Presentation is loading. Please wait.

Presentation is loading. Please wait.

M2M Task Group Closing Report (Session #80)

Similar presentations


Presentation on theme: "M2M Task Group Closing Report (Session #80)"— Presentation transcript:

1 M2M Task Group Closing Report (Session #80)
[IEEE Mentor Presentation Template (Rev. 0)] Document Number: IEEE Gdoc Date Submitted: Source: Jaesun Cha M2M TG Chair Re: M2M TG Closing Report for Session #80 Base Contribution: N/A Purpose: Administration Notice: This document does not represent the agreed views of the IEEE Working Group or any of its subgroups. It represents only the views of the participants listed in the “Source(s)” field above. It is offered as a basis for discussion. It is not binding on the contributor(s), who reserve(s) the right to add, amend or withdraw material contained herein. Copyright Policy: The contributor is familiar with the IEEE-SA Copyright Policy < Patent Policy: The contributor is familiar with the IEEE-SA Patent Policy and Procedures: < and < Further information is located at < and < >.

2 M2M Task Group Closing Report (Session #80)
Chair: Jaesun Cha (ETRI) IEEE Gdoc

3 Activities of the Week No M2M TG meeting during this week
Following Motions were approved at WG Opening Plenary Motions to approve comment resolutions on P802.16p and P b made during teleconference, and to initiate SB recirc on two drafts Motions to request Conditional Approval from the IEEE 802 EC to forward the IEEE P802.16p and the P b Draft to RevCom SB Recirculations for both M2M drafts were requested on 17 July

4 Output Documents IEEE 802.16-12-0446-01-Gdoc: Opening Report
IEEE Gdoc: Closing Report IEEE Gdoc: Report for Conditional Approval of P802.16p IEEE Gdoc: Report for Conditional Approval of P b


Download ppt "M2M Task Group Closing Report (Session #80)"

Similar presentations


Ads by Google