Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.

Similar presentations


Presentation on theme: "Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building."— Presentation transcript:

1 Architect Drawing of New Entrance

2 Location Location of Phase II Construction Project – Old tennis courts west of the existing building.

3 Location View from the bus barn.

4 Location Fenced in with temporary access road constructed on old track.

5 Building Footings are poured for new addition.

6 Utilities Sanitary sewer line connected.

7 Utilities Electrical lines connected.

8 Utilities Water line installed.

9 Parking House being moved to provide more parking.

10 Parking Additional parking will be located east of the maintenance building and existing tennis courts.

11 Building Construction begins on new band room walls.

12 Building Band room walls and hallway to existing building.

13 Building Pre-cast walls for new gym arrive and are unloaded.

14 Building Pre-cast walls being installed.

15 Building Pre-cast walls being installed.

16 Building Pre-cast walls.

17 Building Pre-cast walls viewed from the north.

18 Building Columns for front entrance being installed.

19 Building Roof trusses being installed.

20 Building Roof trusses being installed.

21 Building Roof trusses being installed.

22 Building Roof trusses installed.

23 Building View from the west on July 15 th.

24 New Tennis Court Location Three new tennis courts will be constructed west of the existing tennis courts.

25 4 Stall Garage 4 stall garage needs to be moved for construction of 3 new tennis courts west of existing courts.

26 4 Stall Garage Site cleaned up and prepared for paving of new slab and return of 4 stall.

27 4 Stall Garage Site prepared and ready for concrete.

28 New HS Restrooms The existing art room demo in preparation for new restrooms in the ninth grade hallway.

29 Hallway to New Addition and Storage Room Wall constructed in old chorus room to divide into hallway and storage space.