The Transition to User Operations

Slides:



Advertisements
Similar presentations
LCLS Transition to Science DOE Status Review of the LUSI MIE Project LCLS NEH ARR John Arthur LCLS Experimental Facilities Division August 11, 2009 Welcome.
Advertisements

Hal Tompkins FEE/FEL June 16, FEE/FEL Commissioning Overview By Hal Tompkins Photon Beam Systems Deputy.
1 John Arthur 1 FEH Status CXI Review June 3, 2009 FEH Layout, Status John Arthur – LCLS Expt’l Facilities Div June 3, 2009.
1 Roger Erickson 1 Coordination with Accelerator Systems NEH Accelerator Readiness Review Coordination with Accelerator Systems.
Jochen R. Schneider AMO Proposal June 2, LCLS User Access Policy Goals Scientific thrust areas - Instrument Teams.
John N. Galayda LCLS Facility Advisory November 11, LCLS Update November 11, 2008 Construction Status LCLS Instruments.
John Arthur X-ray November 11, 2008 SLAC National Accelerator Laboratory 1 X-ray Overview LCLS Directorate structure.
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
John N. Galayda LCLS FAC 20 April Linac Coherent Light Source Overview and Charge Facility Advisory Committee John.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project The Instrument Readiness Review Process John Arthur LCLS Experimental Facilities Division.
John Arthur X-ray June 17, X-ray Overview XTOD current status XES current status Schedule to first experiments.
Diffraction studies of stimulated dynamics (pump-probe) Coherent-scattering studies of nanoscale fluctuations Atomic, molecular and optical science High.
1 Stefan Moeller 1 AMO Instrument Schedule ARR AMO Instrument Schedule Stefan Moeller – XES Manager June 30, 2009.
John Arthur Photon Systems April 16, LCLS Photon Systems Status Technical status and accomplishments Response to.
John Arthur Photon October 18, 2005 LCLS Photon Systems Status John Arthur SLAC.
Accelerator Systems Division FACET Project Management John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
John Arthur Photon October 29, Photon Systems Update FAC recommendations Current status New plan for Photon Systems.
John Arthur Photon October 27, Photon Systems Overview John Arthur SLAC.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project NEH status and XFD operations Hal Tompkins, John Arthur LCLS Experimental Facilities.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project Update on LCLS User Proposals John Arthur, Jochen Schneider Experimental Facilities.
John Arthur Photon April 20, 2006 Photon Systems Update John Arthur SLAC Photon Systems Manager.
1 Michael Rowen 1 SXR Instrument FAC SXR Instrument Michael Rowen – Engineering Physicist June 9, 2009.
John N. Galayda LCLS Facility Advisory 29 October 2007 Linac Coherent Light Source Overview 29 October 2007  Project.
John Arthur X-Ray Endstation April 29, 2004 X-Ray Endstations Overview John Arthur.
1 T. Fornek 1 LUSI CXI FIDR June 3, 2009 Thomas Fornek Project Manager June 3, 2009 LUSI Coherent X-Ray Imaging Instrument Final.
John Arthur PIXEL Project April 7, 2005 Status of the Proposed PIXEL Project John Arthur SSRL/SLAC Photon Instrumentation.
1 T. Fornek 1 LUSI XCS FIDR June 17, 2009 Thomas Fornek Project Manager June 17, 2009 LUSI X-Ray Correlation Spectroscopy Instrument.
John Arthur X-ray April 20, 2006 X-Ray Beamline and Experiment Layout John Arthur LCLS Photon Systems Manager.
John Arthur Photon October 12, Photon Systems Update John Arthur SLAC 1.
Hal Tompkins Photon October 30, LCLS Photon Systems Installation and Commissioning Presentation to Facility Advisory.
Stefan Moeller XES Plan for FAC Review - April 20, 2006 X-Ray Endstation Systems (XES) Status and Plan for FY06 Stefan Moeller.
John Arthur Photon Systems April 7, 2005 Photon Systems Overview John Arthur.
David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 1 Undulator Complex Status LCLS Introduction.
John Arthur LUSI DOE Review August 19, 2008 Transition to Operations p. 1 From construction project to operating facility Structure.
1 Zoe Van Hoover 1 User Safety: Commissioning and Early Experiments NEH ARR User Safety: LCLS NEH Commissioning and Early Experiments.
John N. Galayda LCLS Accelerator Readiness December 2, LCLS Overview December 2, 2008 Project Construction Status.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science Office of Science Review of the LCLS.
LCLS User Access Policy
LUSI Coordination with LCLS
Experimental Facilities Planning
LCLS Ultrafast Science Instruments
1 Zoe Van Hoover 1 User Safety: Commissioning and Early Experiments NEH ARR User Safety: LCLS NEH Commissioning and Early Experiments.
Hal Tompkins – Photon Beam Systems Deputy June 8, 2009
Linac Ops Budget Review LCLS Overview / Org Structure / Legacies
WBS 5.0 LCLS Strategic Projects Division
LINAC OPS Budget Review
Stefan Moeller – XES Manager May 14, 2009
John N. Galayda – Director of LCLS Construction March 30, 2009
Electron Beam Systems ETC and Methodology
Thomas Fornek Project Manager July 15, 2009
LINAC OPS Budget Review
John N. Galayda – Director, LCLS Construction May 13, 2009
LCLS User Research Administration
X-Ray Transport, Optics, and Diagnostics WBS Alan J
X-Ray Endstations Update
LCLS User Access Policy
Project Management Issues John N. Galayda, SLAC April 24, 2002
John Arthur – LCLS Experimental Operations
NEH - Status Stefan Moeller.
PIXEL Project Status John Arthur Photon Instrumentation for
LCLS Project Transition to Operations 14 May 2008
Hal Tompkins – Photon Beam Systems Deputy May 14, 2009
DOE Review 7-9 February, 2006 Steve Lewis
Linac Coherent Light Source Project Update
Linac Coherent Light Source Transition to Operations 11 July 2007
X-Ray Endstation Design & Management/Commissioning
X-Ray Endstation Systems (XES) 2006 Schedule
LCLS Instrument MIE Project: Staffing, Schedule
LCLS Photon Systems Overview
LUSI Controls and Data Systems W.B.S. 1.6
Presentation transcript:

