2016 Exploration & Production Winter Standards Conference Subcommittee 10 2015 Workgroup formed to address rewrite:

Slides:



Advertisements
Similar presentations
SC6 Work Group on VR Plugs SC6 Summer Meeting June 27, 2013 Bob Barnett / Jean Brunjes.
Advertisements

1 Accredited Standards Committee C63 ® - EMC Subcommittee 5 – Immunity Stephen R Whitesell SC-5 Chair 11/13/2014.
SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Robert Urbanowski Vice-Chair: Mark Trevithick.
2013 Exploration & Production Standards Conference Subcommittee 10 June 25 & 26, 2013 Capitol Hyatt Regency Washington D.C.
1 Communications Protocols Issues Update System Operator Conference May 1-3, 2012 Columbia, SC Herb Schrayshuen, VP Standards and Training, NERC.
2015 Exploration & Production Winter Standards Meeting SC10 & SC13 Updates January 27-29, 2015 Intercontinental Hotel New Orleans, LA.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 January 2014.
January 26, 2011 TG 3: Oil Mud Testing Procedures While we welcome open participation, non- task group members are asked to hold questions and comments.
June 29, 2011 TG3: Oil Mud Testing Procedures Report To SC13 Exploration & Production Summer Standards Meeting Hyatt Regency San Francisco, California.
A Few Quick Items from AASHTO June 2006 Jim McDonnell, PE Associate Program Director, Engineering.
Committee on Refinery Equipment 2008 Spring Meeting Update Wendy Dominguez, Chair, CRE Member, General Committee on Special Programs.
Current Inspection Process for Operators of Hazardous Liquids Pipelines Rod Seeley OPS SW Region Director May 18, 2005.
API 6A 21 st Edition WG API Subcommittee SC-6 Discussions Valves and Wellhead Equipment.
SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
Kent Grebing, API SC 16 Chair
SC 16 DRILLING WELL CONTROL SYSTEMS API SC18 Report out Session API 2015 Winter Standards Meeting Kent Grebing, API SC 16 Chair.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
TG7 Issues on RP 13D Rheology and Hydraulics Mario Zamora Exploration & Production Standards Conference API Subcommittee 13 June 27 – July 1, 2011.
API SC18 Work Group 2 API Exploration & Production Standards Conference on Oilfield Equipment and Materials Westminster, Colorado June 23, 2009 Ed Durante.
2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA.
API WIWC TG-5   Well Intervention Well Control   Task Group   Winter Conference Update   Alex Sas-Jaworsky P.E   Chairman.
API RP 6HP (draft 5.2) Status Presentation Tech Session II Summer Standards Conference.
API WIWC TG-5   Well Intervention Well Control   Task Group   Winter Conference Update   Alex Sas-Jaworsky P.E   Chairman.
SC 19 Liaison report to SC 18 API Winter Conference 2013 Jimmy Hashem Jan 24, 2013.
SC8 Liaison Report 2014 Exploration & Production Standards Conference API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
Yong-Yi Wang, Chair API 1104 Committee Meeting Washington, DC June 30, 2010 Report of Fracture Mechanics Subcommittee.
API 17N (and Q) Subsea Production System Reliability, Integrity, and Technical Risk Management.
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
San Francisco, CA. SC8 Liaison Report
19th January 2012 Don Wells (Hess)
January 26, 2011 TG3: Oil Mud Testing Procedures Report To SC13 Exploration & Production Winter Standards Meeting Renaissance Worthington Hotel, Fort Worth,
Guidelines Revisions Next Steps April 23, Process to Date Staff and others identified a number of “issues” since guidelines were last approved April.
WG05: Well Abandonments CSOEM – SC 10 – Subcommittee on Well Cements 2016 Exploration & Production Winter Standards Meeting Austin, TX Joe Shine – Chair.
Task Force on Electro-magnetic Compatibility (TF EMC) Status report of TF to GRE-75 Friday, 8 April 2016 Informal document GRE (75 th GRE, 5-8 April.
WG on Composite Cements: Composite cement Annex for API Spec 10A - Ballot Result and Analysis Washington DC, June 2016, Heiko Plack.
WG05: Well Abandonments CSOEM – SC 10 – Subcommittee on Well Cements 2016 Exploration & Production Summer Standards Meeting Washington D.C. Joe Shine –
Office of the State Fire Marshal Pipeline Safety Division
API 2017 Exploration and Production Winter Standards Meeting
API SC 10, Work Group 13 Update:
2017 Exploration & Production Winter Standards Meeting Subcommittee 10
API SC 10, Work Group Update:
API SC 10, Work Group 3 Update:
WG05: Well Abandonments CSOEM – SC 10 – Subcommittee on Well Cements
API SC 10 Task Group on Stage Cementing Collars TG Charge Proposal
TG Chair: Darrin Willauer Baker Hughes
API S64 Summer Conference Update.
2016 Exploration & Production Standards Conference Subcommittee 10
SC6 Work Group on VR Plugs
First 8 slides are what was presented in San Fransisco…
API RP 16ST June 2017 Coiled Tubing Well Control Equipment Systems
API SC 10, Work Group 3 Update:
2016 Exploration & Production Winter Standards Meeting Subcommittee 10
2016 Exploration & Production Summer Standards Conference
Performance Audit Subcommittee Project for ISSAI Level 4 review 66th INTOSAI Governing Board Meeting Vienna, November 5-7, 2014.
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API Summer Standardization Conference
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
WG on Composite Cements: Calgary Meeting 2017
Ms. Kim Adkins, Chair July 26, 2018
2016 Exploration & Production Summer Standards Conference
The OPTN Bylaws Rewrite Project What It Means For You
API Publication Types From “API Document Format and Style Manual” and “Procedures for Standards Development” the following are “standards” 1. Bulletin.
API 10 F.
API SC 10 WG15 Stage Cementing Collars
API SC 10, Work Group 13 Update:
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API SC 10, Work Group 13 Update:
Steering Committee (SC) Mtg.
2018 Exploration & Production Summer Standards Meeting Subcommittee 10
Presentation transcript:

