Presentation is loading. Please wait.

Presentation is loading. Please wait.

802.16m Opening (Final) Report

Similar presentations


Presentation on theme: "802.16m Opening (Final) Report"— Presentation transcript:

1 802.16m Opening (Final) Report
March 14, 2011 Singapore Session #72 IEEE m-11/0001

2 802.16m (Final) Report – Singapore
It’s Over!!! (we hope) IEEE m-11/0001

3 802.16m (Final) Report- Singapore
Since The Taipei session , two Sponsor Ballot recirculations were conducted:  Recirc #5 (27 Jan - 11 Feb) on P802.16m/D11 Recirc #5 resulted in no new Disapprove votes but had five disapprove comments (from a single voter). The Ballot Recirculation Committee decided that Recirc #6 was required.  Sponsor Ballot Recirc #6 on P802.16m/D12 Opened on 18 February; Closed on 2 March. No comments were received. No votes were changed to Disapprove. The WG Chair plans to ask the 802 EC for (unconditional) approval during this meeting. P802.16m approval is on the agenda for the RevCom meeting of 30 March. Special editorial meeting on Thursday AM!! IEEE m-10/0001


Download ppt "802.16m Opening (Final) Report"

Similar presentations


Ads by Google