22/09/2011 ADO-PO section meeting ADO : Atlas Detector Operation PO : Project Office R. Vuillermet.

Slides:



Advertisements
Similar presentations
Atlas standard opening ATLAS Project Document N°: ATL-HT-OP-0014 EDMS id Created : January 13 th, 2009 Modified : Main document Overall view of.
Advertisements

ITS /MFT installation concept CERN 27 September 2012 Corrado Gargiulo.
ESS Pre- Operations Dave McGinnis Accelerator Division/RF Group.
DCal Meeting
Design Office meeting Design office meeting.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
1 IBL Integration Activities & Future plans  Overall FEA on Geneva (in convergence with Seattle)  News from IST Composite Design  Integration.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
+ STAR HFT Upgrade – Installation and Integration Rahul Sharma Brookhaven National Laboratory.
AdV VAC design meeting Cascina, 19 July Agenda first discussion about vacuum design of central area - and pickoff chamber design in particular -
FP 420 Connection Cryostat Design and Integration Keith Potter, Jaak Lippmaa, Guido Ryckwaert, Benoit Florin, Thierry Renaglia, Thierry Colombet, Shrikant.
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
Visit Gangway FromLHBIEP__0181 by Andre Coin ~ 2600 GANGWAY POSITION.
Notes After TIG 17/7/08 HF+ Move out of garage: Aug 15* Platform+table+collars+racks+BP support (jack up for platform) = 3 days Controls for motors = 1.
ATLAS EXPERIMENT INTEGRATION TASK: SPACE MANAGEMENT Tatiana Klioutchnikova 05/06/
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
CERN, Main challenges for the ATLAS upgrade project in the coming year.
WG3 Insertion/Extraction Testing Program R. Vuillermet 11/04/20111.
1 Safety and Database Subsection ADO - PO - SA Safety achievement and future activitiesSafety achievement and future activities Database (see K. Pommes.
Technical Support Activities in PH-ADO-PO
Positioning fork M. Ciappeti R. Vuillermet 29/09/20111.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
Michel RAYMOND – April 14 th, 2011 Technical Support Activities in PH-ADO-PO Goals for 2011.
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
How 3D models and photos are organized in the database ADO-PO meetingTatiana KLIOUTCHNIKOVA.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
ADO-PO Section Meeting Safety Group LS1 Shutdown Safety Organization.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
1 Safety and Database Subsection ADO - PO - SA Main safety projects / activities Main safety projects / activities RP issues RP issues Patrols Patrols.
Section Meeting: TC overview. Outline TCn organization TCn activities – Maintenance and new installations Short term priorities Mid Term priorities Long.
ATLAS closing scenario  Where we are  What is still be done before closing (ADO-PO support)  Closing scenario / Procedure / Schedule Prepared by Michel.
Michel RAYMOND – July 1 st, 2013 Technical Support Activities in PH-ADO-PO Summary of 2013 activities.
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
Project Office Activities R. Vuillermet 08/09/2015R. Vuillermet PH-ADO-PO1.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
Status on closing operations End cap calorimeter side A Forthcoming operations ATLAS – April 17th, 2009 Prepared by Michel RAYMOND.
Michel RAYMOND – December 7 th, 2012 Technical Support Activities in PH-ADO-PO Statement of 2012 activities Schedule & Organization on LS1.
2/20/ PHENIX WEEKLY PLANNING Feb. 20, 2014 Don Lynch.
DCal-ALICE integration and installation plan and status A. Tauro.
10 December Summary: Updating of the activities carried out on-site (Done) in NOVEMBER List activities on going (Next steps) and scheduled for DECEMBER.
ATLAS ID Services Mock Up - Proposal Presented by Ian Wilmut at DESY, update from John Hill 4th May, 20101ATLAS Upgrade - RAL.
Detector Safety System overview DSS is a PLC based system designed to protect ATLAS detector from damages. Front end (hardware) 2 redundant PLC ~700 input.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
Kitakami Side AHCAL Assembly or anywhere in any detector.
ATLAS Safety – EYETS 2016/2017 EP-ADO-PO Section Meeting 
ADO-PO / TC meeting 1st December 2016
ADO–PO/TC Meeting Safety Activities
ADO-PO / TC meeting NJD/NSW Assembly Raphael Vuillermet.
ATLAS ITk Baby-DEMO update
IBL project for DT Science-Techno Tea
LBNF CAD models, Drawings and Component list
ADO-PO section meeting. ADO : Atlas Detector Operation
TC activities.
Service channels between Tracker and PP1
Francois and Lau EATM 17 July 2012
INSTALLATION SEQUENCE
CMS Area Working Group Meeting
Technical Support Activities in EP-ADO-PO
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
Far Detector Activities Late 2017 – Early 2018
ATLAS ITk CO₂ Cooling pipe routing Common Mechanics meeting
Initial BIS installation
Technical Support Activities in PH-ADO-PO
Installation plans from mid 2005
Update on ATLAS insertable B-layer
SC1R Cold Box PDR Assembly Sequence
Presentation transcript:

