Linac Coherent Light Source Project Update

Slides:



Advertisements
Similar presentations
Research Instrumentation Special Interest Group Sensors & Instrumentation Knowledge Transfer Network Report on American Light Source Facilities Oliver.
Advertisements

FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
1 John Arthur 1 FEH Status CXI Review June 3, 2009 FEH Layout, Status John Arthur – LCLS Expt’l Facilities Div June 3, 2009.
John N. Galayda LCLS Facility Advisory November 11, LCLS Update November 11, 2008 Construction Status LCLS Instruments.
John Arthur X-ray November 11, 2008 SLAC National Accelerator Laboratory 1 X-ray Overview LCLS Directorate structure.
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
John N. Galayda LCLS FAC 20 April Linac Coherent Light Source Overview and Charge Facility Advisory Committee John.
John Arthur LCLS September 26, 2005 John Arthur SLAC LCLS Construction and Science.
John N. Galayda LCLS Commissioning 22 September 2004 Welcome/Charge Welcome to the Workshop LCLS Status Since the January.
John Arthur Photon October 27, Photon Systems Overview John Arthur SLAC.
LCLS Linac System Management Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
John N. Galayda LCLS FAC October Linac Coherent Light Source Overview and Charge Facility Advisory Committee.
John Arthur Photon April 20, 2006 Photon Systems Update John Arthur SLAC Photon Systems Manager.
John N. Galayda LCLS Facility Advisory 29 October 2007 Linac Coherent Light Source Overview 29 October 2007  Project.
Opening Comments and Charge 19 January 2004 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear.
John N. Galayda LCLS Facility Advisory Committee 7 April 2005 Linac Coherent Light Source Project Update Incident Budget Schedule.
John Arthur PIXEL Project April 7, 2005 Status of the Proposed PIXEL Project John Arthur SSRL/SLAC Photon Instrumentation.
David H. Dowell Injector April 29-30, 2004 LCLS Injector Overview D. H. Dowell, SLAC FAC Review April 29-30, 2004 Injector.
John Arthur Photon October 12, Photon Systems Update John Arthur SLAC 1.
Hal Tompkins Photon October 30, LCLS Photon Systems Installation and Commissioning Presentation to Facility Advisory.
LCLS Undulator Systems TDR Charge Linac Coherent Light Source Stanford Linear Accelerator Center Technical Review, March 3, 2004.
Keith O. Hodgson SSRL Director Brief Update on the Linac Coherent Light Source - LCLS February 26, 2002 Basic Energy Sciences Advisory Committee Undulator.
David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 1 Undulator Complex Status LCLS Introduction.
David Saenz Readiness for Oct 12, 2006 # Meeting of the LCLS Facilities Advisory Committee LCLS Conventional Facilities.
John N. Galayda LCLS Accelerator Readiness December 2, LCLS Overview December 2, 2008 Project Construction Status.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science Office of Science Review of the LCLS.
Max Cornacchia, SLAC LCLS Project Overview BESAC, Feb , 2001 LCLS Project Overview What is the LCLS ? Transition from 3 rd generation light sources.
LCLS-II Project Overview David Schultz LCLS-II Deputy Project Director March 19, 2012.
Experimental Facilities Planning
DOE Review May, 2005 Steve Lewis
Injector Performance Requirements Conventional Facilities Update
LCLS Ultrafast Science Instruments
CF Organization & Schedule
LCLS Injector: Introduction D. H
LCLS Linac Update Brief Overview L1 & BC1 Progress LTU & E-Dump Status Continuing Resolution Impact.
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
Linac Ops Budget Review LCLS Overview / Org Structure / Legacies
WBS 5.0 LCLS Strategic Projects Division
John N. Galayda – Director of LCLS Construction March 30, 2009
LCLS History and Science Overview Keith Hodgson, SSRL Director April 23, 2002 LCLS DOE Review, April 23, 2002 Keith Hodgson, SSRL.
Electron Beam Systems ETC and Methodology
LCLS Linac Overview E. Bong Lehman Review August 10, 2004
CONVENTIONAL FACILITIES LCLS Office Space
Linac (WBS 1.2.2) Vinod Bharadwaj April 23, 2002
LCLS Overview John N. Galayda, SLAC April 23, 2002
X-Ray Endstation Design & Management/Commissioning
X-Ray Transport, Optics, and Diagnostics WBS Alan J
X-Ray Endstations Update
Conventional Facilities (WBS 1
Details supporting the increase
CONVENTIONAL FACILITIES LCLS Office Space Procurement
Project Management Issues John N. Galayda, SLAC April 24, 2002
Conventional Facilities WBS 1.9
Synchrotron Science and User Program at SSRL A Brief Overview for the Context of LCLS Presented to the DOE Review of the LCLS Project Keith O. Hodgson,
Experimental Program and Endstations System (WBS ) J
John Arthur – LCLS Experimental Operations
PIXEL Project Status John Arthur Photon Instrumentation for
LCLS Injector Configuration
LCLS Week 4-8 April, 2005 Steve Lewis
LCLS Injector System Overview D. H
Linac Coherent Light Source Transition to Operations 11 July 2007
X-Ray Endstation Design & Management/Commissioning
LCLS Lehman Review February 7-9, 2005
LCLS e- Beams System Overview
CF Scope, Management & Organization
X-Ray Endstation Systems (XES) 2006 Schedule
1.9 Conventional Facilities
DOE Status Meeting of the LCLS Project
LCLS Instrument MIE Project: Staffing, Schedule
LCLS Photon Systems Overview
Presentation transcript:

