Reach 4 Air Valve Replacements Award of Construction Contracts

Slides:



Advertisements
Similar presentations
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
Advertisements

Bids ranged from $992,264 to $1,999,305 JO-SH General Engineering was apparent low bidder Lash Construction 2 nd $1,156,453 Construction to start.
AWARD OF CONTRACT FOR CONSTRUCTION OF MASTER DRAINAGE FACILITY LINES D & D1 CIP NO City Council Meeting December 20, 2011.
1 Construction Cost Impacts Florida DOT Experience Greg Davis State Estimates Engineer Florida Department of Transportation Greg Davis State Estimates.
Design Build, Job Contracting, or Construction Manager at Risk In early 2000 the legislators added an alternate way to accelerate construction project.
Water Treatment Plant No. 2 Concentrate Zero Liquid Discharge August 30, 2011.
Finance Tasha Robinson Director of Finance (803)
CO# OS POSITIVE TRAIN CONTROL PROJECT Change Order #4 October 17, 2013 Related to Agenda Item 11.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Franczek.com Copyright © 2011, Franczek Radelet P.C. All Rights Reserved. Disclaimer: Attorney Advertising. This presentation is a publication of Franczek.
AWARD OF CONTRACT FOR CONSTRUCTION OF CALIFORNIA OAKS ROAD AT I-15 INTERCHANGE CIP NO City Council Meeting January 18, 2011.
Professional Engineering Procurement Services Division Solicitation No. 15-5RFP5004 Donella Drive Improvements Project Status Presented By: Kyle Gass,
C-4 Canal Bank Improvements Belen Phase 2 Flood Protection Berm & Wall John Mitnik, P.E. Engineering & Construction Bureau Chief John Mitnik, P.E. Engineering.
Alternative Rate Structure Paul Smith Vice President, Rates Duke Energy Ohio June 20, 2006.
EASTERN MUNICIPAL WATER DISTRICT County Water Company Consolidation Project Greg Kowalski, P.E. Senior Civil Engineer April 1, EXHIBIT.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Regional Water Reclamation Facility 23-MGD Expansion Project Joe Mouawad, P.E. Senior Director.
PORT OF TACOMA. Contract Increase & Award Pier 7 Structural Repairs Request authorization to expand the scope of existing A/E Contract No and.
Aaron Cosentino City of Elgin Rob Linke, P.E., CFM Trotter & Associates, Inc. Lord Street Basin CSO Green Infrastructure Retrofit Project November 14,
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Recycled Water Pipeline Joe Mouawad Sr. Director of Engineering September 2, 2015.
SEWER TRUNK LINE REHABILITATION PROJECT (Alexandria Place, Black Oak and Navy Drive) COUNCIL AGENDA ITEM 14.1.
1 EASTERN MUNICIPAL WATER DISTRICT Cactus II Feeder Transmission Pipeline Joe Mouawad, PE Sr. Director of Engineering September 2, 2015.
Las Cruces International Airport RESOLUTION A: A RESOLUTION APPROVING THE AWARD OF A CONTRACT FOR DESIGN THROUGH BIDDING PHASE SERVICES FOR AN.
1 EASTERN MUNICIPAL WATER DISTRICT Quail Valley Sewer Improvements Sub-Area 9, Phase 1 Joe Mouawad, P.E. Sr. Director of Engineering October.
Newport Beach City Council Meeting January 22, 2013 Agenda Item No. 16.
Approve Change Order No. 4 for the Caylor Wholesale Meter Modification Item 4B.
1 | emwd.org AquaSel Brine Concentration Demonstration Project Khos Ghaderi, P.E. May 18, 2016.
PORT OF TACOMA. Agreement Lincoln Avenue Grade Separation – Utility Relocation Request authorization for the Executive Director to Execute an Agreement.
1 | emwd.org Indirect Potable Reuse (IPR) Public Outreach and Preliminary Design Services Joe Mouawad, P.E. and Jolene Walsh August 11, 2016.
1 EASTERN MUNICIPAL WATER DISTRICT Public Access Areas Renovation Project Debbie Hoffman, PE Civil Engineer II, Project Engineer July 1, 2015.
Pier Partial GMP Proposal for Marine Structural June 1, 2017
Reject all bids for Citywide Tree Trimming Services and authorize increases to Contracts No. 21,628 and No. 21,629 with George Salinas Tree Preservation,
TVRWRF 23 MGD Expansion Disinfection System Conversion
U.S. Air Force Cooperative Agreement for Perfluorinated Compounds Response Activities Jayne Joy, P.E. February 9, 2017.
Holly Street Bridge Retrofit and Rehabilitation Project
Pre-Bid/Proposal Meeting
Sun City Lift Station Odor Control Improvements
City of San Jacinto 7th Street Pavement Repairs
Light Rail Transit Project
Quail Valley Subarea 9, Phase 1 Sewer Award of Construction Contracts
Joe Mouawad, P. E. September 7, 2016
Well 38 Drilling & Testing Amendment
Cottonwood Recycled Water Pipeline (West)
Winchester Lift Station Odor Control Project
Analysis and Calibration of Sewer Flow Tenant Type Factors
Audie Murphy Road Sewage Lift Station Award of Construction Contracts
Case Road Sewer Joe Mouawad, P.E. October 27, 2016.
Perris Water Filtration Plant Membrane Upgrade – Phase I
U.S. Air Force Cooperative Agreement for Perfluorinated Compounds Response Activities, Phase 2 (ESCA II) Jayne Joy, P.E. July 18, 2017.
District-Wide Well Maintenance, Rehabilitation, and Repair
Memorandum of Understanding with GE Osmonics, Inc
College II Tank Interior Recoating Award of Construction Contracts
SJVRWRF Dewatering Building Corrosion Remediation
Voice Radio System Replacement Project
Phase 3 Solar Feasibility Study Findings and Recommendations
Cost of Service Analysis & Rate Design
Mountain Avenue West Recharge Basin Project
Phase 3 Solar Renewable Energy Initiative - Site Improvements
Santa Ana River Conservation and Conjunctive Use Program: Program Development Phase Costs Brian Powell, P.E. 8/17/2016.
City-wide LED Street Light Conversion Program
Wimberley Wastewater Treatment Plant Project
Galt Court Water Main Replacement
Schedule of Taxes, Fees, and Charges Annual Update Fiscal Year 2017
FY 2018 – FY 2022 Project Priorities Florida-Alabama TPO
MULTISPORTS CENTRE PRESENTATION
Richland Creek Water Supply Program Program Update
Ward Park Restroom Timeline
Authorizing ED to Reject Bid for Contract P01005C10
Contract Award for the Colorado Street Bridge Suicide Mitigation Enhancements Project City Council May 20, 2019 Item # 7.
Request for Qualifications (RFQ) Architectural & Engineering Services for Seattle City Hall Plaza Restoration CDCM # Presubmittal Conference June.
HOME AFFAIRS IDENTIFICATION SYSTEM (hanis)
Presentation transcript:

Reach 4 Air Valve Replacements Award of Construction Contracts Marc Serna, P.E. October 26, 2017

Background Reach 4 Pipelines 9 miles SCRWRF to City of Lake Elsinore Parallel steel pipelines 54-inch Recycled Water Pipeline 30-inch Brine line Five original below grade air valves identified as corroded and beyond their useful life. Site 10 – 16-inch AV, 8” AV Site 1 – 2-inch AV Site 2 – Two 2-inch AV Eliminate confined space.

Construction Scope Schedule Remove existing below grade air valves Install piping modifications Install air valves above grade Install enclosures Schedule Contract Start November 2017 210 day construction period Contract complete June 2018 Rch 4 – Site 10 Rec Water AV Rch 4 – Site 10 Brine AV (check valve)

Bid Results August 29, 2017 – Only one responsive bid in the amount of $159,000 September 21, 2017 - Bid documents revised and rebids solicited from: Genesis Construction Jeff Carpenter, Inc. Trautwein Construction, Inc. Utah Pacific Construction October 17, 2017 – Four Bids Received Genesis Construction $171,052 C.P. Construction, Inc. $161,750 Don Peterson Contracting, Inc. $170,925 Paulus Engineering, Inc. $114,330 Engineer’s Estimate: $155,000 C.P. Construction, Inc. Don Peterson Contracting, Inc. Schuler Engineering Corp. Paulus Engineering, Inc.

Recommendations Execution by the General Manager, or his designee, of the District’s standard form of contract with the lowest responsive bidder, Paulus Engineering, Incorporated, in the amount of $114,330; Rejection of all other bids received under Specification No. 1321P – Rebid except the second lowest bid; and Administrative Award and Execution by the General Manager, or his designee, of the District’s standard form of contracts with the necessary consultants, contractors, and suppliers for construction of Reach 4 Air Valve Replacements. Project funding is included as part of the District’s FY 2017-18 Operating Fixed Asset (OFA) Budget. No additional appropriation is requested at this time.

Contact Information Marc Serna, P.E. Director of Engineering (951) 928-3777 Ext. 4461 Email: sernam@emwd.org