WG05: Well Abandonments CSOEM – SC 10 – Subcommittee on Well Cements 2016 Exploration & Production Summer Standards Meeting Washington D.C. Joe Shine –

Similar presentations


Presentation on theme: "WG05: Well Abandonments CSOEM – SC 10 – Subcommittee on Well Cements 2016 Exploration & Production Summer Standards Meeting Washington D.C. Joe Shine –"— Presentation transcript:

1 WG05: Well Abandonments CSOEM – SC 10 – Subcommittee on Well Cements 2016 Exploration & Production Summer Standards Meeting Washington D.C. Joe Shine – Chair 29 Jun 2016

2 Outline April conference call Document outline Document outline with feedback Discussions – Moving Forward Forward plans Joe Shine - WG WA - 2016 E&P Summer Std Mtg – SC10 - CSOEM2

3 Conference call Participants:  Apology  Repsol, Occidental, ExxonMobil, Chevron, ConocoPhillips, BP, Total, Aramco  SLB, BHI, 3M, CurisTec  Company changes Efforts:  Clarified intent of doc use while staying aligned with existing docs  Discussed outline “line-by-line”  Cleaned up items leaning towards regulatory  Temp removed topics to be covered in TR1 re-write  Support of E3 re-write will help populate  Generated a revised document outline 3Joe Shine - WG WA - 2016 E&P Summer Std Mtg – SC10 - CSOEM

4 Document outline after call Introduction  Objectives and scope Applications and operating variables  Formation types, lengths/positions, temp & press, well trajectory, well location, radioactive sources Property/material consideration for barriers  Cementicious, non-cementicious, natural/earth, mechanical, environment Installation  Well geometry, software placement simulations, placement methods best practices Evaluation and verification criteria  Annular – wireline logs and pressure match/post job evaluations  In pipe – physical/mechanical tests, hydraulic tests (positive and negative) Annex  Lab testing, other/TBD 4Joe Shine - WG WA - 2016 E&P Summer Std Mtg – SC10 - CSOEM

5 Feedback Chevron:  Add operational barriers (from RP 96) verbiage  Replace “negative” testing with “in-flow” testing 5Joe Shine - WG WA - 2016 E&P Summer Std Mtg – SC10 - CSOEM

6 Document outline with feedback Introduction  Objectives and scope Applications and operating variables  Formation types, lengths/positions, temp & press, well trajectory, well location, radioactive sources, operational barriers Property/material consideration for barriers  Cementacious, non-cementacious, natural/earth, mechanical, environment Installation  Well geometry, software placement simulations, placement methods best practices Evaluation and verification criteria  Annular – wireline logs and pressure match/post job evaluations  In pipe – physical/mechanical tests, hydraulic tests (positive and in-flow) Appendix  Lab testing, other/TBD 6Joe Shine - WG WA - 2016 E&P Summer Std Mtg – SC10 - CSOEM

7 Moving forward 1 Scope 2Normative References 3Terms, Definitions, Symbols 4Applications and operating variables 4.1 Formation types (pfz, hc, aquifer) 4.2 Lengths/positions 4.3 Temperature and pressure 4.4 Well trajectory (deviated, horz) 4.5 Well location (onshore, offshore) 4.6 Radioactive sources 4.7 Operational barriers*  Material consideration for barriers 5.1 Cementacious 5.2 Non-cementacious (resins, etc) 5.3 Natural/earth (compact, subsiden, salt, etc) 5.4 Mechanical 5.5 Environment Joe Shine - WG WA - 2016 E&P Summer Std Mtg – SC10 - CSOEM7  Installation 6.1 Well geometry 6.2 Software placement simulations 6.3 Placement methods best practices 6.3.1 Plugs 6.3.2 Squeezes  Evaluation and verification criteria 7.1 Annulus 7.1.1 Wireline logs 7.1.2 Pressure match and post job eval 7.2 In-pipe 7.2.1 Physical/mechanical tests 7.2.2 Hydraulic tests (positive and in-flow*) # Annex A Lab Testing # Bibliography

8 Forward plan 8Joe Shine - WG WA - 2016 E&P Summer Std Mtg – SC10 - CSOEM August conference call  Collaborate on building out each sub-sections for 4, 5, 6, and 7  Discuss for each what to cover including any specifics/points  Capture content/notes and send out for review/edits/feedback October conference call  Discuss E-3 re-write incorporation to streamline (if available)  Based upon Aug content (and E-3), assign section leads Section leads - 4, 5, 6, 7  Start drafting sub-sections 4, 5, 6, 7 based on WG notes (and E-3)  Report monthly updates to WG chair  Bi-monthly conference calls with WG on section progress/feedback  Sections submitted to WG for peer review/feedback/edits before calls

9 Finally 9Joe Shine - WG WA - 2016 E&P Summer Std Mtg – SC10 - CSOEM Winter conference 2017  Check alignment with TR1 re-write  Report update to SC 10

10 WG Charge “Identify literature and gaps associated with well plugging and abandonment for both offshore and onshore environments. Present findings to serve as foundation to develop a RP” 10Joe Shine - WG WA - 2016 E&P Winter Std Mtg – SC10 - CSOEM


Download ppt "WG05: Well Abandonments CSOEM – SC 10 – Subcommittee on Well Cements 2016 Exploration & Production Summer Standards Meeting Washington D.C. Joe Shine –"