Presentation is loading. Please wait.

Presentation is loading. Please wait.

P802.11v Report to EC on Conditional Approval to go to Sponsor Ballot

Similar presentations


Presentation on theme: "P802.11v Report to EC on Conditional Approval to go to Sponsor Ballot"— Presentation transcript:

1 P802.11v Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2009 P802.11v Report to EC on Conditional Approval to go to Sponsor Ballot Date: Authors: D. Stanley (Aruba), B.Kraemer (Marvell) Bruce Kraemer, Marvell

2 November 2008 doc.: IEEE /1437r1 July 2009 Introduction This document contains the report to the IEEE 802 Executive Committee in support of a request for conditional approval to send IEEE P802.11v to Sponsor Ballot. This document (11-09/0720r1) was approved during the closing plenary session of the working group on July 17, 2009. Passed in the Task Group <result> Passed in the Working Group <result> D. Stanley (Aruba), B.Kraemer (Marvell) Bruce Kraemer, Marvell

3 TGv draft text stability
November 2008 doc.: IEEE /1437r1 July 2009 TGv draft text stability 375 6.0 5.0 350 4.0 325 300 AP MIB added # pages 275 3.0 250 2.0 225 1.0 200 Jan-07 Jul-07 Jan-08 Jul-08 Jan-09 Jul-09 D. Stanley (Aruba), B.Kraemer (Marvell) Bruce Kraemer, Marvell

4 802.11 WG Letter Ballot Results – P802.11v
November 2008 doc.: IEEE /1437r1 July 2009 WG Letter Ballot Results – P802.11v Ballot ID Ballot Close Date Title Ballot Type Pool Return %Return Abstain % Abstain Approve Disapprove %Approve 140 19 Dec 2008 Technical Letter Ballot for Task Group-v Draft 4.0 Technical 254 225 88.58 40 17.78 149 36 80.54 146 4 Apr 2009 Recirculation Letter Ballot for Task Group-v Draft 5.0 Recirculation 228 89.76 41 17.98 155 32 82.88 150 12 Jun 2009 Second Recirculation Ballot for Task Group-v Draft 6.0 230 90.55 38 16.10 172 20 89.58 150.1 15Jul 09 Second Recirculation Ballot for Draft 6.0 Post ballot results 174 18 90.6 D. Stanley (Aruba), B.Kraemer (Marvell) Bruce Kraemer, Marvell

5 802.11 WG Letter Ballot Comments – P802.11v
November 2008 doc.: IEEE /1437r1 July 2009 WG Letter Ballot Comments – P802.11v Ballot ID Ballot Close Date Title Ballot Type Number of Comments received 140 19 Dec 2008 Technical Letter Ballot for Task Group-v Draft 4.0 Technical 586 (418T, 168E) 146 4 Apr 2009 Recirculation Letter Ballot for Task Group-v Draft 5.0 Recirculation 321 (225T, 96E) 150 12 Jun 2009 Second Recirculation Ballot for Task Group-v Draft 6.0 140 (93T, 47E) D. Stanley (Aruba), B.Kraemer (Marvell) Bruce Kraemer, Marvell

6 Unsatisfied comments by commenter
November 2008 doc.: IEEE /1437r1 July 2009 Unsatisfied comments by commenter Voter LB140 LB146 LB150 Total Joe Epstein 3 Lusheng Ji 1 David Bagby William Marshall 8 Henry Ptasinski 4 2 6 Robert Miller Mark Hamilton Harry Worstell Richard Roy Qi Wang Gabor Bajko Matthew Fischer Darwin Engwer Graham Smith 25 10 5 40 D. Stanley (Aruba), B.Kraemer (Marvell) Bruce Kraemer, Marvell

7 Unsatisfied Comments – Topics
November 2008 doc.: IEEE /1437r1 July 2009 Unsatisfied Comments – Topics Topic #Comments Diagnostics, Event, and STA Statistics 5 Directed Multicast and Flexible Multicast Service Location 8 Time Advertisement 1 Timing Measurement AP Collaboration 4 Patents Multiple BSSID 6 QOS Traffic Capability 2 Scope Optional/Mandatory Total 40 D. Stanley (Aruba), B.Kraemer (Marvell) Bruce Kraemer, Marvell

8 November 2008 doc.: IEEE /1437r1 July 2009 Unsatisfied comments The composite of all unsatisfied comments and the resolutions approved during working group ballot may be found in document: , a copy of this is attached. Double click on the icon to the right to open this. A copy of the unsatisfied comments presented using MyBallot access database report format is attached. D. Stanley (Aruba), B.Kraemer (Marvell) Bruce Kraemer, Marvell

9 TGv Timeline Third recirculation (TGv draft 7.0) Open 24-Jul-09 Close
November 2008 doc.: IEEE /1437r1 July 2009 TGv Timeline Third recirculation (TGv draft 7.0) Open 24-Jul-09 Close 8-Aug-09 Clean recirculation (TGv draft 7.0) 25-Sep-09 10-Oct-09 Pool formation 15-Aug-09 29-Sep-09 First sponsor ballot 19-Oct-09 18-Nov-09 Second sponsor ballot 3-Feb-10 18-Feb-10 Third sponsor ballot 30-Mar-10 15-Apr-10 Fourth sponsor ballot 15-May-10 30-May-10 EC to RevCom Mar-10 (cond.) or Jul-10 RevCom to SB Jun-10 or Sep-10 D. Stanley (Aruba), B.Kraemer (Marvell) Bruce Kraemer, Marvell

10 November 2008 doc.: IEEE /1437r1 July 2009 EC Motion – <agenda item#> Conditional Approval to send P802.11v to Sponsor Ballot Grant conditional approval, under Clause 13 to forward P802.11v to Sponsor Ballot. P802.11v had a 89.58% approval on the last WG Recirculation Ballot. Working Group 11 vote on the Motion Passed: <for> y, <against> n, <abstain> a Moved: Bruce Kraemer nd: <name> Yes No Abstain D. Stanley (Aruba), B.Kraemer (Marvell) Bruce Kraemer, Marvell


Download ppt "P802.11v Report to EC on Conditional Approval to go to Sponsor Ballot"

Similar presentations


Ads by Google