22/09/2011 ADO-PO section meeting ADO : Atlas Detector Operation PO : Project Office R. Vuillermet

22/09/2011 Content of the meeting 1. Winter shut down activities and schedule (Michel) 2. Design office involvement during the winter shut down (Raphael) 3. Installation of EE chambers (Giancarlo) 4. Safety activities (Olga) 2

Design office activities 3 main activities 1. Provide the technical and engineering support for the ATLAS technical coordination 2. Provide the technical support for operation task (winter shut down) 3. Provide engineering support for upgrade activities development Current resources in the design office : Tatiana Gevorg Denis Alexander Giancarlo Erik Sebastien Aboud Wim Marco Dimitar Raphael 22/09/2011 3

1- Engineering support for ATLAS TC JFC1 lifting tool (Denis, Dimitar, Raphael) Company for fabrication was selected Production drawings are under approval and cross check Delivery by 15 th of November at CERN to be used during the winter shutdown. Organize and perform the load test at CERN as soon as the tool is delivered 22/09/2011 4

ECT top platform (Wim) Under fabrication in b108 to be available for this winter shutdown for EE chambers installation. 1- Engineering support for ATLAS TC 22/09/2011 5

1- Engineering support for ATLAS TC 22/09/2011 EE chamber installation (Alexander, Erik, Giancarlo) All support installed on C side and ready for installation Tooling fabricated or under fabrication More information in Giancarlo’s presentation 6

1- Engineering support for ATLAS TC 22/09/2011 Additional Shielding elements (Alexander, Tatiana, Giancarlo Spigo) Installation of shielding elements on the End Cap Calorimeter and on the JD Design finished Under production (sub-contracting) to be ready for the end of the year 7

1- Engineering support for ATLAS TC 22/09/2011 Access platform installation Vacuum pump access platform in sector 13 (Alexandre, Tatiana, Raphael) Fabrication done. But modification shall be perform to adapt to the voussoir wings angle Write installation procedure. 8

1- Engineering support for ATLAS TC 22/09/2011 Bridge and Round scaffolding (Gevorg, Michel) Definition of the safety exit in sector 1 and 9 Definition of the round scaffolding extension Definition of the bridge flooring and X stopper Material ordered and received 9

1- Engineering support for ATLAS TC 22/09/2011 Definition of a rail carrier (Gevorg, Raphael) To ease and speed up the displacement of the rails inside the trench during the opening/closing operation Design done Order material and fabrication still to be done before the shut down. 10

2- Provide the technical support for operational tasks Implication of our Design office during the winter shut down : RPE Giancarlo according to Giuseppe schedule Safety shift, according to Olga’s schedule Marco, Erik, Alexandre, Denis, Dimitar, Aboud, Wim, Tatiana Opening/closing operation Michel, Raphael with the help of Aboud, Marco, Dimitar, Installation operation (EE chambers, platforms, shielding, etc.) Michel, Aboud, Marco, Dimitar, Giancarlo, Raphael Data taking activities for Design Office Tatiana, Alexandre, Denis, Wim, Erik, Aboud SLIMOS (in function of our availability and need) Tatiana, Marco, Dimitar, Giancarlo, Aboud (to be trained), Raphael 22/09/

Verification and measurement activities (Erik, Raphael, Tatiana, Aboud, Marco) The purpose of this work : Verify real distances and available volume to validate CAD models and current design in particular for : The Optobox size and localisation The services routing (electrical, cooling, signal) The tooling movement inside the Barrel toroid Project involved : nSQP IBL Visitor cage Shielding Small Wheel Access platform Service rooting Preparation for the upgrade phase 1 opening Etc. It is important to list all thess tasks before the winter shut down to be sure not to forget anything. You will be invited to make such a list. 3- Upgrade activities 22/09/

3- Upgrade activities 22/09/2011 IBL mock-up construction and exploitation (Francisco, Louis, Marco, Erik, Raphael) Good progress on the mock up construction and installation of the tooling. Test of the different tooling (from Grenoble, Brandeis and Seattle) is starting now and will last until the end of the year to give a feed back to the ATLAS management on the feasibility of in-situ extraction. This activity will run in parallel to the winter shut down 13

3- Upgrade activities 22/09/2011 Design, prototyping, fabrication and test shall continue during the winter shut down to be in time with the project schedule nSQP (Sebastien, Erik) Optoboard and services routing Sealing barrier Etc. IBL (Marco, Aboud, Denis, Raphael) Test on the tooling for the extraction/insertion in-situ (mock up) Start the engineering work on the tooling required for the surface integration Develop the sealing rings Integration of the services around the beam pipe with their various supports Design, prototype and test the z stopper on the IST Perform the CAD integration work. 14