2016 Exploration & Production Winter Standards Conference Subcommittee Workgroup formed to address rewrite:

 API Bulletin E3, 1st Edition, Environmental Guidance Document: “Well Abandonment and Inactive Well Practices for U.S. Exploration and Production Operations”, January 1993 Reaffirmed 2000  This new document will supersede API Bulletin E3, 1 st Edition Workgroup: D Mueller, G Benge, C Gardner, E Cunningham, A Parlipiano, D Stiles, A Garnier, J Heathman, J Edwards, L Galey, J Reid Current Status of API Bulletin E3

 Rewrite Bulletin E3 as a Guideline Document:  Well Abandonment Practices API Bulletin E3 2 nd Edition xxxx, 2016 An abandonment cementing and barrier placement guideline to reside with SC 10 This will not replace upcoming Well Abandonment RP – Joe Shine WG 05 Rewrite will provide a guideline for the permanent and temporary abandonment of active and inactive wells:  Provide a general approach and design considerations for well abandonment Placement and verification of cement plugs Protection of useable water aquifers and isolation of hydrocarbon intervals Does not discuss cement design Does not address specific regulatory requirements Not all inclusive. References to other API documents for detailed information The charge:

 Rewrite of API Bulletin E3 SC 10 workgroup comprised of 9 Operators Group met 4 times since summer meeting in San Francisco Revision includes discussion of placement method(s), and use of cement and mechanical devices to set abandonment plugs Adds a clear definition of the term “workstring” Modified existing and/or added new well bore diagrams for different abandonment scenarios Reference to Standard 65-2 and other prescriptive documents Removal of Inactive Well Program (Appendix A) Removal of Inactive Well Worksheets (Appendix A) Removed Summary of Environmental Legislation and Regulations (Appendix B) Rewriting Glossary to be consistent with new document Summary of progress in the rewrite:

 Completion of document by workgroup by end of Q1, 2016  Document goes to ballot by summer Milestones