Linac Coherent Light Source Project Update Budget Project Organization, Activities Far Hall

LCLS - Estimated Cost, Schedule $273M Total Estimated Cost $315M Total Project Cost FY2005 Long-lead purchases for injector, undulator FY2006 Construction begins FY2007 FEL Commissioning begins September 2008 Construction complete – operations begins XFEL Commissioning Title I Design Complete CD-0 CD-1 CD-2a CD-2b CD-3b FY2001 FY2002 FY2003 FY2004 FY2005 FY2006 FY2007 2002 2003 2004 2005 2006 FY2008 FY2009 Project Engineering Design Long-Lead Procurement Construction Operation CD-3a CD-4

LCLS - Estimated Cost, Schedule $315M Total Estimated Cost $379M Total Project Cost FY2005 Long-lead purchases for injector, undulator FY2006 Construction begins FY2008 FEL Commissioning begins March 2009 Construction complete – operations begins XFEL Commissioning Title I Design Complete CD-0 CD-1 CD-2a CD-2b CD-3a CD-3b FY2001 FY2002 FY2003 FY2004 FY2005 FY2006 FY2007 2002 2003 2004 2005 2006 FY2008 FY2009 Project Engineering Design Long-Lead Procurement Construction Operation CD-3a CD-4

FY2005 – Start Long-Lead Procurements Authorized FY2005 President’s Budget FY2006

LCLS Peoplepower / System / Lab Critical Slots: Laser Group Leader Physics Team Leader Electron Systems Photon Systems SLAC/ANL Liaison Engineer Procurement Lead FY05 is key ramp-up year

LCLS a Division of SLAC 8/2004 Linac Coherent Light Source Division Associate director J. Galayda Chief Engineer M. Reichanadter

Inside LCLS LLNL

Staffing Hires ES&H Coordinator - Done – M. Scharfenstein QA Coordinator – Interviews done Database managers – Interviews started laser group leader – Interviews done e-beam systems manager – Interviews done Accel Physics Group Lead – to be announced ANL Undulator Systems Chief Engineer – Done- G. Pile, ANL

1.4 Undulator Systems

Long-Lead Procurements, FY2005 - Undulator Systems Undulator Hardware Magnet Blocks Magnet Poles Awarded Strongback Awarded Undulator Measurement Lab design complete, bid package in preparation for room On track for complete delivery of undulators by June 2007

Straight Ahead Spectrometer LCLS Injector 10/2005 Shutdown RF Gun Load Lock L0-1 & L0-2 3-m SLAC Sections Gun Diagnostics Laser Heater Transverse RF Cavity DL1 Bend Straight Ahead Spectrometer

Undulator Magnet Measurement – Bldg 81 Test stand lay-out is driven by requirement to match the Earth Magnetic Field conditions in lab to Undulator Hall, i.e. azimuth and gap orientation need to be identical

Long-Lead Procurements, FY2005 - Linac Selected Linac Systems X-band RF system – underway Klystron construction >50% Chicane Magnets vendor survey

Injector Building out for bid Laser bids in Gun in fabrication at SLAC Preparations for October shutdown vacuum connection to linac Elev -35’-0” Elev 0’-0” Sector 20 Laser Facility

