information available:"— Presentation transcript:

1 1 Beam test at DESY Date: 01/12 – 19/12 Place: DESY, Testbeam area 24 Time schedule and more information available: http://desyntwww.desy.de/~testbeam

2 2 Test beam area 24 movable table fixture for scintillators magnet (not used) Good conditions in test beam area - plenty of space - no problem with usage of gas -comfortable counting room

3 3 Detectors and services 4 Warsaw modules are shipped from Nikhef to Heidelberg this week. Mechanical support and gas system can be provided by Heidelberg. Most effort still necessary for electronics (see next slides).  available manpower is limited!

4 4 Necessary Equipment (Hardware) 4 front end boxes  missing 1 distribution box (including I²C)  missing TTC-system : TTCvi + TTCvx  available 1 OrxCard + 12 LVDS Adapter  available 2 Stratix Boards + Adapter  available

5 5 Necessary Equipment (Hardware) Power supplies :  missing ± 5V / 50A 2.5V / 5A 3.3V /10A 3 PCs  available 2 Scintillator + Nim crate  available Cooling  missing (Peltier element + CPU cooler )

6 6 Necessary Equipment (Software) Stratix board code for 6 links  available in Dortmund?? Readout software for the  available Stratix Board via PCI-Bus DAQ monitoring  missing I²C control  available TTC control  available

7 7 Many components available, but system test is mandatory!


Download ppt "1 Beam test at DESY Date: 01/12 – 19/12 Place: DESY, Testbeam area 24 Time schedule and more information available:"

Similar presentations


Ads by Google