Minuteman Vocational Technical Regional High School Progress

Slides:



Advertisements
Similar presentations
WEEKLY PHOTO REPORT WEEKLY PHOTO REPORT September 16 th, 2013 – October 25 th, 2013.
Advertisements

Confidential. ©ARXX Corporation 2010 Insulating Concrete Forms.
PARKVIEW APARTMENTS 20 Unit Rehabilitation & Site Work ISLA VISTA, CA. Joint Cities-County Affordable Housing Task Group October 23, 2008.
ENERGY STAR Qualified Homes
THE PROJECT BRIEF… BUILD A CONTEMPORARY HOME ON A SMALL INNER CITY BLOCK WITH NO ROOM FOR ONSITE STORAGE OR SCAFFOLD.
Update on FCPS Construction/Renovation Projects August 2009.
April 21, 2010 Barbara C. Jordan Elementary School Update Presented by.
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
FATALITY REPORT 10/01/03 – 09/30/04. FY - 04 Fatalities By Area Office 267 Total Atlanta East = 20 Atlanta West = 29 Birmingham = 27 Columbia = 2 Ft.
Civil Engineering & Architecture 2.3 Residential Design.
October 2009 Construction Progress. University City School District Bond Wolfe Architects – architect McCarthy Construction – construction manager Barbara.
Leestown Middle – Renovation Architect: Lucas/Schwering Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010 GC Contract.
EXTERIORS FOR WOOD LIGHT FRAME CONSTRUCTION
Interior and Exterior Demo Continue Dust Control Measures for Air Quality Management Per LEED Construction Plan 4/16/12 – 4/20/12 Iconic Birdcage Removed.
NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). DWG. / PHOTO. NO. DATE:
CDAE 170 Solar Building Strategies Class #7 Oct. 18, 2003 Gary Flomenhoft BSME, MAPP, CEE Research Associate Gund Institute, SNR.
TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]
7 Set of Floor Plans Primary Considerations
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
MAIN ENTRANCE SOUTH EAST VIEW NORTH EAST VIEW.
Energy Performance and Moisture Control of Ceilings and Roofs 1.
Construction Update August 18, 2010 Rob Gaertner, P.E. Director of Facilities.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
1 HVACR116 – Trade Skills Plan Views Elevations Plan Views Elevations.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
Many thanks to Henry and Kristen. We are glad to have you as friends and happy to be your contractors.
Progress Photos Goodnoe Elementary School Additions and Renovations Project November 2013 Goodnoe Elementary School.
Building Plans.
Winchester Medical Center Campus Expansion June 21, 2011.
HVACR116 – Trade Skills Plan Views Elevations. Plan Views.
PHOTO. NO.DATE: 12/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P AB HOME AVENUE INTERIOR.
TCUSD New K-5 Construction PROJECT UPDATE NOVEMBER 4,
Project Status The project is progressing well with both grading aspects and building components. The mason has erected many walls to “scaffold high”
North Augusta High School Design Development Presentation.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
South Halls: Ewing-Cross Renovation AE Senior Thesis: Tech. 1 Quaid Spearing CM Option September 16, 2013.
Elevating the Quality of Life in the District. AFTER RENOVATION BEFORE RENOVATION.
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
October 19, 2011 Construction Progress Report. Construction Progress Report – October 19, 2011 Contract sum to date:$ 162,736,722* Total completed to.
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
Building Resource Inc. Sustainable Durable Buildable Cost Effective
Museum of Islamic Art Project Package # 3 Site Logistics and Progress Presentation.
OTE Building PMG Report October 25, 2012 Rhonda Merchut 1.
1 Update on Off-Campus Development in South County: Update to FPP CAC – August 25, 2015 Siteman Cancer Center Expansion Phase II Development.
Upon completion of this module, you will be able to:
Foundations of Technology Construction
Major Steps In Building a SFR
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Upcoming Activities Fun Fact Click here to view the live WEBCAM
Construction Documents
Capital Improvements Presentation
Graduation Project 2 Redesigning a Villa
Minuteman Vocational Technical Regional High School Progress
Carleton College Summer 2018 Science and Campus Construction Plan
Progress Report 11/10/11.
1 Semester Project Design A Multi Story Office Building
Minuteman Vocational Technical Regional High School Progress
Project Name – ID # 7/1/2009 Current Project Status Project Issues
New White Lake Township Library
Foundations of Technology Construction
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
North Augusta High School – Phase 2A and 2B
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Presentation transcript:

Minuteman Vocational Technical Regional High School Progress September 17th, 2018 – October 15th, 2018

September 29th View of Area A & B – East Elevation Installation of Curtain Wall & Glazing in Progress October 15th View of Area A & B – East Elevation FAPA Complete Window Frames & Glazing Complete Metal Panel Framing & Insulation in Progress

October 15th View of Area A & B – North Elevation Install of Metal Panel in Progress October 15th View of Area A & B – Upper Level Installation of in-wall blocking to support drywall activities.

October 15th View of Area G – North Elevation Upper Level Window Frames & Glazing Complete Lower Level Masonry Veneer in Progress

October 15th View of Area E – Courtyard Installation of Curtain Wall Frames in Progress October 15th View of Area E – Courtyard Exterior Framing & Sheathing

October 12th View of Area E – North Roof Level Installation of bituminous roofing assembly in progress.

October 15th View of Area D – Lower Level Rough-in of overhead MEP’s in Mechanical Room Interior CMU wall construction in progress

October 15th View of Area D – West Elevation Masonry Veneer Activities in Progress Site Utilities in Progress

October 15th View of Area E+F – Lower Level Slab on Grade placement for the Cafeteria & Kitchen

October 15th View of Area F – Lower Level Underground utilities and backfill activities in Culinary Kitchen

October 15th October 15th View of Area C – West Elevation Construction of exterior CMU walls in progress. October 15th View of Area C – East Elevation Construction of exterior CMU walls in progress.

October Construction Schedule Look Ahead: Area A+B Complete with installation of waterproofing materials on exterior walls. Complete Masonry Veneer activities. Continue Window & Metal Panel Activities Commence Sheetrocking activities on Upper Level B Area G Complete installation of waterproofing materials on exterior walls. Continue with interior CMU wall construction on Lower Level. Continue Window system installation Commence Sheetrocking activities on Upper Level Area E Complete roofing installation activities. Complete waterproofing activities. Continue Curtain Wall & Window System installation Continue Rough-In of OH MEP’s on Upper & Bridge Levels Continue Wall Framing activities to support MEP’s Area D Complete exterior sheathing activities. Continue Rough-In of OH MEP’s in Mechanical Room & Lower Level. Continue Masonry Veneer activities. Area F Complete excavation and installation of underground utilities. Place concrete slab on grade Commence Masonry Veneer activities. Area C Continue with interior and exterior CMU Masonry walls. Sitework Complete installation of water line loop around perimeter of building. Complete Drainage System installation and connections to the building.