Presentation is loading. Please wait.

Presentation is loading. Please wait.

Month Year IEEE Motions in July, 2016 Plenary

Similar presentations


Presentation on theme: "Month Year IEEE Motions in July, 2016 Plenary"— Presentation transcript:

1 Month Year IEEE 802.21 Motions in July, 2016 Plenary
doc.: IEEE Motions in July, 2016 Plenary DCN: Title: Request for Sponsor Ballot Approval for IEEE P revision and IEEE P Date Submitted: July 29, 2016 Presented at EC Closing Plenary, July 2016 Authors or Source(s):  Subir Das, Applied Communication Sciences Abstract: This document contains WG Letter Ballots summary and motions for Sponsor Ballot approval and motion for sending the drafts to ISO/IEC JTC1 SC6 John Doe, Some Company

2 Topic Request for EC Approval to forward the IEEE P revision and IEEE P for Sponsor Ballot Slide 2 Subir Das, Chair IEEE

3 IEEE P802.21-revision WG Ballot Result- Final Round
• Date the last ballot closed: June 08, 2016 • Vote tally including Approve, Disapprove and Abstain votes: Ballot Pool = 22, Ballot Return= 20, Return ratio= 95.45% Number of Approves = 20 Number of Disapproves = 00 Number of Abstains = 01 Did Not Vote = 01 Approval Ratio = 100% • Comments that support the remaining disapprove votes and Working Group responses – N/ A Subir Das, Chair, IEEE

4 IEEE P802.21-revision Draft History and Statistics
IEEE WG Letter Ballot Launch Date # of Comments Received Comment Resolution Status Return Ratio Approval Ratio Draft Status WG LB #8 (P802.21™/D01 Prepared) December 15, 2015 185(88 T / TR, 97 E / ER) Comments were addressed and Resolved 100% <75% P802.21™/D02 Prepared WG LB #10 (P802.21™/D02 Prepared) March 31, 2016 30(7 T / TR, 23 E / ER) 94.45% 95% P802.21™/D03 Prepared WG LB #10a (P802.21™/D03 Prepared) May 24, 2016 0(0 T / TR, 0 E / ER) No Comments P802.21™/D04 Prepared MEC Review available at: Slide 4 Subir Das, Chair, IEEE

5 Links to WG Letter Ballot Results Summary for IEEE P802.21-revision
WG LB #8: WG LB #10: WG LB #10a: Slide 5 Subir Das, Chair, IEEE

6 Links to WG Letter Ballot Comments & Resolutions for IEEE P802
Links to WG Letter Ballot Comments & Resolutions for IEEE P revision WG LB #8: WG LB #10: WG LB #10a: No comments Slide 6 Subir Das, Chair, IEEE

7 Tentative Time-line for P802.21-revision Sponsor Ballot
The Sponsor Ballot will start on August 08, 2016– Sponsor Ballot #1 Starts September 06, 2016 – Sponsor Ballot #1 Ends September 12, onwards – Address and Resolve Comments October – Sponsor Ballot recirculation November 2016 – Sponsor Ballot recirculation Slide 7 Subir Das, Chair, IEEE

8 P WG Motion Move to authorize the P WG Chair to make a motion to the IEEE 802 Executive Committee for approval to forward the IEEE P revision Draft for Sponsor Ballot. Move: Yoshikazu Hanatani Second: Lily Chen For: 08 Against: 00 Abstain: 00 Motion Passes Slide 8 Subir Das, Chair, IEEE

9 EC Motion Motion: Forward IEEE P802.21-revision for Sponsor Ballot
Move: Subir Das Second: Steve Shellhammer For: Against: Abstain: Motion Slide 9 Subir Das, Chair, IEEE

10 IEEE P802.21.1 WG Ballot Result- Final Round
• Date the last ballot closed: June 08, 2016 • Vote tally including Approve, Disapprove and Abstain votes: Ballot Pool = 22, Ballot Return= 20, Return ratio= 95.45% Number of Approves = 20 Number of Disapproves = 00 Number of Abstains = 01 Did Not Vote = 01 Approval Ratio = 100% • Comments that support the remaining disapprove votes and Working Group responses – N/ A Subir Das, Chair, IEEE

11 IEEE P802.21.1 Draft History and Statistics
IEEE WG Letter Ballot Launch Date # of Comments Received Comment Resolution Status Return Ratio Approval Ratio Draft Status WG LB #9 (P ™/D01 ) December 16, 2015 164(81T / TR, 83E / ER) Comments were addressed and Resolved 100% <75% P ™/D02 Prepared WG LB #11 (P ™/D02) March 31, 2016 28(4T / TR, 24E / ER) 94.45% 95% P ™/D03 Prepared WG LB #11a (P ™/D03) May 24, 2016 No Comments P ™/D04 Prepared MEC Review available at: Slide 11 Subir Das, Chair, IEEE

12 Links to WG Letter Ballot Results Summary for IEEE P802.21.1
WG LB #9: WG LB #11: WG LB #11a: Slide 12 Subir Das, Chair, IEEE

13 Links to WG Letter Ballot Comments & Resolutions for IEEE P802.21.1
WG LB #9: WG LB #11: WG LB #11a: No comments Slide 13 Subir Das, Chair, IEEE

14 Tentative Time-line for P802.21.1 Sponsor Ballot
The Sponsor Ballot will start on August 08, 2016– Sponsor Ballot #1 Starts September 06, 2016 – Sponsor Ballot #1 Ends September 12, onwards – Address and Resolve Comments October – Sponsor Ballot recirculation November 2016 – Sponsor Ballot recirculation Slide 14 Subir Das, Chair, IEEE

15 P WG Motion Move to authorize the P WG Chair to make a motion to the IEEE 802 Executive Committee for approval to forward the IEEE P Draft for Sponsor Ballot and approve the CSD ( Move: Hyeong Ho Lee Second: Lily Chen For: 08 Against: 00 Abstain: 00 Motion Passes Slide 15 Subir Das, Chair, IEEE

16 EC Motion Motion: Approve the CSD ( and forward IEEE P for Sponsor Ballot Move: Subir Das Second: Steve Shellhammer For: Against: Abstain: Motion Slide 16 Subir Das, Chair, IEEE

17 Topic Request for EC Approval to forward the IEEE P revision and IEEE P drafts to ISO/IEC JTC1 SC6 (Added to the Consent Agenda) Slide 17 Subir Das, Chair IEEE

18 P WG Motion Move to authorize the P WG Chair to submit Draft IEEE Std revision and Draft IEEE Std to ISO/IEC JTC1 SC6 for information under the PSDO agreement. Move: Hyeong Ho Lee Second: Lily Chen For: 08 Against: 00 Abstain: 00 Motion Passes Slide 18 Subir Das, Chair, IEEE

19 EC Motion Approve the submission of Draft IEEE Std revision and Draft IEEE Std to ISO/IEC JTC1 SC6 for information under the PSDO agreement. Move: Subir Das Second: For: Against: Abstain: Motion Passes Slide 19 Subir Das, Chair, IEEE


Download ppt "Month Year IEEE Motions in July, 2016 Plenary"

Similar presentations


Ads by Google