Presentation is loading. Please wait.

Presentation is loading. Please wait.

P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot

Similar presentations


Presentation on theme: "P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot"— Presentation transcript:

1 P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
July 2009 doc.: IEEE /0715r5 July 2009 P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot Authors: Name Affiliation Address Phone Stephen McCann Research in Motion 200 Bath Road, Slough, Berks, SL1 3XE, UK Bruce Kraemer Marvell 5488 Marvell Lane, Santa Clara, CA 95054 +1 (321) Stephen McCann (RIM), Bruce Kraemer (Marvell) Stephen McCann (RIM), Bruce Kraemer (Marvell)

2 July 2009 doc.: IEEE /0715r5 July 2009 Introduction This document contains the report to the IEEE 802 Executive Committee in support of a request for conditional approval to send the IEEE P802.11u Draft to Sponsor Ballot. This document ( r5) was approved during the closing plenary session of the working group on 17 July 2009. Passed in the Task Group yes 14, no 1, abstain 0 Passed in the Working Group yes , no , abstain Stephen McCann (RIM), Bruce Kraemer (Marvell) Stephen McCann (RIM), Bruce Kraemer (Marvell)

3 802.11 WG Letter Ballot Results – P802.11u
July 2009 doc.: IEEE /0715r5 July 2009 WG Letter Ballot Results – P802.11u Ballot ID Ballot Close Date Title BallotType Pool Return %Rtn Abstain %Abs Approve Disapprove %Approve 132 12 July 2008 Technical Letter Ballot for IEEE u_D3.0 Technical 213 182 85.5 35 19.2 113 34 76.9 137 08 October 2008 Recirculation Letter Ballot for IEEE u_D4.0 Recirculation 189 88.7 37 19.6 118 77.6 142 20 February 2009 Recirculation Letter Ballot for IEEE u_D5.0 191 89.7 39 20.4 125 27 82.2 148 24 April 2009 Recirculation Letter Ballot for IEEE u_D6.0 192 90.1 18.2 15 90.4 152 19 June 2009 Recirculation Letter Ballot for IEEE u_D7.0 194 91.0 33 17.0 19 88.2 152.1 LB152 Post Ballot vote changes 146 90.7 Stephen McCann (RIM), Bruce Kraemer (Marvell) Stephen McCann (RIM), Bruce Kraemer (Marvell)

4 802.11 WG Letter Ballot Comments – P802.11u
July 2009 doc.: IEEE /0715r5 July 2009 WG Letter Ballot Comments – P802.11u Ballot ID Ballot Close Date Title Ballot Type Number of Comments received 132 12 July 2008 Technical Letter Ballot for TGu Draft 3.0 Technical 25 (25 T, 0 E) 137 8 Oct 2008 Recirculation Letter Ballot for TGu Draft 4.0 Recirculation 13 (13 T, 0 E) 142 20 Feb 2009 Second Recirculation Ballot for TGu Draft 5.0 5 (5 T, 0 E) 148 24 April 2009 Second Recirculation Ballot for TGu Draft 6.0 152 19 Jun 2009 Second Recirculation Ballot for TGu Draft 7.0 73 (44 T, 29 E) Stephen McCann (RIM), Bruce Kraemer (Marvell) Stephen McCann (RIM), Bruce Kraemer (Marvell)

5 Unsatisfied comments by commenter
July 2009 July 2009 doc.: IEEE /0715r5 doc.: IEEE /0715r6 July 2009 July 2009 Unsatisfied comments by commenter Voter1 LB132 LB137 LB142 LB148 LB152 Total Gabor Bajko 15 Clint Chaplin 1 20 21 Peter Ecclesine 4 Darwin Engwer 2 Tom Kolze 3 9 Alastair Malarky 8 Henry Ptasinski 17 10 31 Richard Roy 6 Dorothy Stanley Alexander Tolpin George Vlantis Qi Wang 25 13 5 73 121 Slide 5 Stephen McCann (RIM), Bruce Kraemer (Marvell) Stephen McCann (RIM), Bruce Kraemer (Marvell) Page 5 Stephen McCann (RIM), Bruce Kraemer (Marvell) Stephen McCann (RIM), Bruce Kraemer (Marvell)

6 Unsatisfied Comments – Topics
July 2009 doc.: IEEE /0715r5 July 2009 Unsatisfied Comments – Topics Topic #Comments Interworking 15 Generic Advertisement Service 44 Subscription Provider Interface Emergency Services 11 Editorial 28 Other 10 Total 121 Stephen McCann (RIM), Bruce Kraemer (Marvell) Stephen McCann (RIM), Bruce Kraemer (Marvell)

7 Unsatisfied comments July 2009
doc.: IEEE /0715r5 July 2009 Unsatisfied comments The composite of all unsatisfied comments and the resolutions approved by the comment resolution committee received during working group ballot may be found in the embedded document on the right: Double click on the icon to the right to open this. A copy of this same data presented using MyBallot access database report format is attached. Stephen McCann (RIM), Bruce Kraemer (Marvell) Stephen McCann (RIM), Bruce Kraemer (Marvell)

8 TGu Timeline Open Close Third recirculation (TGu draft 8.0) 26-Jul-09
July 2009 doc.: IEEE /0715r5 July 2009 TGu Timeline Open Close Third recirculation (TGu draft 8.0) 26-Jul-09 10-Aug-09 Clean recirculation (TGu draft 8.0) 28-Sep-09 13-Oct-09 Pool formation 15-Aug-09 29-Sep-09 First sponsor ballot 21-Oct-09 20-Nov-09 Second sponsor ballot 31-Jan-10 15-Feb-10 Third sponsor ballot 17-Mar-10 2-Apr-10 Fourth sponsor ballot 1-May-10 16-May-10 EC to RevCom Mar-10 (cond.) or Jul-10 RevCom to SB Sep-10 Stephen McCann (RIM), Bruce Kraemer (Marvell) Stephen McCann (RIM), Bruce Kraemer (Marvell)

9 July 2009 doc.: IEEE /0715r5 July 2009 EC Motion on Conditional Approval to send P802.11u to Sponsor Ballot Grant conditional approval, under Clause 13, to forward P802.11u to Sponsor Ballot. P802.11u currently has a 90% approval. Working Group 11 vote on the Motion Passed: <for> y, <against> n, <abstain> a Moved: <name> nd: <name> Yes No Abstain Stephen McCann (RIM), Bruce Kraemer (Marvell) Stephen McCann (RIM), Bruce Kraemer (Marvell)


Download ppt "P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot"

Similar presentations


Ads by Google