FEE Diagnostics and Commissioning

Slides:



Advertisements
Similar presentations
Heinz-Dieter Nuhn, SLAC / LCLS Undulator Checkout and Startup Plans November 12, Undulator Checkout and Startup Plans Heinz-Dieter.
Advertisements

Hal Tompkins FEE/FEL June 16, FEE/FEL Commissioning Overview By Hal Tompkins Photon Beam Systems Deputy.
1 John Arthur 1 FEH Status CXI Review June 3, 2009 FEH Layout, Status John Arthur – LCLS Expt’l Facilities Div June 3, 2009.
October 30, 2007 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Commissioning Plans 1 Undulator Commissioning Plans Heinz-Dieter Nuhn,
Richard M. Bionta XTOD July 19-21, 2005 UCRL-PRES-xxxxxx X Ray Diagnostics LCLS FAC Meeting Oct. 27, 2005.
James Welch October 30, FEL Commissioning Plans J. Welch, et. al. FEL Commissioning Plans J. Welch, et. al. Accelerator.
John N. Galayda LCLS Facility Advisory November 11, LCLS Update November 11, 2008 Construction Status LCLS Instruments.
Heinz-Dieter Nuhn, SLAC / LCLS LTU/Undulator Commissioning Plans June 16, LTU/Undulator Commissioning Plans Heinz-Dieter.
John Arthur X-ray November 11, 2008 SLAC National Accelerator Laboratory 1 X-ray Overview LCLS Directorate structure.
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
John Arthur X-ray June 17, X-ray Overview XTOD current status XES current status Schedule to first experiments.
Paul Emma LCLS Commissioning Status Nov. 11, 2008 SLAC National Accelerator Laboratory 1 LCLS Commissioning Status P. Emma for The.
X Ray Beam Characterization Richard M. Bionta Facility Advisory Committee Meeting April 30, 2004 Richard M. Bionta Facility Advisory Committee Meeting.
X Ray Transport / Optics / Diagnostics Overview Richard M. Bionta Facility Advisory Committee Meeting April 29, 2004 Richard M. Bionta Facility Advisory.
XTOD Diagnostics for Commissioning the LCLS* January 19-20, 2003 LCLS Undulator Diagnostics and Commissioning Workshop Richard M. Bionta January 19-20,
John Arthur Photon October 27, Photon Systems Overview John Arthur SLAC.
“Pinhole Measurement” Approach to K Measurements using Spontaneous Radiation November 14, 2005 J. Welch, R. Bionta, S. Reiche.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
John Arthur Photon April 20, 2006 Photon Systems Update John Arthur SLAC Photon Systems Manager.
Richard M. Bionta X-Ray Transport, Diagnostic, & Commissioning September 22, 2004 UCRL-PRES Two Problems... LCLS Diagnostics.
Richard M. Bionta XTOD Layout and Diagnostic October 12-13, 2004 UCRL-PRES-XXXXX XTOD Layout and Diagnostic Systems Facility Advisory.
John Arthur Photon October 12, Photon Systems Update John Arthur SLAC 1.
Hal Tompkins Photon October 30, LCLS Photon Systems Installation and Commissioning Presentation to Facility Advisory.
Richard M. Bionta XTOD Beam and Detector October 12-13, 2004 UCRL-PRES-XXXXX XTOD Beam and Detector Simulations Facility Advisory.
R. M. Bionta SLAC November 14, 2005 UCRL-PRES-XXXXXX LCLS Beam-Based Undulator K Measurements Workshop Use of FEL Off-Axis Zone Plate.
John Arthur Photon Systems April 7, 2005 Photon Systems Overview John Arthur.
Arturo Alarcon Undulator Controls Module Status 11/12/2008 SLAC National Accelerator Laboratory 1 Undulator Controls Module Status.
The DESY Gas Monitor Detector (GMD) at the SXR beamline at LCLS Stefan Moeller, LCLS Kai Tiedtke, Svea Kreis, Fini Jastrow, Andrei Sorokin (DESY) Michael.
David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 1 Undulator Complex Status LCLS Introduction.
John N. Galayda LCLS Accelerator Readiness December 2, LCLS Overview December 2, 2008 Project Construction Status.
Experimental Facilities Planning
DOE Review May, 2005 Steve Lewis
Steps towards beam commissioning: Photon Diagnostics
Proposed Offset Mirror System
Commissioning Status of the LCLS Accelerator and Undulator Systems
Hal Tompkins – Photon Beam Systems Deputy June 8, 2009
LTU/Undulator Installation Status
John N. Galayda – Director of LCLS Construction March 30, 2009
e-Beams Systems Update
X-Ray Transport, Optics, and Diagnostics WBS Alan J
Diagnostics Richard M. Bionta, LLNL April 24, 2002
Overview Pre-Beam Checkouts
High Level Physics Applications for LCLS Commissioning
AMO Early Science Capability
Transverse size and distribution of FEL x-ray radiation of the LCLS
Optics John Arthur, SLAC & William W. Craig, LLNL April 24, 2002
John Arthur – LCLS Experimental Operations
Linac Diagnostics Commissioning Experience
Coherent X-ray Imaging Instrument WBS 1.3
LCLS Injector Commissioning P
Conventional Facilities Status
Shutdown Planning & Installation Schedule
LTU/Undulator Installation Status
X-ray Correlation Spectroscopy Instrument
Hal Tompkins – Photon Beam Systems Deputy May 14, 2009
DOE Review 7-9 February, 2006 Steve Lewis
Control System Overview Hamid Shoaee LCLS Control System Manager
Photon Systems Breakout Lehman Review July 11, 2007
Undulator Physics Diagnostics / Commissioning Strategy Heinz-Dieter Nuhn, SLAC / SSRL August 11, 2004 Undulator Overview FEL Parameters Diagnostics and.
XTOD Layout and Diagnostic Systems
XTOD Attenuator Status
X Ray Transport, Optics, and Diagnostics Overview
P. Emma, for the LCLS Commissioning Team LCLS DOE Review May 14, 2009
LCLS Lehman Review February 7-9, 2005
Lehman Review: XTOD Beam Transport
LINAC System Engineering / Design Status C.E. Rago
LCLS Control System Personnel Linac & BC2 Controls progress
LCLS Photon Systems Overview
Keith Kishiyama, Marty Roeben Dimitri Ryutov, John Trent and
LCLS Lehman Review February 7-9, 2005
Presentation transcript:

FEE Diagnostics and Commissioning May 14, 2008 This work performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under Contract DE-AC52-07NA27344. This work was performed in support of the LCLS project at SLAC.

LCLS Installation and Commissioning Time-Line First Light in FEE First Light in FEH LTU/Und/Dump Install PPS Cert. LTU/Dump FEE/NEH Install X-Rays in NEH FEH Hutch BO CD-4 (7/31/2010) PEP-II run ends FEH Install now J F M A M J J A A S O N D J F M A A M M J J A S O N D J F M A M J J 2008 2009 2010 Down PPS Linac/BC2 Commissioning Re-commission Inj/BC2 to SL2 LTU/Und Comm. NEH Operations/ Commissioning FEE Comm. April 18, 2008

XTOD Commissioning Diagnostics and Offset Mirrors in the Front End Enclosure (FEE) Slit Fixed Mask Solid Attenuators Reticule K-Monochromator Collimators Thermal Sensor Pop-in cameras C0 collimator (in e- beam dump Gas Attenuator Gas Detector Beam Direction Direct Imager (Scintillator) Pop-in cameras Gas Detector FEL Offset Mirror Systems

FEE pre-beam commissioning I (Mar-May 09) FEE HVAC System Checkout EPICS Control System Checkout Network, Timing, and Server functionality Basic IOC startup Common Services Archiving Logging gateways to/from e-beam Basic Services Checkout Air system / valves Water cooling SOMS/HOMS temperature control Vacuum pump down of all devices PLC ladder logic checkout EPICS control and monitoring of controllers Full cycles for instruments State control for Gas Detector/Attenuator

FEE pre-beam commissioning II (Mar-May 09) Verification of individual Device Operation Slit Motion control Gas Detector/Attenuator Pressure control Solid Attenuator control PMT & APD digitizer operation (triggering) and HV control K monochromator Photodiode digitizer operation (triggering) Thermal sensor Cooling control Laser energy measurement and triggering Sensor digitizer operation (triggering) Direct Imager Camera operation (triggering) with UV illuminator

FEE Commissioning with Spontaneous, Single Undulator (May 09) RP Survey Measure centroids with Direct Imager Check positions of apertures Fixed Mask, Slits, C0

FEE Commissioning with Spontaneous, All Undulators at 13 FEE Commissioning with Spontaneous, All Undulators at 13.64 GeV (May-Jun 09) RP survey and verification of apertures Insert reticule and center Commission Pop in 1 Verify position of collimators Align Gas Attenuator Apertures Commission Gas Detector Commission Thermal Sensor Commission K-Monochromator Measure flux in fundamental