The Transition to User Operations John Arthur – LCLS Expt’l Facilities Div May 14, 2009

LCLS Organization LCLS Director Accelerator Systems Div Dale Knutson Accelerator Systems Div John Seeman operate accelerator for science Experimental Facilities Div Jochen Schneider operate instruments for science Business Div Cindy Lowe Engineering Physics Div David Schultz Strategic Projects Div John Galayda LCLS Construction LUSI

Division of responsibility ASD responsibility Undulator Hall XFD responsibility Near Experimental Hall Front End Enclosure Far Experimental Hall

Experimental Facilities Division (XFD)

Experimental Facilities Division Tasks Manage safe operations in LCLS experimental areas Manage LCLS user program Maintain and upgrade X-ray instrumentation Enable good user science; initiate in-house research

Current XFD Priorities LCLS Construction: Installation in FEE, Hutch 1 Augment scientific and support staff Create structure for safe operations Begin User program LUSI: Accelerate schedule

Two-phase installation FEE installation plan Two-phase installation Phase 1 Solid Attenuators Gas Attenuator Calorimeter Beam Direction Slit Gas Detectors K-Mono 5 mm collimator Direct Imager (Scintillator) FEL Offset Mirror Systems Phase 2

FEE installation details Phase 1 includes all X-ray diagnostics Most items shipped to SLAC from LLNL, being installed Most wiring done, about to begin testing First beam by end of May Phase 2 includes mirrors Install most component in May Beam-alignment cameras installed in late June

