Charles University in Prague Institute of Particle and Nuclear Physics Brief presentation Zdenek Dolezal.

Slides:



Advertisements
Similar presentations
Peter Kodyš, March 21, 2006, DEPFET workshop, Prague, Status in Prague1 Charles University Prague Pavel Bažant, Zdeňka Broklová, Jan Brož, Zdeněk Doležal,
Advertisements

Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
ITk Kick-off meeting, 4th November 2014Vaclav Vrba / Zdenek Dolezal / Miroslav Havranek 1 Participating institutions: Institute of Physics, Academy of.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
ATLAS Module building at Glasgow
The LHCb Inner Tracker Marc-Olivier Bettler SPS annual meeting Zürich 21 February 2007.
1.ATLAS and ID 2.SCT 3.Commissioning 4.Integration 5.Latest Runs 6.Conclusions Commissioning the ATLAS Silicon Microstrip Tracker IPRD08 - Siena Jose E.
The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
IFIC, Valencia Charles University, Prague Peter Kodyš, September 14-16, 2004, RD50 – Workshop Florencia1 Laser.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
Shulamit Moed Vertex 2004, Como, September 20041page EndCap Module Production of the ATLAS semiconductor tracker (SCT) ATLAS SCT layout and specifications.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Charles University in Prague Institute of Particle and Nuclear Physics Brief presentation Zdenek Dolezal.
Institute of Physics ASCR, Prague Strip Sensors R&D for SCT and ITk Marcela Mikeštíková.
ATLAS Tracker Group PPD Staff Talk 28/Nov/ ATLAS SCT Builders Inc Annual Report Mike Tyndel (Group leader & SCT Project Leader) –Richard Apsimon.
20/04/2012Rui De Oliveira1 20/04/2012. Rui De Oliveira2 30 cm x 30 cm example.
Charles University in Prague Institute of Particle and Nuclear Physics Brief presentation Zdenek Dolezal.
LPNHE activities Contribution in the development of an assembly line for highly granular calorimeters with semiconductor readout Gluing robot system Metrology.
Muon trigger upgrades, missing since not aimed towards DOE funding PHENIX upgrades: view presented to DOE R&D $3.5M Construction $16.6M Au-Au p-p 200 Si-Si.
Y. Ikegami, T. Kohriki, S. Terada Y. Unno (KEK), K. Hara (Univ. of Tsukuba) G. Barbier, F. Cadoux, A. Clark, D. Ferrere, S. Gonzalez-Sevilla, D. La Marra,
Andy Blue Glasgow Update. Andy Blue WP3 Meeting Summary ESD Protection –Part all arrived and installed Compressed Air Controls –New lines and panel being.
8 July 1999A. Peisert, N. Zamiatin1 Silicon Detectors Status Anna Peisert, Cern Nikolai Zamiatin, JINR Plan Design R&D results Specifications Status of.
BNL Role In ITK 1.Current R&D Roles 2.Proposed Production Role 3.Activities now until TDR (early 2017) 4.Resources and Infrastructure 5.Personnel 1 D.
Octobre MPI Munich VFCAL Report W. Lohmann, DESY Laser alignment system Infrastructure for sensor diagnostics Sensor test facilities FE design Labs.
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
FVTX Wedge Assembly WBS , , , , , David Winter Columbia University FVTX Wedge Manager.
Peter Kodyš, SCT Week Valencia, Juni 13, Charles University.
Charles University Prague Charles University Prague Institute of Particle and Nuclear Physics Absolute charge measurements using laser setup Pavel Bažant,
Phase 2 Production Discussion We would like to review the conclusions reached at Caltech on US involvement in the phase 2 outer tracker This will be presented.
August DESY-HH VFCAL Report W. Lohmann, DESY Infrastructure for sensor diagnostics FE Electronics Development Sensor test facilities Laser Alignment.
ATLAS: Hardware and Upgrades Liverpool, HEP Christmas Meeting 17 December 2007 Paul Dervan.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
June , RD50 Workshop1 Jan B o hm, Jan Brož, Zdeněk Doležal, Peter Kodyš, Petr Kubík, Marcela Mikeštíková Neutron irradiation program in Prague Charles.
Peter Kodyš, October 10, 2005, DEPFET workshop, Munich, Laser testy – status in Prague1 Peter Kodyš, Zdeněk Doležal, Pavel Řezníček, Zbyněk Drásal, Jan.
Juan Valls - LECC03 Amsterdam 1 Recent System Test Results from the CMS TOB Detector  Introduction  ROD System Test Setup  ROD Electrical and Optical.
Towards the Work-package with LHCb for the LHCb upgrade DT-LHCb coordination meeting 13 January 2015.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
Eija Tuominen, coordinatorHIP/UH Detector Laboratory, October 2010 DETECTOR DEVELOPMENT at HELSINKI DETECTOR LABORATORY Detector Laboratory is a joint.
1/20 LHCb upgrade, Jeroen van Tilburg Nikhef Jamboree, 14 Dec 2015 Preparing for the LHCb upgrade.
Liverpool March 09 Irradiation Meeting. Graham Beck (QMUL) 1 Dissipated Power: Sensor (at -10C, 200V bias, after protons/cm 2 ) ~ 1W (×3 for.
Charles University Prague Institute of Particle and Nuclear Physics Zdeněk Doležal, Peter Kodyš, et al.
Berkeley status Aug 10th, 2012.
Santiago in DEPFET for SUPERBELLE
HV/HR CMOS in Oxford: Facilities, experience, and interests Arndt, Bortoletto, Huffman, Jaya John, Nickerson, Placket, Shipsey, Vigani.
Advanced hybrid detectors in Oxford: Facilities, experience, and interests Arndt, Bortoletto, Placket, Shipsey.
MODULE QUALIFICATION STATUS AT LIVERPOOL
ICHEP02 Chris Parkes ALICE m2 Pixels+Drift+Strips LHCb m2
Kröhnke, 14 November 2012 FCAL Collaboration Meeting Sergej Schuwalow
DAQ for ATLAS SCT macro-assembly
Status Caltech meeting – discussions of assembly centers, US responsibilities We will try to organize a PS module assembly workshop at Brown April 30 –
Constructional requirements from ITk-Strips
HR-HV CMOS activities and plans at Glasgow
The UHH Detector Laboratory
Database requirements from ITk-Strips for DAQ loads
Status of International Collaboration for CEPC Detectors R&D
ATLAS ITK WP3 WP3 Bi-weekly meeting
Group meeting, 2nd Sept, 2013; JAW
Silicon Strip Detector on ATLAS
2017 AFP Beam Tests AFP has 1 week as main user and will also measure together with ATLAS ITk Pixel in H6B -> 2 periods of ~3 weeks
ROD assembly and test in US
UCSB Short-term Testing Plan
Results from module testing
RPC Detector Control System
First Assembled Rod in US
UCSB Short-term Testing Plan
アトラスシリコン半導体飛跡検出器:ATLAS Silicon-strip Tracking Detector
High Rate Photon Irradiation Test with an 8-Plane TRT Sector Prototype
Peter Kodyš, Zdeněk Doležal, Jan Brož,
Setup for testing LHCb Inner Tracker Modules
Presentation transcript:

Charles University in Prague Institute of Particle and Nuclear Physics Brief presentation Zdenek Dolezal

ATLAS tracker module development (kapton hybrids with FR) testing (laser, source, beam) QA of 200 endcap modules QA coordination, CEC production coordination SCT now: operation, LV card and fan tray maintenance 20/05/14Charles U: presentation2

Infrastructure Clean room class 100,000 Laminar boxes Chillers, dry air systems, environmental monitors Laser and beta source test setup Motion stages Manual probe station Semiautomatic wirebonder Various R/O systems 20/05/14Charles U: presentation3

ATLAS Upgrade Strip sensor R&D (irradiations, CCE tests) Inner Tracker modules: assembly (learning) Readout system installation (HSIO) 20/05/14Charles U: presentation4

5Peter Kodyš, May 18, 2014 Arrangement in lab 1.Testing black box 2.HSIO readout 3.Readout PC 4.LV+HV PS 5.HSIO powering 6.Scope 7.Chiller 8.Vacuum pump

6Peter Kodyš, May 18, 2014 Module under test 1.Module Sensor with hybrid 2.Readout board 3.LV powering board 4.HV power 5.Cooling 6.Vacuum 7.Laser with 3D positioning or radioactive source

Leakage Current – IV Scan to 500V – Long Term Leakage Current Stability Metrology – In-Plane Survey (X & Y) » Hybrid rotations on module – Out of Plane Survey (z) » Module Bowing » Hybrid Glue Heights Electrical Tests – Bypass Functionality, Pipeline Efficiency, Strobe Delay, 3 point gain, Trim Range, Response Curve, Noise occupancy, Time walk Scan Thermal Cycling – Thermal Shock Long Term Electrical Tests QA of the completed module Not Needed New to the HL-LHC November Z. Dolezal, Petalet Meeting AUW2013 CERN7 QA w.r.t. SCT

ChU potential ITK contribution QA: – Process definition – Module testing Personnel: – engineers, 2x0.5 FTE – Postdoc: 0.8 FTE – Physicists 4x0.2 – Students 20/05/14Charles U: presentation8