Hard X-Ray spontaneous, all undulator segments, viewed by Direct Imager Absorbed in 50 microns YAG

Measurements of Direct Imager YAG yield: 12 ± 3 photons / keV Optic Camera Vacuum window Ion chamber 1 Attenuator YAG Ion chamber 2

Reticules in Direct Imager 1 mm reticule 100 micron reticule

Reticules in Pop-in cameras

Alignment of Attenuator apertures with Direct Imager

Align Soft x-ray mirrors (Jun-Jul 09) Use Pop-in cameras with Spontaneous A pop-in camera exists behind each mirror Pop-ins can see reflected and not-reflected beam Measure distance between reflected and non reflected beam to set angle Translate mirror to center beam on mirror Alignment can be performed with spontaneous radiation

Simulations of Pop-in imagery Dy = -1.737 mm q = 12.9 mRad q = 13.9 mRad q = 14.9 mRad 8 mm Dy = -0 mm 10 mm

FEE Commissioning at low energy (4.3 GeV) (Jul-Aug 09) Find beam center with 9th harmonic using K-monochromator With Soft X-FEL Use Direct Imager, no apertures “See” FEL at ~ 100 nJ K measurement of undulators (if necessary) Optimize FEL to 50 micro J Align gas attenuator and gas detector Continue optimizing FEL pulse energy and measure attenuated FEL with Direct Imager Measure absolute pulse energy with thermal sensor Calibrate Gas Detector with Thermal Sensor Calibrate Direct Imager with Gas Detector

9th harmonic at 4.3 Gev through K-mono viewed by Direct Imager

Soft X-Ray Spontaneous all undulator segments, viewed by Direct Imager Absorbed in 5 um YAG,

Soft X-Ray FEL signal in Direct Imager Absorbed in 5 um YAG, Peak pixel has 160 photoelectrons / nJ of FEL

High level control software Direct Imager Image display, peak finder and centroid calculation, pulse energy measurement, stage motion, camera settings, focus, UV lamp and illuminator, cross calibration with Gas Detector (MATLAB/EPICS) Gas Detector Waveform display, peak finder, prompt signal removal, cross calibration with Thermal Sensor, pressure control, pulse energy measurement, phototube HV (MATLAB/EPICS) Thermal sensor Waveform display, sensor selection and positioning, peak finder, calibration with laser, prompt signal removal, R vs T measurement, pulse energy measurement (MATLAB/EPICS)

High level control software (cont.) K-monochromator Waveform display, quad cell positioning, quad cell pulse position calibration, removal of prompt signal, total pulse energy measurement, crystal pitch angle, crystal placement (MATLAB/EPICS) Acquire pulse energy, shift photon energy, plot undulator spectrum, move undulator, maximize slope (Paul Emma’s group) Pop-in cameras Image display, cross hair position extraction, camera control, scintillator positioning (EPICS) Slit Aperture width, aperture center (EPICS)

High level control software (cont.) Gas and Solid Attenuator Pressure, solid attenuator selection, stage control, apertures in/out control (EPICS) Others Reticule positioning, SOMS and HOMS transverse position and angle, vacuum and isolation valve monitoring and control (EPICS)

Commissioning Manpower PIs R. Bionta (Direct Imager, Pop-ins) S. Friedrich (Thermal Sensor) S. Hau-Riege (Gas Detector) S. Shen (Gas Attenuator) T. McCarville (Mirrors) E. Ables (Electronics) P. Stefan (Mirrors, K-Monochromator) Software S. Lewis (EPICS lead, vacuum, attenuator, and motion controls) L. Ott (Direct Imager and K-mono MATLAB, EPICS, Simulations) K. Fong (EPICS, Photon Monte-Carlo) C. Gardner (Thermal sensor MATLAB) S. Hau-Riege (Gas Detector MATLAB)

Summary FEE diagnostics will be ready for installation November 2008: Fixed Mask, Slit, Gas Detector, Attenuators, Direct Imager, Thermal Sensor January 2009: K monochromator, SOMS/HOMS mirror system and Pop-ins Initial checkout of FEE instruments without beam in Mar-May 09 Controls, motion, vacuum, pressure, calibration laser Initial commissioning and alignment of FEE instruments with high-energy spontaneous in May-Jun 09 Direct imager, Attenuator, Gas Detector, Calorimeter, K-Monochromator Mirrors will be aligned with spontaneous in Jun-Jul 09 Using Pop-in cameras Low energy FEL will be commissioned in Jul-Aug 09 Direct Imager will be main diagnostic for finding FEL