LCLS Offset Mirror Systems 800-2000 eV to Hutch 1 HOMS: Hard x-ray Offset Mirror System SOMS: Soft x-ray Offset Mirror System insertable 800-2000 eV to Hutch 2 Shadow Wall Wall 2 insertable 2000-25000 eV to Hutch 3-6

The first two LCLS instruments AMO Soft X-ray beamline without monochromator, for high-field experiments Funded by LCLS Construction Installation June 2009 Commissioning July 2009 SXR Soft X-ray beamline with monochromator, for materials science Funded by SXR Consortium Installation January 2010 Commissioning March 2010

XFD began 2009 with some staff in place XFD staffing XFD began 2009 with some staff in place J. Schneider, J. Hastings, J. Arthur (upper management) H. Tompkins (NEH Area Manager) P. Stefan, S. Moeller (diagnostics physicists) N. van Bakel (detector physicist) J. Bozek (AMO scientist) D. Fritz, A. Robert, S. Boutet, Y. Feng (LUSI scientists) Matrix support from Laser group, Controls group, DAQ group, Rad Physics A total of about 20 people equal to 12 FTE

New staff supporting XFD early operations XFD staffing New staff supporting XFD early operations Z. Van Hoover (XFD Safety Officer) J. Bringetto (XFD Documentation Specialist) H. Kamil (LCLS User Admin) C. Bostedt (AMO scientist) D. Rich, J-C Castagna, M. Holmes (operations engineers) Coming soon, needed for AMO commissioning Floor Coordinators (interviewing now, 5 to be hired) Coming soon, not essential for AMO commissioning Additional technicians Administrator Additional scientists

New XFD Operations Structure Strong ties between XFD and ASD ASD operating structure used as a model for XFD Preparing key processes and documentation XFD directives: describe roles/responsibilities and prescribed actions XFD training plan and training records plan SAD, ASE to include NEH Instrument Readiness Review (IRR) process for adding capability to LCLS experimental area incrementally

Timeline to approval for experimental ops May Install FEE instrumentation Hire remaining staff, prepare processes and documentation June X-rays in FEE, commission diagnostics Install AMO instrument Prepare for ARR Accelerator Readiness Review June 30 Validate operational readiness process, including IRR process July Instrument Readiness Review for Hutch 1 and AMO instrument Resolve any final issues X-rays to AMO, begin instrument commissioning

LCLS User Program Goal: safe, efficient operation promoting the best science LCLS will be a DOE-BES User Facility Access through proposal/review process LCLS scientific staff frequently collaborate with users, also maintain independent research programs

User Program Management LCLS and SSRL are combining resources, creating a common User Administration Group Managed by Cathy Knotts Manages User training, User agreements, User metrics LCLS supports one added User Administrator

LCLS Proposal Review Panel (PRP) PRP members Christina Back (San Diego) Janos Kirz (LBNL) Magid Chergui (ETH Lausanne) Dwayne Miller (Toronto) Lew Cocke (Kansas) Juerg Osterwalder (University of Zuerich) Gianluca Gregori (Cambridge, UK) Metin Tolan (University of Dortmund) Chi-Chang Kao (BNL) Kyoshi Ueda (Sendai) Steve Kevan (Oregon) Edgar Weckert (DESY) Two representatives of LCLS management without voting rights: Jerry Hastings Jochen Schneider

LCLS User Program: Important dates First proposal round close 9/1/2008 (AMO only) 2nd proposal round close 5/15/2009 (AMO, SXR) 3rd proposal round close ~10/1/2009 (AMO, SXR, XPP)

LCLS User Program: First experiments First proposal round: 28 proposals from 16 countries (>200 scientists) PRP met in December, gave highest rank to ~10 proposals Most highly-ranked proposals will study effects of intense X-ray pulses on atoms or simple atomic clusters Some highly-ranked proposals will try diffraction imaging of molecules or clusters

Summary XFD is a new department at SLAC, will run LCLS X-ray experimental facilities XFD and ASD are working together to operate LCLS XFD will be the interface between LCLS and the world user community XFD is staffing up and preparing a structure for safe, efficient operations