Stefan Moeller XES Plan for FAC Review - April 20, 2006 X-Ray Endstation Systems (XES) Status and Plan for FY06 Stefan Moeller.

Similar presentations


Presentation on theme: "Stefan Moeller XES Plan for FAC Review - April 20, 2006 X-Ray Endstation Systems (XES) Status and Plan for FY06 Stefan Moeller."— Presentation transcript:

1 Stefan Moeller XES Plan for FY06smoeller@slac.stanford.edu FAC Review - April 20, 2006 X-Ray Endstation Systems (XES) Status and Plan for FY06 Stefan Moeller

2 XES Plan for FY06smoeller@slac.stanford.edu FAC Review - April 20, 2006 Outline Scope Layout Milestones Status Plan for FY06 Summary

3 Stefan Moeller XES Plan for FY06smoeller@slac.stanford.edu FAC Review - April 20, 2006 Scope and Goals The X-Ray Endstation Systems (XES) group will create the infrastructure required for experimenters to make best scientific use of the LCLS radiation safely XES will equip a complete instrument for Atomic Physics Experiments Coordinate all safety related aspects for the user environment and the experiments

4 Stefan Moeller XES Plan for FY06smoeller@slac.stanford.edu FAC Review - April 20, 2006 Endstation Systems Location and Layout FEE, NEH, XR Tunnel, FEH: Controls, Cabling, Network, PPS, MPS NEH: AMO Instrument, Beam-line Controls, Laser, Mech./Vacuum 646 ft XR Tunnel FEH FEE NEH

5 Stefan Moeller XES Plan for FY06smoeller@slac.stanford.edu FAC Review - April 20, 2006 Recent Changes: Reorganization: LCLS Controls owns controls effort in each WBS (includes Technical, Cost and Schedule) Hamid Shoaee is Control Account manager of 1.6.2. XES Controls (WBS 1.6.2): Network, Beamline Controls, PPS, MPS Scope: Reduced Streak Camera, Imaging and Intensity Detector Added (May 06): Undulator diagnostic (FEE)

6 Stefan Moeller XES Plan for FY06smoeller@slac.stanford.edu FAC Review - April 20, 2006 Photon System Manager J. Arthur H. Tompkins LCLS 1.5 X-Ray Transport &Diagnostics R. Bionta (LLNL) 1.6 Endstation Systems S. Moeller Science Advice J. Hastings Project Planning J. Doubrava Laser Systems Bill White

7 Stefan Moeller XES Plan for FY06smoeller@slac.stanford.edu FAC Review - April 20, 2006 LCLS XES Lasers Bill White +2 people Detectors Niels van Bakel Atomic Physics (incl. Mech. and Vacuum) John Bozek +3 engineers Controls Hamid Shoaee Bob Dalesio Mike Saleski (PPS) +7 people Installation Hal Tompkins +Inst Team

8 Stefan Moeller XES Plan for FY06smoeller@slac.stanford.edu FAC Review - April 20, 2006 XES L3 Milestones Level 3 FY05 Complete 2D Detector Statement of Work Award Initial R&D Funding for 2D Detector FY06 Hire Atomic Physicist Hire Detector Physicist Design Review #1 for 2D Detector Specification for Streak Camera FY07 Design Review #2 for 2D Detector CT: Network Final Design Review CT: Beamline Control Final Design Review Laser Final Design Review Order Lasers FY08 Start Installation in FEH Laser Operating in NEH CT: Complete Beamline Controls Complete Mech./Vacuum Installation CT: Complete Network and Cabling Complete Acceptance Tests of Detectors Complete Installation in NEH First Atomic Physics Experiment

9 Stefan Moeller XES Plan for FY06smoeller@slac.stanford.edu FAC Review - April 20, 2006 Status and Plan for FY06 - Detectors Detector Physicist hired: Niels van Bakel (2/06) LDAC Review #2 for FY05 (Feb. 9 -10, 2006) Next Review (#3) in July 06 Cornell 2 D Detector On schedule Design and layout for 2nd submission in May Mayor Review planned for end of 06 Start Streak Camera developing specs, requirements with users defining contract with LBL

10 Stefan Moeller XES Plan for FY06smoeller@slac.stanford.edu FAC Review - April 20, 2006 Status and Plan for FY06 - AMO Atomic Physicist hired: John Bozek (1/06) Coordinating with AMOS science group Defining experimental program and requirements of AMOS station Starting with specs, design AMOS Instrument Coordination with LCLS Controls on beamline controls

11 Stefan Moeller XES Plan for FY06smoeller@slac.stanford.edu FAC Review - April 20, 2006 Status and Plan for FY06 – Controls (Responsibility of LCLS Controls) PPS Engineer hired: Mike Saleski (1/06) Started PPS, BCS specs Contracted FY06 controls tasks: Bob Dalesio (3/06) Coordinate with LCLS Controls Develop layout of XES Controls architecture Specification XES Network Specification XES Beamline Control

12 Stefan Moeller XES Plan for FY06smoeller@slac.stanford.edu FAC Review - April 20, 2006 Tasks for FY06 Now ongoing: Developing detailed schedule for XES Coordinate XES Controls requirements with LCLS Controls Identifying resource needs (PPS, MPS, Beamline Control Engineer, Network) Design PPS, MPS (7/06) Start Specification Network (7/06) Start Specification Beamline Control (7/06) User safeguards (7/06) Coordinate with Laser Systems Laser Engineer, Laser PPS (7/06) Start Design AMO Instrument (6/06)

13 Stefan Moeller XES Plan for FY06smoeller@slac.stanford.edu FAC Review - April 20, 2006 Summary XES is staffing up according to plan Atomic Physicist, Detector Physicist on board Start detailed design of AMOS Instrument Continue 2D Detector program with Cornell Coordinate with AMOS working group and LUSI Coordinate with LCLS Laser group Develop Installation and Commissioning Plan Coordinate with LCLS Controls: Hired PPS Manager (LCLS wide) Hired Controls Engineer, (Network, Beamline Controls) Start with Controls design (PPS, Network)


Download ppt "Stefan Moeller XES Plan for FAC Review - April 20, 2006 X-Ray Endstation Systems (XES) Status and Plan for FY06 Stefan Moeller."

Similar presentations


Ads by Google