Presentation is loading. Please wait.

Presentation is loading. Please wait.

API RP 16ST June 2017 Coiled Tubing Well Control Equipment Systems

Similar presentations


Presentation on theme: "API RP 16ST June 2017 Coiled Tubing Well Control Equipment Systems"— Presentation transcript:

1 API RP 16ST June 2017 Coiled Tubing Well Control Equipment Systems
Chairman – Alex Sas-Jaworsky PE Vice-Chairman – Steve Deshotels Secretary – Jessica Lin

2 History First Edition – March 2009 Reaffirmed December 2014
Second Edition – TG Work Continues 1220 L Street, NW • Washington, DC •

3 Current Activities “Success Path” Evaluation of CT Well Control Barriers Completed Recommended Changes in CT Unit Accumulator Configuration Adopted (Compliance with API Spec 16D) Scheduled WebEx Meetings Focused on Revising Section Text by 4th Qtr. 1220 L Street, NW • Washington, DC •

4 Current Activities Continuing Work With STD 53 and TG-1 to Maintain Consistency Where Well Control Concerns are Common Between Equipment and Applications Projecting Completion of RP Section Rewrites in 1st Qtr 2018 Projecting Submission of 1st Letter Ballot in 2nd Qtr 2018 1220 L Street, NW • Washington, DC •


Download ppt "API RP 16ST June 2017 Coiled Tubing Well Control Equipment Systems"

Similar presentations


Ads by Google