SP Main FPGA & DT transition card design status

Slides:



Advertisements
Similar presentations
MICE Electronics Update Mice Target Workshop – Dec 2010 P J Smith James Leaver.
Advertisements

Endcap Muon meeting: Florida, January 9-10, 2004 J. Hauser UCLA 1 TMB, RAT, and ALCT Status Report Jay Hauser University of California Los Angeles ALCT/Mezzanine.
Jay Hauser, Emu meeting at Florida, 9 January CSC Trigger Meeting Summary Cast of many.
Uli Schäfer JEM Status and plans Firmware Hardware status JEM1 Plans.
US CMS DOE/NSF Review: June 2002, Darin Acosta, University of Florida1 Muon Track-Finder Trigger Darin Acosta University of Florida June, 2002.
7 th March 2007M. Noy. Imperial College London CALICE MAPS DAQ Project Summary.
CHEP March, B. Scurlock, University of Florida1 D. Acosta, V. Golovtsov, M. Kan, A. Madorsky, B. Scurlock, H. Stoeck, L. Uvarov, S.M. Wang University.
CMS ME CSC HV system Alex Madorsky University of Florida.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
Sector Processor 2002 Development and Test Plans Darin Acosta.
Status of the CSC Track-Finder Darin Acosta University of Florida.
Alex Madorsky University of Florida/Physics Track Finder production readiness review, Rice, August 2004 Track Finder Crate, Backplane and Parts Alex Madorsky.
Glue Card Test Procedures Flavio Fontanelli, Pino Mini`, Mario Sannino.
CSC EMU Muon Sorter (MS) Status Plans M.Matveev Rice University August 27, 2004.
CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.
Global Trigger H. Bergauer, Ch. Deldicque, J. Erö, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H.
Upgrade of the CSC Endcap Muon Port Card Mikhail Matveev Rice University 1 November 2011.
CSC Endcap Muon Port Card and Muon Sorter Status Mikhail Matveev Rice University.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
UF –PNPI HV system status August 2008 Sergey Volkov Nikolai Bondar PNPI.
MTF7 hardware status Alex Madorsky for UF group. Muon Trigger structure rework A. Madorsky2 Endcap TF Overlap TFBarrel TF - Overlap TF is now.
SP04 Production Lev Uvarov RICE Muon Trigger Meeting August 27, 2004.
1 AFE IIt/VLSB Update Terry Hart, MICE Tracker Phone Conference September 5, 2007.
Monday December DESY1 GDCC news Franck GASTALDI.
CSC Muon Sorter M. Matveev Rice University January 7, 2003.
2001/02/16TGC off-detector PDR1 Sector Logic Status Report Design Prototype-(-1) Prototype-0 Schedule.
FEE Electronics progress Mezzanine layout progress FEE64 progress FEE64 initial testing Test mezzanine. A few of the remaining tasks 2nd October 2009.
M.Matveev Rice University March 20, 2002 EMU Muon Port Card Project.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
Julie Prast, Calice Electronics Meeting at LAL, June 2008 Status of the DHCAL DIF Detector InterFace Board Sébastien Cap, Julie Prast, Guillaume Vouters.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
M.N Minard Trigger Validation Board Tests and Implantation Cyril Drancourt, Pierre-Yves David,Victor Coco, Thomas Chouvion,M.N Minard - Production status.
Firmware development for the AM Board
ATLAS Pre-Production ROD Status SCT Version
Initial check-out of Pulsar prototypes
ProtoDUNE SP – Slow control Status
Current DCC Design LED Board
Update on CSC Endcap Muon Port Card
Erno DAVID, Tivadar KISS Wigner Research Center for Physics (HU)
Working plan for 2017 Acquisition and Control Electronics
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
Combined SR/SP UF Fits all of previous SP board logic! Main FPGA
University of California Los Angeles
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF
Status of the DHCAL DIF Detector InterFace Board
Muon Track-Finder Trigger
University of California, Los Angeles Endcap Muon Purdue
D.Cobas, G. Daniluk, M. Suminski
MicroTCA Common Platform For CMS Working Group
University of California Los Angeles
Hall A Compton Electron detector overview
AIDA (mini) Trigger/Timing Logic Unit (mini TLU)
PCI BASED READ-OUT RECEIVER CARD IN THE ALICE DAQ SYSTEM
University of California Los Angeles
University of California Los Angeles
CSC Trigger Update Specific issues:
ALCT, TMB Status, Peripheral Crate Layout, CSC Event Display
TMB, RAT, and ALCT Status Report
University of California Los Angeles
TMB and RAT Status Report
Track Finder Crate, Backplane and Parts
CSC Trigger Meeting Summary
INTRODUCTION TO COMPUTERS
VCC Hardware Production Status
RPC Electronics Overall system diagram Current status At detector
Sector Processor Status Report
CSC Muon Sorter Status Tests Plans M.Matveev August 21, 2003.
LIU BWS Firmware status
We are working on developing “cheap” RTD monitoring channels for the CMS Phase-2 requirements. The channels will provide the complete readout for 4-wire.
Presentation transcript:

SP Main FPGA & DT transition card design status Alex Madorsky UF 08/21/03

SP Main FPGA design status Mezzanine card with FPGA works Firmware downloading: Little troubles related to Xilinx ISE 5.2 software version Workaround available, Xilinx contacted Internal bus interface under design: Designed separately from main SP logic for faster compilaton Done so far: R/W access to one internal register Priorities for test with DT (will be finished in a few days): Read/write access to LUT memory Input FIFOs for DT data Other priorities Compile with full SP logic Test FIFOs for SP logic Test software for SP logic My talk is devoted to UF/PNPI design features and solutions for CMS EMU HV system. I will introduce to you the main design approaches and important technical details. The subjects for discussion will be: HV regulator Current sensor Fuse control operation Digital control interface New mechanical construction Rice, August 2003 Alex Madorsky

DT transition card DT transition card: DT-to-SP cables: Routing completed (V. Golovtsov) Board is sent for production, expected next week Components bought DT-to-SP cables: Connectors received Cable delivery delayed by manufacturer (Belden) till mid-September Rice, August 2003 Alex Madorsky