X-ray Transport, Optics, and Diagnostics: Controls Status DOE Review 7-9 February, Steve Lewis 1

2 Requirements Provide EPICS controls for XTOD Major Areas:
Front End Enclosure Near Experimental Hall Tunnel Far Experimental Hall Major Technologies: Motors (instruments; slit; offset mirror) Instruments Vacuum

3 Naming and counting all devices Block diagrams of entire system
FY05 Tasks Completed Naming and counting all devices Block diagrams of entire system Aligning XTOD controls hardware with LCLS global standards …almost Completing cost+schedule Installing (3) servers for EPICS and PLC software at LLNL

4

5

6 Cost Summary =5 FTEs

7 Design Maturity Motors: Newport XPS and Hytec will be SLAC standard
Cameras: Camlink will be SLAC standard Vacuum: PLCs and I/O will be SLAC standard IOCs will be SLAC standard Instruments: undefined so far

8 Schedule FY06 Detailed wiring and rack layout Bring up PLC environment
Install EPICS Prototype Gas Attenuator and Vacuum Prototype Motors, Cameras, and IOCs R&D on Diagnostics

9 Schedule FY07 FY08 Procure all H/W Configure EPICS Design Diagnostics
Complete Diagnostics Commission