26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.

Similar presentations


Presentation on theme: "26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan."— Presentation transcript:

1 26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan

2 26-Feb-16S.Movchan Straw manufacturing and QC2 Bld. 217: common view Module entrance

3 26-Feb-16S.Movchan Straw manufacturing and QC3 Bld. 217 Staff entrance Gate in front of straw module assembly area

4 26-Feb-16S.Movchan Straw manufacturing and QC4 Straw module 3 assembly halls Assembly area 1 Assembly area 2 Vacuum test Wiring Connectivity Gas tightness HV test Cosmic test Frame assembly

5 26-Feb-16S.Movchan Straw manufacturing and QC5 Hall and 2 rooms: common view Total: ~ 250 m2

6 26-Feb-16S.Movchan Straw manufacturing and QC6 Main hall Crane: 1.0 tone height ~ 4.5 m S ~ 150 m2 ( 9 x 16.6 m) Condition system

7 26-Feb-16S.Movchan Straw manufacturing and QC7 Module glue @ Vacuum tests area S ~ 40 m2 ( 5 x 8 m) Entrance gate 3x2 m

8 26-Feb-16S.Movchan Straw manufacturing and QC8 Straw module assembly area S ~ 40 m2 ( 5 x 8 m)

9 26-Feb-16S.Movchan Straw manufacturing and QC9 Rooms 1 @ 2 (wiring and cosmic test) S ~ 50 m2 ( 5.4 x 9 m) S ~ 50 m2 ( 5.4 x 9 m)

10 26-Feb-16S.Movchan Straw manufacturing and QC10 Plans Tooling: module assembly tooling – in manufacture (Dubna, VEMZ, August) vacuum table – order in progress Module: module mechanics manufacture – August 2011, Italy ???? delivery to Dubna - September 2011 ???? Assembly: vacuum stand assembly and tests – August 2011 install module assembly tooling – September 2011 Straws: manufacture about 1000 pc and long term test – July-August 2011 Straw assembly to module: start – October (November) 2011

11 26-Feb-16S.Movchan Straw manufacturing and QC11 Conclusion Dubna NA62 straw modules assembly 3 halls (S ~ 250 m2) – ready Module assembly tooling – in manufacture Vacuum pump and pressure sensors – ok! Vacuum table – will be ordered NEXT steps will be fixed on the July collaboration meeting at CERN ---------------------- Other ????? Straws manufacture (no tape at Dubna) Final module drawings – NO alignment/reference holes in the existing drawings Order module mechanics manufacture at Italy – date and quantity, cost ? Delivery module mechanics to Dubna (by track ?) Module glue procedure (Francisco) Device for actual straw position measurement (like at CERN or …?) Straw glue procedure finalization – August 2011 ? Materials and components: wire, pins, glue, straws supports o-rings, bushes, WEBs, gas manifolds, cowers with front end boards, … Equipment: epoxy dispenser (2-3 pc), crimpers, wiring machine, DAQ, LV, HV, gas rack, …

12 26-Feb-16S.Movchan Straw manufacturing and QC12 aaa