1 UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Board Meeting October 24, 2016

2 Building Area A – South Classroom wing closest to Doe Run Road Area B – Administration Suite, Main vestibule Area C - Gymnasium, Cafeteria, Kitchen Area D – North Classroom Wing

3 Area A - South Classroom wing closest to Doe Run Road
South-East elevation South entrance Classroom near South stair tower Large Group Instruction area looking towards corridor. Main corridor, classroom on left with framing for lockers. Typical classroom

4 Area B – Administration Suite, Main vestibule
Future music classrooms to the left Admin offices first floor, Media Center on 2nd floor. Main entrance structural steel

5 AREA C GYM CAFETERIA KITCHEN Looking through gymnasium.
Gym looking at stage. Cafe in background. Main common area Cafeteria seating area

6 Area D – North Classroom Wing

7 Basement mechanical room and storage area

8 Site work – Bulk of curbing installed, preparing for rough coat of paving