1.5 X-ray Transport, Optics, and Diagnostics Layout FEH NEH Flipper Mirror FEE Tunnel Experiments: Atomic Physics Front End Enclosure Fast Close Valve Slits Attenuators Shielding Experiments Optics Structural Bio Nano-scale Femtochem FEL Measurements & Experiments: Low Power Imaging High Power Imaging Spectrometer Calorimeter FEH Optics: Pulse-Split-&-Delay Monochromator Experiments: Optics Warm Dense Matter

1.9 Conventional Facilities Title-II Kickoff 29-30 March 2005 Undulator Hall (175m) Beam Dump (40M) Front End (29m) X-ray Transport (250m) Far Expt. Hall Near Expt. Hall Linac-to-Undulator (227m) Far Expt. Hall 2nd Undulator Line 3rd Undulator Line Near Experiment Hall

1.9 Conventional Facilities Construction Manager Out for Bids Undulator Hall (175m) Beam Dump (40M) Front End (29m) X-ray Transport (250m) Far Expt. Hall Near Expt. Hall Linac-to-Undulator (227m) Central Lab Office Complex (CLOC) Capacity ~300 72,000 GSF Total 150-Seat Conference Room

Alternate Far Hall Layout 14.6m 10-meter hutch length

LCLS Facility Advisory Committee Membership Kem Robinson, Lawrence Berkeley National Laboratory (LBNL), Chair Harry Carter, Fermi National Accelerator Laboratory (FNAL) John Cleary, Stanford University (SU) John Corlett, Lawrence Berkeley National Laboratory (LBNL) Roger Falcone, UC Berkeley Josef Feldhaus, Deutsches Elektronen-Synchrotron (DESY) Paul Fouss, Argonne National Laboratory (ANL) Thomas Himel, Stanford Linear Accelerator Center (SLAC) Vim Leemans, Lawrence Berkeley National Laboratory (LBNL) Pat O'Shea, University of Maryland (UMD) Joachim Pflueger, Deutsches Elektronen-Synchrotron (DESY) Thomas Rabedeau, Stanford Linear Accelerator Center (SLAC) Jörg Rossbach, Deutsches Elektronen-Synchrotron (DESY) Keith Schuh, Fermi National Accelerator Laboratory (FNAL) Peter Siddons, Brookhaven National Laboratory (BNL) Thomas Tschentscher, Deutsches Elektronen-Synchrotron (DESY) Karen White, Thomas Jefferson National Accelerator Facility (TJNAF) Meetings 29-30 April 2004 12-13 October 2004 7-8 April 2005 DOE (Lehman) Review 10-12 May will cover PIXEL

What’s Next Events Calendar DESY XFEL Undulators 6-8 June Hamburg DESY XFEL Commiss. 17-22 April Zeuthen DESY XFEL Undulators 6-8 June Hamburg FEL2005 21-26 August Stanford

What’s Next Review Calendar FAC 7-8 April 2005 SAC 5-6 May 2005 Lehman 10-12 May 2005

FFTB/SPPS Schedule Must preserve funds for FY boundary BUT Acceleration of 2006 procurements considered Conventional construction – SPPS/FFTB schedule LCLS draft schedule shows May 2006 Shutdown SLAC “draft” schedule shows July 2006 Shutdown Linac Complete by end of 2006-2007 shutdown FFTB shutdown pushes LCLS Commssioning Start May 2008 at this time Exploring possibility of an earlier start

George Carlin We have written a check to DOE with our Mouths… Time to cash the check

With DOE support, LCLS design has Summary With DOE support, LCLS design has More extensive research infrastructure Greater flexibility for the future LCLS is underway

End of Presentation

Near Experimental Hall by 2012 Soft X-ray Station AMO Physics Magnetic imaging Hard X-ray Imaging Station Coherent imaging Hard X-ray Diffraction Station Pump-probe dynamics Hard X-ray Diffraction Station XPCS Hard X-ray Station Extreme states of matter (assumes funding found) Far Experimental Hall

Near Experimental Hall 2008-9 Soft X-ray Station AMO Physics (funded by LCLS) Hard X-ray Imaging Station Coherent imaging (funded by PIXEL) Extreme states of matter (funding?) Hard X-ray Diffraction Station Pump-probe dynamics (funded by PIXEL) XPCS (funded by PIXEL) Green applications do not have full capability, but can do preliminary experiments Far Experimental Hall