P b to RevCom: Conditional Approval Request

Slides:



Advertisements
Similar presentations
Title: Supporting report for request of conditional approval to forward P802.16h to RevCom Document Number: /0039 Date Submitted: July 16, 2009.
Advertisements

P802.16q to Sponsor Ballot: Conditional Approval Request 17 July 2014 IEEE Gdoc.
EC Closing Slides and Motions November 2009 Atlanta, GA.
Page 1Version 2.1 Request for conditional approval Information required to support request for conditional approval to forward a draft standard IEEE 802.
Doc.: Submission1 IEEE Motions in July Plenary DCN: Title: Request for Sponsor Ballot Approval for IEEE a.
Doc.: IEEE /0144r01 Submission February 2015 Apurva N. Mody, BAE SystemsSlide 1 IEEE Motion at the February EC Telecon IEEE P Wireless.
Doc.: IEEE /1187r0 Submission September 2015 Slide 1 IEEE ah Closing Report for September 2015 Date: Authors: Yongho Seok and.
Doc.: IEEE /0023r00 SubmissionApurva N. Mody, BAE SystemsSlide 1 IEEE Motion at the July EC Closing Meeting IEEE P Wireless RANs.
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
Month Year IEEE Motions in July, 2016 Plenary
Month Year IEEE Motions in July, 2017 Plenary
November 2008 doc.: IEEE /1437r1 July 2011
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
IEEE P Motions at the November 2011 Plenary EC Closing Meeting
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
IEEE P Motions at the November 2011 Plenary EC Closing Meeting
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
IEEE P Motions at the November 2011 Plenary EC Closing Meeting
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
802.11e Portland Report July 16, 2004 July 16, 2004
November 2010 doc.: IEEE /0872r3 November 2010
IEEE P Motions at the November 2011 Plenary EC Closing Meeting
IEEE P Motions at the July Plenary EC Meeting
John D’Ambrosia Recording Secretary, IEEE 802 LMSC
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aq Report to EC on approval to forward draft to RevCom
P802.11aq Report to EC on approval to forward draft to RevCom
P802.11v Report to EC on Conditional Approval to go to Sponsor Ballot
P802.16Rev4 to Sponsor Ballot: Conditional Approval Request
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
Task Group G Report March 10, 2003
IEEE Motions at the November Plenary EC Meeting
IEEE Motions in July Plenary DCN:
July Plenary Opening Report
IEEE Motion at the February EC Telecon
November 2010 doc.: IEEE /0872r4 November 2010
802.16m Opening (Final) Report
November Plenary Opening Report
Month Year IEEE Motions in July Plenary DCN:
2013 March Plenary Closing Report
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
Closing IEEE 802 EC Friday 15th March 2019
July Plenary Closing Report
IEEE Motion at the July EC Closing Meeting
Closing IEEE 802 EC Friday 15th March 2019
Closing IEEE 802 EC Friday 15th March 2019
IEEE Motion at the February EC Telecon
IEEE MEDIA INDEPENDENT HANDOVER
IEEE P Working Group for Wireless Personal Area Networks
November 2008 doc.: IEEE /1437r1 August 2010
Mar 2010 Closing Plenary Motions
M2M Task Group Closing Report (Session #78)
TGu Motions Authors: March 2010 Date: March 2010
M2M Task Group Closing Report (Session #80)
TGu Teleconference Motions
GRIDMAN Task Group Closing Report - Session #82
Motion – ae UnConditional Approval to RevCom
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
TGn Editor Report Sept 2008 Date: Authors:
Motion via Ballot IEEE motion Motion for Approval to Start the Sponsor Ballot for IEEE P Revision Draft 5.0 Motion via Ballot.
Motion via Ballot Motion for Approval to Start the Sponsor Ballot for IEEE P Revision Draft 5.0 Motion via Ballot Motion Start: May.
Task Group G Report January 17, 2003
IEEE MEDIA INDEPENDENT HANDOVER
November 2010 doc.: IEEE /0800r9 November 2011
November 11, 2010 Dallas, Tx Session #70
P802.11aq Report to EC on approval to forward draft to RevCom
P802.16Rev4 to Sponsor Ballot: Conditional Approval Request
Recording Secretary, IEEE 802 LMSC
Presentation transcript:

P802.16.1b to RevCom: Conditional Approval Request 16 March 2012 2012-03-16 IEEE 16-12-0263-00-Gdoc

Rules: OM (2010-07-16) Clause 14 motions requesting conditional approval to forward when the prior ballot has closed shall be accompanied by: • Date the ballot closed • Vote tally including Approve, Disapprove and Abstain votes • Comments that support the remaining disapprove votes and Working Group responses. • Schedule for recirculation ballot and resolution meeting. 2012-03-16 IEEE 16-12-0263-00-Gdoc

Date the ballot closed Stage Open Close WG Sponsor Ballot 10 Feb 11 Mar 2012 2012-03-16 IEEE 16-12-0263-00-Gdoc

Vote tally including Approve, Disapprove and Abstain votes 1 Disapprove with comment 0 Disapprove without comment 2 Abstain Return ratio requirement met (83%) 2012-03-16 IEEE 16-12-0263-00-Gdoc

Comments that support the remaining disapprove votes and Working Group responses See Following: 2012-03-16 IEEE 16-12-0263-00-Gdoc

2012-03-16 IEEE 16-12-0263-00-Gdoc

Schedule for recirculation ballot and resolution meeting Recirculation #1: 15 day, beginning approximately April 20, 2012 Comment Resolution meeting: May 14-17 (session #79) Confirmation Ballot: 15 day, beginning approximately June 01, 2012 2012-03-16 IEEE 16-12-0263-00-Gdoc

802.16 WG Motion 802.16 Closing Plenary: 2012-03-15 Motion: To request Conditional Approval from the IEEE 802 Executive Committee to forward the IEEE P802.16.1b Draft to RevCom Moved by Jaesun Cha Seconded: Tim Godfrey Result: 20 / 0 / 0 2012-03-16 IEEE 16-12-0263-00-Gdoc

LMSC Motion To grant conditional approval, per Clause 14 of the IEEE 802 Operations Manual, to forward P802.16.1b to RevCom Moved: Seconded: Approve: Disapprove: Abstain: 2012-03-16 IEEE 16-12-0263-00-Gdoc