SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Robert Urbanowski Vice-Chair: Mark Trevithick.

Similar presentations


Presentation on theme: "SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Robert Urbanowski Vice-Chair: Mark Trevithick."— Presentation transcript:

1 SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Robert Urbanowski Vice-Chair: Mark Trevithick

2 SC8/TG1 Coverage – API SPEC 4F & RP 4G Chair – Mark Trevithick Document Status −Spec 4F 3 rd ed. published January, 2008 −RP 4G published April, 2012 Ongoing Activity – −Purchasing Guide Letter Ballot resolved −Processes Requiring Validation Ballot resolved −Spec 4F revision is in process. Final comments and edits have been submitted; publication should be very soon.

3 SC8/TG2 Coverage – API SPEC 7K and RP 7L Chair – Shawn Firenza Document Status −Spec 7K 5 th ed. published June 2012, Errata published August, 2010 −RP 7L, reaffirmed August, 2012 Ongoing Issues – −Purchasing Guideline Draft in process −Processes Requiring Validation Ballot Resolved, changes to be published with next revision −Spec 7K revision upcoming to accommodate update to Slips coverage, Nonmetallic Tong coverage, as well as other balloted changes

4 SC8/TG3 Coverage – API SPEC 8A, 8C, & RP 8B Chair – Ken Kondo Document Status −Spec 8A 13 th ed. Withdrawn June, 2012 −Spec 8C 5 th ed. published April, 2012 −RP 8B reaffirmed August, 2012 Ongoing Issues – −Purchasing Guideline Draft in process −Processes Requiring Validation Ballot Resolved, changes to be published with next revision −Errata to be published −Spec 8A withdrawal notification issued August, 2012. All licenses will be withdrawn February 1 st, 2013.

5 SC8/TG4 Coverage – API SPEC 7F, 9A & RP 9B Chair – Dennis Fetter Document Status −Spec 7F 8 th ed. published November, 2010 −Spec 9A 26 th ed. published May, 2011. Errata published October, 2012 −RP 9B 13 th ed., published October, 2011. Errata published April, 2012, and January, 2013 Ongoing Issues – −Purchasing Guideline Complete −Processes Requiring Validation Complete