Presentation is loading. Please wait.

Presentation is loading. Please wait.

Month Year IEEE Motions in July Plenary DCN:

Similar presentations


Presentation on theme: "Month Year IEEE Motions in July Plenary DCN:"— Presentation transcript:

1 Month Year IEEE 802.21 Motions in July Plenary DCN: 21-14-0123-00-0000
doc.: IEEE Motions in July Plenary DCN: Title: Request for Sponsor Ballot Approval for IEEE d Date Submitted: July 18, 2014 Presented at EC Closing Plenary, July 2014 Authors or Source(s):  Subir Das, Applied Communication Sciences Abstract: This document contains WG Letter Ballots summary and motions for Sponsor Ballot approval John Doe, Some Company

2 Topic Request for EC Approval to forward the IEEE P802.21d for Sponsor Ballot Slide 2 Subir Das, Chair IEEE

3 IEEE P802.21d WG Ballot Result- Final Round
• Date the last ballot closed: July 5th, 2014 • Vote tally including Approve, Disapprove and Abstain votes: Ballot Pool = 21, Ballot Return= 19, Return ratio= 90.00% Number of Approves = 17 Number of Disapproves = 0 Number of Abstains = 02 Approval Ratio = 100% • Comments that support the remaining disapprove votes and Working Group responses – N/ A Subir Das, Chair, IEEE

4 IEEE P802.21d Draft History and Statistics
IEEE WG Letter Ballot Launch Date # of Comments Received Comment Resolution Status Return Ratio Approval Ratio Draft Status WG LB #7 (P802.21d Draft v1.0) May 31, 2013 2 55(113T / TR, 142E / ER) Comments were addressed and Resolved 71% <75% P802.21d Draft v2.0 Prepared WG LB #7a (P802.21d Draft v2.0) October 01, 2013 179(108 T / TR, 71E / ER) 76% P802.21d Draft v3.0 Prepared WG LB #7b (P802.21d Draft v3.0) February 14, 2014 100(69T / TR, 31 E / ER) 89% P802.21d Draft v4.0 Prepared WG LB#7c (P802.21d Draft 4.0) April 25, 2014 127(68 T / TR, 59E / ER) 90% 83.33% P802.21d Draft v5.0 WG LB#7d (P802.21d Draft 5.0) June 20, 2014 06(00T / TR 6 E / ER) No “must be satisfied” Comments 100% MEC Review available at: Slide 4 Subir Das, Chair, IEEE

5 Links to WG Letter Ballot Results Summary
WG LB #7: WG LB #7a: WG LB #7b: WG LB #7c: WG LB #7d: Slide 5 Subir Das, Chair, IEEE

6 Links to WG Letter Ballot Comments & Resolutions
WG LB #7: WG LB #7a: WG LB #7b: WG LB #7c: WG LB #7d: Slide 6 Subir Das, Chair, IEEE

7 Tentative Time-line for P802.21d Sponsor Ballot
The Sponsor Ballot will start on August 17, 2014 – Sponsor Ballot #1 Starts September 15, 2014 – Sponsor Ballot #1 Ends September 16, onwards – Address and Resolve Comments October – Sponsor Ballot recirculation November 2014 – Sponsor Ballot recirculation Slide 7 Subir Das, Chair, IEEE

8 P WG Motion Move to authorize the P WG Chair to make a motion to the IEEE 802 Executive Committee for approval to forward the IEEE d Draft for Sponsor Ballot and approve the CSD ( Move: Yoshihiro Ohba Second: Lily Chen For: 08 Against: 00 Abstain: 00 Motion Passes Slide 8 Subir Das, Chair, IEEE

9 Motion Motion: To forward IEEE P802.21d for Sponsor Ballot
Move: Subir Das Second: James P.K. Glib For: Against: Abstain: Motion Slide 9 Subir Das, Chair, IEEE


Download ppt "Month Year IEEE Motions in July Plenary DCN:"

Similar presentations


Ads by Google