16.09.2002Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.

Similar presentations


Presentation on theme: "16.09.2002Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard."— Presentation transcript:

1 16.09.2002Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard DCS solutions and integrating them in the TPC community 1-st version of the cooling prototype(IROC) was assembled in april 2001, in 161-R024 had as main features the cooling mechanical structure very similar to the final version control loop was consisting in monitoring the temperature and controlling the input current for heater.

2 16.09.2002Alice DCS workshop S.Popescu 2 PUMP On/Off Frigo Heater2 Heater1 1) IROC circuit 2) Frame circuit 1) 2) 3) 3) FEC circuit IROC Thyr2Thyr1 Wago  PLC + I/O modules T5 T6 PC Windows2000 WAGO I/O 32 V 2.1 OPC Schneider V2.2.1 PVSS client 2.12 Operational Panel 1 st ver. Ethernet T1T2 T4 T3 System set-up

3 16.09.2002Alice DCS workshop S.Popescu 3 Control panel for 1 test set-up

4 16.09.2002Alice DCS workshop S.Popescu 4

5 16.09.2002Alice DCS workshop S.Popescu 5

6 16.09.2002Alice DCS workshop S.Popescu 6

7 16.09.2002Alice DCS workshop S.Popescu 7 In progress : Step 1 qualification of Wago  PLC (in thermolab) consisting in: -test of system stability -test of system load (maximum nr. PID loops) -test of time response with a maximum load Step 2 studies of other possible solutions : ELMB (the Atlas Embedded Local Monitoring Board) The same type of tests will be performed in the next weeks PT1000 adaptators, software + connection to sensors finished and working properly

8 16.09.2002Alice DCS workshop S.Popescu 8 Near future: Step 3 Qualification of new electronics board (FEC), aim  control of LV full cable length Wiener PL500 + Slic.OPC + Control Panel September  161-R024 Implications on control side: - test of archiving, alarms and database handling Step 4 Test of cooling for IROC + electronics (45 FEC) October  TPC laboratory Step 5 Test for a complete control for 1 IROC: cooling, LV Wiener PS, FEC, HV Iseg PS news : Iseg OPC sever exist and is working good