Presentation is loading. Please wait.

Presentation is loading. Please wait.

LCLS Injector System Overview D. H

Similar presentations


Presentation on theme: "LCLS Injector System Overview D. H"— Presentation transcript:

1 LCLS Injector System Overview D. H
LCLS Injector System Overview D. H. Dowell, SLAC Lehman Review August 10-12, 2004 Injector Performance Requirements Description of the LCLS Injector Facility Accelerator Housing Sector 20 Alcove New Features of the Injector Drive Laser Plan Laser Heater (replaces SC wiggler) Dual RF Feed Coupler Design for Gun and L0-1 Schedule and Budget and Organization Risks and Near Term Plans Summary

2 LCLS Injector Performance Requirements:

3 Sector 20 Injector Facility
Laser Bay Drive Laser Transport Tube 10 m Laser Heater Accelerators RF Gun UV Launch and Condition.

4 The LCLS Injector Facility at Sector 20
Local Control Room Storage Personnel and Equipment Access to Injector Laser Room Top View of S20 Alcove Laser Penetration Cathode Lab Side View of S20 Alcove, stairwell and injector off-axis vault Injector

5 LCLS Injector Configuration
Progress Since CD2a: L0-1 Dual Feed RF Design Completed 120 Hz Gun RF Design Nearly Complete Laser Heater Added to Injector =>Replacing SC Wiggler RF Gun Load Lock Transverse RF Cavity Laser Heater DL1 Bend Straight Ahead Spectrometer L0-1 & L0-2 3-m SLAC Sections Gun Diagnostics

6 S20 Alcove Floor Plan Title I Completed
Title II Specifications Released Room & Utilities Sized for 2 Drive Lasers

7 Drive Laser Architecture and Procurement
Laser Design & Acquisition Plan Reviewed Budgetary Quotes Received from 5 vendors Procurement Plan Ready for FY05

8 LCLS Will Use Part of the Existing High Power RF
No procurement of high power RF equipment Waveguide runs established and in design LLRF System in design

9 Dual Feed RF Gun and Solenoid
Request for Information Response from 2 Vendors Dual Feed Design Corrects RF Fields to Second Order Solenoid Design Includes Both Dipole and Quadrupole Field Correctors

10 Laser Heater System 50 cm 10 cm q  5.7º 10 cm ~120 cm 2 cm
Laser heater replaces SC wiggler to suppress beam instabilities Uses a small portion of the drive laser IR beam Cost and Schedule in Baseline Slide compliments of P. Emma

11 Laser Heater Effect on Beam
Laser Heater increases the uncorrelated energy spread from ~5keV to more than 50keV to suppress beam instabilities. Studies show Laser Heater is more effective than SC Wiggler in controlling instabilities. P0 = 2 MW w0 = 400 mm sx  200 mm sy  200 mm Slide complements of P. Emma

12 Laser-Heater Parameters

13 Injector Schedule Schedule Coordinated with Shutdowns
Over a Year for Injector Commissioning Injector Not on Project Critical Path

14 Budgeted Cost of Work Scheduled (BCWS)
Procurements Mostly in FY05 OPC Shows Commissioning Ramp Up in FY06 & FY07

15 Injector Organization

16 Injector Risks Difficulty of achieving 1 micron @ 100 amps
Drive Laser spatial and temporal shaping combined with UV conversion Shaping with complete laser system has not been demonstrated Shaper (Dazzler) Experiments at BNL will begin September 1 Spatial shaping + UV conversion planned at ANL Reliable drive laser operation Specify a diode-pumped laser system Reliable gun operation at 120 MV/m Plan for future guns

17 Plans for next six months
Award contract for drive laser Award contract for RF gun system Demonstrate laser shaping with Dazzler and aspheric optics Continue reviewing and engineering designs Begin procuring and fabricating parts

18 Summary and Conclusions
Injector Configuration Finalized Sector 20 Alcove Will be New Construction ~850 sq. ft. for Drive Laser Bay More Space for Cathode Lab Injector Schedule: Installation Plan Tied to Linac Downtimes ~400 days for injector commissioning Design and Procurement Approach: Improve and Re-Use Existing SLAC Designs Utilize Competent Vendors Drive Laser Procurement Plan Established (5 vendors identified) RF Designs Nearly Complete (2 vendors identified) In Process of Building Injector Organization Ready to Begin Long Lead Acquisitions in FY05


Download ppt "LCLS Injector System Overview D. H"

Similar presentations


Ads by Google